This document is an Amendment No. 1 to Competitive Sealed Proposal (CSP) 24-071 issued by the City of Missouri City, Texas for the Construction of a Parks and Facility Maintenance Building. The amendment incorporates additional plan sheets M4.01 and M5.01. All other terms and conditions specified in the original CSP 24-071 remain the same.
The CSP 24-071 solicits responses from interested contractors to perform the specified work. Responses are due by 4 PM Central Daylight Time on April 24, 2024 to the City Secretary's Office. A non-mandatory pre-proposal conference is scheduled for 9 AM CDT on March 27, 2024 at City Hall. The City reserves the right to reject any or all responses and make awards in the best interest of the City.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_File_353538_Accessing Amendment No. 2 CSP 24-071.pdf | ||
| ESBD_File_353538_Accessing CSP 24-071.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 1
CSP 24-071
AMENDMENT NO. 1
COMPETITIVE SEALED PROPOSAL (“CSP”) 24-071
CONSTRUCTION OF A PARKS AND FACILITY MAINTENANCE BUILDING
March 20, 2024
The City of Missouri City (“CITY”), Texas has issued this Amendment No. 1 to the above-referenced CSP to incorporate Plan Sheets M4.01 and M5.01 attached herein.
All other terms and conditions specified in CSP 24-071 shall remain the same.
Kevin M. Coleman, MS, C.P.M.
Procurement Manager City of Missouri City, Texas E-mail: Bids@Missouricitytx.gov mailto:Bids@Missouricitytx.gov
System Operation - When system start-up has been initiated, the following sequences shall be implemented:
The fan coil unit shall be integrated with the EMCS to monitor fan status, schedule run times, and to adjust space temperature setpoints. The associated outside air motorized isolation damper shall be interlocked with the fan coil unit operation such that the damper is open when the fan coil unit is energized and closed when the fan coil unit is de-energized.
COOLING MODE: When the space temperature is above the Cooling Setpoint, the chilled water coil control valve shall be modulated between 0-100%, to maintain the space temperature within +/- 0.5 °F of the Cooling Setpoint.
The chilled water coil discharge temperature shall not be allowed to go below the chilled water coil low-limit setpoint.
HEATING MODE: When the space temperature is below the Heating Setpoint, the heating control valve shall be modulated to maintain the space temperature within +/- 0.5 °F of the Heating Setpoint.
System Setpoints - The setpoints for the system shall be set as follows:
The Cooling Setpoint shall be set initially at 80 °F (adjustable).
The Heating Setpoint shall be set initially at 65 °F (adjustable).
The design airflow rates shall be set at the values given in the Mechanical Drawings.
System Alarms - The EMCS shall generate an alarm as follows:
If the space temperature is 5 °F (adj.) above the cooling setpoint for 5 minutes (adj.).
If the space temperature is 5 °F (adj.) below the heating setpoint for 5 minutes (adj.).
If the current sensor relay indicates a supply fan failure status.
Outdoor Air Conditions The sensors shall be mounted in an area on the north side of the building where the representative temperature and humidity can be monitored, both shall have sun shields. Based on the outdoor air temperature and humidity the EMCS shall calculate the outdoor air enthalpy, wet bulb and dew point temperatures. These outdoor air conditions shall be broadcast as global data points for use by other control programs. These shall be displayed on all major air and water systems graphics.
Intelligent Lighting Controls Integration The EMCS shall provide BACnet/IP communications to the Lighting Control System interface module to monitor and control the building and site lighting. The interface shall be provided by the manufacturer per Division 26. The EMCS shall monitor and control the lighting circuits as shown on the Electrical Drawings.
IDF/MDF Room Monitoring The EMCS shall monitor the space temperature and humidity in the IDF and MDF rooms. The primary cooling for IDF and MDF rooms will be supplied by the packaged computer room units. The EMCS shall report high/low temperature/humidity alarms to the computers, pagers, and/or text message compatible devices designated by the Owner. Alarms shall be sent if the space conditions deviate from the following, temperature between 60 °F and 80 °F (adj), humidity between 40% RH and 70% RH (adj), for more than 10 minutes.
HVAC Ventilation Emergency Shutdown Switch A mushroom button type, local override switch shall be installed to deactivate the building's ventilation and exhaust systems in case of emergency. All 100% outside air conditioning units or outside air supply fans shall be deactivated and all outside air dampers shall be closed. All exhaust and relief fans shall be deactivated and their associated isolation dampers shall be closed. Once depressed, the switch must be manually reset to allow the ventilation and exhaust systems to resume normal operation. The final location of the switch shall be determined by the Owner.
Fire Riser Room Monitoring The EMCS shall monitor the space temperature in the fire riser room. The primary heating for room will be supplied by an electric unit heater. The EMCS shall report low temperature alarms to the computers, pagers, and/or text message compatible devices designated by the Owner. Alarms shall be sent if the space conditions deviate from the following, temperature below 50°F (adj.) for more than 10 minutes.
Apparatus Bay Monitoring The EMCS shall monitor the space temperature in the apparatus bay. The primary heating for room will be supplied by gas unit heaters. The ECMS shall report low temperature alarms to the computers, pagers, and/or text message compatible devices designated by the Owner. Alarms shall be sent if the space conditions deviate from the following, temperature below 50°F (adj.) for more than 10 minutes.
The EMCS shall determine the status of apparatus bay exhaust and supply fans and report an on/off status.
HVLS Fans The EMCS shall be integrated with the HVLS controller to monitor and command fan status, speed, and rotation. The EMCS shall report alarms to the computers, pagers, and/or text message compatible devices designated by the Owner.
System Operation - When system start-up has been initiated, the following sequences shall be implemented:
The exhaust fan shall energize when the space temperature exceeds the active Space Temperature Setpoint.
System Setpoints - The setpoints for the system shall be set as follows:
The Space Temperature Setpoint shall be set initially at 85 °F (adjustable).
System Alarms - The EMCS shall generate an alarm as follows:
If the current sensor relay, CSR, proves current but the fan status does not prove on.
WALL SENSOR/THERMOSTAT
CARBON DIOXIDE SENSOR
SET POINT
SUPPLY AIR
RETURN AIR
OUTSIDE AIR
HEATING COIL
COOLING COIL
DIRECT EXPANSION COOLING COIL
PRESSURE INDEPENDENT CHARACTERIZED
CONTROL VALVE
AIRFLOW CROSS
DIFFERENTIAL PRESSURE SWITCH
ANALOG INPUT
ANALOG OUT PUT
DIGITAL/BINARY INPUT
DIGITAL/BINARY OUTPUT
ON-OFF MOTORIZED DAMPER
MODULATING TYPE MOTORIZED DAMPER
AIR FLOW MEASURING STATION
CONTROL VALVE MODULATING TYPE
VARIABLE FREQUENCY DRIVE
CURRENT SENSING RELAY
FREEZESTAT
HIGH STATIC LIMIT
STATIC PRESSURE TRANSMITTER
DIFFERENTIAL PRESSURE TRANSDUCER
FLOW METER
FLOW SWITCH
DISCHARGE AIR TEMPERATURE SENSOR
M4.01
SHEET TITLE
SHEET NUMBER
ZCA PROJECT #
2014 Ziegler Cooper Architectsc Architect shall own the overall conceptual design prepared and developed for the project on the intangible exclusive rights or copyright therein.
ISSUES
700 Louisiana Street, Suite 350 Houston, Texas 77002
713.374.0000 www.zieglercooper.com
REVISIONS
MEP ENGINEER
DBR Engineering Consultants, Inc.
9990 Richmond Ave, Suite 300
Houston, Texas 77042 713.914.0888
CONSULTANT 2
Engineering Company, Inc.
1111 Street, Suite 666 Houston, Texas 77002
713.374.0000
CONSULTANT 3
Engineering Company, Inc.
1111 Street, Suite 666 Houston, Texas 77002
713.374.0000
CONSULTANT 3
Engineering Company, Inc.
1111 Street, Suite 666 Houston, Texas 77002
713.374.0000
DATE DESCRIPTION
Project #
MISSOURI CITY
PARKS & BUILDING
MAINTENANCE
FACILITY
NO DATE DESCRIPTION
05-13-2022 ISSUED FOR BID
10-11-2023 50% CD PROGRESS SET
11-03-2023 ISSUE FOR PERMIT
02-29-2024 ISSUE FOR BIDDING
MECHANICAL
CONTROL
DIAGRAMS
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
RETURN
AutoCAD SHX Text
AIR
AutoCAD SHX Text
AI
AutoCAD SHX Text
TEMPERATURE SENSOR
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text Fan Coil Unit - Control Diagram and Sequence
AutoCAD SHX Text
AIR
AutoCAD SHX Text
FAN START CIRCUIT
AutoCAD SHX Text
BO
AutoCAD SHX Text
BI
AutoCAD SHX Text
NOTES: 1. PROVIDE 2-WAY CONTROL VALVE PER SPECIFICATIONS.
AutoCAD SHX Text
BO
AutoCAD SHX Text
MD
AutoCAD SHX Text
CSR
AutoCAD SHX Text
OUTSIDE
AutoCAD SHX Text
AIR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
AO
AutoCAD SHX Text
HWR
AutoCAD SHX Text
MCV
AutoCAD SHX Text
NOTE 1
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text
CHS
AutoCAD SHX Text
AO
AutoCAD SHX Text
CHR
AutoCAD SHX Text
MCV
AutoCAD SHX Text
NOTE 1
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
MISCELLANEOUS SYSTEMS
AutoCAD SHX Text
AutoCAD SHX Text
AI
AutoCAD SHX Text
WALL TEMP SENSOR
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text Exhaust Fan Elec Room (EF-2)
AutoCAD SHX Text
(EC MOTOR CONTROL)
AutoCAD SHX Text
BI
AutoCAD SHX Text
(STATUS)
AutoCAD SHX Text
BO
AutoCAD SHX Text
(START/STOP)
AutoCAD SHX Text
CSR
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
CONTROL SCHEMATIC LEGEND
AutoCAD SHX Text
MD
AutoCAD SHX Text
MMD
AutoCAD SHX Text
AFMS
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text
CO2
AutoCAD SHX Text
DI/BI
AutoCAD SHX Text
DO/BO
AutoCAD SHX Text
AO
AutoCAD SHX Text
AI
AutoCAD SHX Text
MCV
AutoCAD SHX Text
VFD
AutoCAD SHX Text
CSR
AutoCAD SHX Text
FRZ
AutoCAD SHX Text
HSL
AutoCAD SHX Text
SP
AutoCAD SHX Text S/A
AutoCAD SHX Text R/A
AutoCAD SHX Text O/A
AutoCAD SHX Text
HC
AutoCAD SHX Text
CC
AutoCAD SHX Text
PICCV
AutoCAD SHX Text
AFC
AutoCAD SHX Text
DPS
AutoCAD SHX Text
SPT
AutoCAD SHX Text
DPT
AutoCAD SHX Text
FM
AutoCAD SHX Text
DX
AutoCAD SHX Text
FS
AutoCAD SHX Text
DAT
AutoCAD SHX Text DBR Project Number
AutoCAD SHX Text
713.914.0888 p
AutoCAD SHX Text Houston, Texas 77042
AutoCAD SHX Text 9990 Richmond Avenue
AutoCAD SHX Text South Building, Suite 300
AutoCAD SHX Text
713.914.0886 f
AutoCAD SHX Text TBPE Firm Registration No. 2234
AutoCAD SHX Text 200269.000
AutoCAD SHX Text
WM
AutoCAD SHX Text
VL
AutoCAD SHX Text
DT
AutoCAD SHX Text
AH
AutoCAD SHX Text
SS
AutoCAD SHX Text
COMBUSTION AIR CALCULATION:
ROOM SERVED: GARAGE
ROOM VOLUME: 127,789 ft³
GAS FURNACE EQUIPMENT INPUT:
UNIT HEATER (GUH-1, GUH-2, GUH-3): 3@ 150 MBH
EACH
TOTAL INPUT RATING (GUH-1,2): 450 MBH OR 450,000 BTU/H
TOTAL INPUT RATING/1000: 450,000/1000: 450
TOTAL ROOM VOLUME/ (TOTAL INPUT RATING/1000):
127,789/450:283.98 283.98>50
NO ADDITIONAL AIR REQUIRED.
M5.01
SHEET TITLE
SHEET NUMBER
ZCA PROJECT #
2014 Ziegler Cooper Architectsc Architect shall own the overall conceptual design prepared and developed for the project on the intangible exclusive rights or copyright therein.
ISSUES
700 Louisiana Street, Suite 350 Houston, Texas 77002
713.374.0000 www.zieglercooper.com
REVISIONS
MEP ENGINEER
DBR Engineering Consultants, Inc.
9990 Richmond Ave, Suite 300
Houston, Texas 77042 713.914.0888
CONSULTANT 2
Engineering Company, Inc.
1111 Street, Suite 666 Houston, Texas 77002
713.374.0000
CONSULTANT 3
Engineering Company, Inc.
1111 Street, Suite 666 Houston, Texas 77002
713.374.0000
CONSULTANT 3
Engineering Company, Inc.
1111 Street, Suite 666 Houston, Texas 77002
713.374.0000
DATE DESCRIPTION
Project #
MISSOURI CITY
PARKS & BUILDING
MAINTENANCE
FACILITY
NO DATE DESCRIPTION
05-13-2022 ISSUED FOR BID
10-11-2023 50% CD PROGRESS SET
11-03-2023 ISSUE FOR PERMIT
02-29-2024 ISSUE FOR BIDDING
MECHANICAL
SCHEDULES
AutoCAD SHX Text DBR Project Number
AutoCAD SHX Text
713.914.0888 p
AutoCAD SHX Text Houston, Texas 77042
AutoCAD SHX Text 9990 Richmond Avenue
AutoCAD SHX Text South Building, Suite 300
AutoCAD SHX Text
713.914.0886 f
AutoCAD SHX Text TBPE Firm Registration No. 2234
AutoCAD SHX Text 200269.000
AutoCAD SHX Text
WM
AutoCAD SHX Text
VL
AutoCAD SHX Text
DT
AutoCAD SHX Text
AH
AutoCAD SHX Text
SS
| Amendment No. 1 CSP 24-071.pdf |
| M4.01 |
| Sheets and Views |
| M4.01 |
| M5.01 |
| Sheets and Views |
| M5.01 |
File details come from the government source that posted it. Updated .