ESBD_File_347986_Addendum No. 1 RFP No. 24-1330.pdf

PDF 377 KB Posted

Attached to
Morris Sheppard Dam Bay 9 Transition Beam and Weir Box
Solicitation number
24-1330
Issued by
Palo Pinto County, Texas

About this file

This document is an Addendum No. 1 issued by the Brazos River Authority (BRA) related to RFP No. 24-1330 for the Morris Sheppard Dam Bay 9 Transition Beam and Weir Box project. The RFP seeks qualifications from respondents to conduct engineering assessment, investigation, design, and construction phase services for this large high hazard dam project in Palo Pinto County, Texas. The services may include assessment of leakage in Bay 9 Transition Beam, assessment, repair, or replacement of Bay 9 Weir Box, and associated civil, geotechnical, structural, chemical, and forensic structural engineering. The addendum provides clarification on the 20-page limit for submittals, confirming that certain required forms and documents do not count towards the limit.

The addendum also addresses questions related to the required information for proposed engineers, clarifying that the BRA only needs to see the PE Branch detail for structural engineers. There are no details provided on pricing, set asides, incumbents, funding requirements or sources, or contract term and renewal options.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1

Brazos River Authority

January 30, 2024

Addendum No. 1

Morris Sheppard Dam Bay 9 Transition Beam and Weir Box RFP No. 24-1330

It is the responsibility of the Respondent to assure and guarantee by acknowledging the receipt of this Addendum in the Bid that the Respondent has received the Addendum in its entirety, and that the Respondent accepts all conditions contained herein.

Questions and Answers

Q1: Related to page 6, Question 3 – Will you please confirm that the required forms for TAB C, HUB Plan, and Section Tabs/Covers do not count toward the 20-page limit (in addition to already stated no count for resumes)?

A1: The suggested 20-page limit on submittals applies to items in Tab A and

Tab B with the noted exception of resumes. Item requirements in Tab C, HUB Plan and any cover pages, table of contents, section covers, etc. do not apply to the suggested 20-page limit.

Q2: Related to page 7, TAB B, Question 3 - Does the BRA want to see the branch of engineering for all proposed engineers, or just the ones with the II or 16-hour exams?

A2: We only need to see the PE Branch detail for Structural Engineers.

Sincerely, Allison Sheeler Purchasing Agent