ESBD_File_347256_SOLICIEXH_F.6_Statement of Work 405-24R0006862 285-36.pdf
PDF 2 MB Posted
- Attached to
- San Antonio Gate Controller
- Solicitation number
- 405-24R0006862
- Issued by
- Bexar County, San Antonio City, Texas
About this file
This document is a Statement of Work for a solicitation issued by the Texas Department of Public Safety (DPS) for the installation of a new CSL24UL Slide gate operator at the San Antonio DPS Headquarters. The work includes furnishing and installing the new gate operator, safety components, solar panel and battery system, and providing training. The project is located at the San Antonio DPS Headquarters at 6502 S New Braunfels Ave. Interested vendors must attend a mandatory pre-bid site visit on 1/17/2024 at 10:00 AM Central Time. The contract requires the work to be completed within a short timeframe to minimize disruption to DPS operations.
The contract does not provide specific pricing terms, set asides, or funding details. The successful vendor will be responsible for all labor, materials, and permitting required to complete the turnkey project as specified. DPS will provide a staging area for the contractor's use during construction. The contractor must comply with all state and local codes and ordinances, and provide manufacturer certifications, warranties, and O&M manuals upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SOLICIEXH_F.6_STATEMENT OF WORK 405-24R0006862 936-37
TEXAS DEPARTMENT OF PUBLIC SAFETY SCOPE OF WORK
The Texas Department of Public Safety (DPS) is requesting Bid Solicitations for a CSL24UL Slide gate operator with installation. See the attached scope of work, drawings and specifications for more information.
Project San Antonio DPS Headquarters 6502 S New Braunfels Ave San Antonio TX 78223
Department of Public Safety Contract Monitor:
Michael Studebaker Project Manager DPS HQ, Austin Texas
PH: 512-424-2127 MO: 512-925-0777
michael.studebaker@dps.texas.gov
Department of Public Safety Site Contact:
Michael Studebaker Project Manager DPS HQ, Austin Texas
PH: 512-424-2127 MO: 512-925-0777
michael.studebaker@dps.texas.gov
NOTE: Building contacts will be identified to the bidders for the respective locations for site visits and future access.
Access times for each phase of construction must be scheduled ahead of actual work.
Table of Contents - Specification Sections Section 01 11 00 Summary of Work / Scope of Work Data Sheet Reference Guide Schematic Drawing
SECTION 01 11 00 – SUMMARY OF WORK - DEMOLITION AND CONSTRUCTION
SECTION 1.0 GENERAL
1.01 SCOPE OF WORK
This section outlines the scope of work included in the project. Refer to the appropriate drawings and specification sections for further information about installation, preparation methods and components to be provided. The contractor is responsible for including all means and methods necessary to complete this portion of the project. The contract Documents, otherwise referred to as drawings, shall serve as a part of this scope of work showing more detail on the intent of this project. The Contractor is responsible for including all means and methods necessary to complete this project. In general, the work includes, but is not limited to, the following items:
1. See Contract Drawings for complete understanding of demolition and construction scope. This list is generic in nature for major items and intended only to give an overview of general project scope.
2. Furnish and install new Lift master IHSL-24UL Solar Slide Gate operators.
Include:
4- Mounting Posts 2 for each operator 2- Safety reversing bump edges w/ receiver and transmitter 2- Safety draw-in bump edges 2- 60 watt 24-volt solar panel w/mounting brackets 4- 33AH Batteries 2- Battery mounting trays 2- 33AH harnesses
10 - Liftmaster remotes- 2 button – one button works each gate.
3. Connect to operators to existing box gate.
4. Ensure gate is level and on even plane across driveway
5. Provide training for gate operation.
6. Provide turnkey project as indicated and as required for complete project
1.02 QUALITY CONTROL
1. Contractor is responsible for properly disposing of all trash, or construction debris associated with this project. Removal shall not utilize DPS dumpster or equipment unless authorized by DPS.
2. DPS will identify an exterior staging area/ entry for use by the contractor. This temporary storage must be maintained in a neat orderly manner and restored to original condition upon completion.
3. Any container used as part of this contract is subject to inspection upon being located on DPS property.
4. Contractor shall efficiently schedule all work to ensure work will be done in as few calendar days as possible for optimum installation to meet the manufacturer’s warranty requirements. All work shall be continuous to ensure the facility impact is minimal with limited disruptions. Every effort shall be made to eliminate down time and get the DPS operations back in service as quickly and safely as possible. The exact dates will be coordinated once the bid award is made.
5. All work will be performed by qualified craft persons with a minimum of (3) three years of experience in the field. It shall be the contractor’s responsibility to provide only skilled qualified workers for this project.
6. The new work shall comply with the state and local codes and ordinances.
7. Attached contract drawings may include other trade work for reference and coordination.
1.03 PERFORMANCE REQUIREMENTS
1. The Work requirements of the Contract are summarized by reference to the Bidding Requirements, the
Contract forms, the Conditions of the Contract, the Specification, the Drawings, and Addenda and
Contract Modifications, including, but not limited to, the printed matter referenced in these requirements. It is recognized that the Work is affected or influenced by governing regulations, natural phenomenon (including weather conditions), unforeseen conditions uncovered by the Work, and other forces outside of the Contract Documents.
2. All work shall be considered new unless otherwise indicated.
3. All workmanship and materials shall be of the best construction practice. Should a conflict arise between the specification requirements and those of the referenced publications, the better quality or more stringent requirement will prevail. Specification requirements that exceed the minimum requirements of the manufacturer shall be compiled with by the Contractor.
4. The Contractor shall check and verify all dimensions, notes, conditions in the installation area on site before any construction work is started. All discrepancies shall be reported to DPS in writing. No extra charge of compensation will be allowed on account of any difference between actual measurements and measurements or dimensions supplied by DPS, either verbally or in written form.
5. The Contractor shall assume full responsibility for the accuracy, fit and stability of all parts of the work.
6. All labor, materials and installations must comply with the codes, rules and regulations of local, state and federal authorities having jurisdiction. Any discrepancy which exists between the requirements by the plans, specifications, said codes, rules and regulations, shall be immediately brought to the attention of DPS Facilities Department, in writing for resolution.
7. Applicable publications: Publications listed herein form a part of this Specification to the extent referenced and are indicated in the text by basic designation only. Applicable publications referenced shall be those that were issued and in use at the time of the Bid Submission.
8. The Contractor shall provide all necessary protection of existing work and newly added work.
9. The Contractor shall be responsible for adequately bracing and protecting all work during construction against damage, breakage, collapse, distortion and misalignment according to applicable codes and standards.
10. Working hours will be between 7:00 am and 5:00 pm during the week and as approved during the weekend if necessary. DPS needs to be clean and ready for work as soon as work is complete. If additional time is necessary for the specified products, schedule must be coordinated with DPS before any work begins.
11. The Contractor shall repair and restore to its original condition all work and items damaged as a result of building operations and shall leave the work completed to the true intent of the drawings and specifications and to the satisfaction of DPS.
12. Any disturbance or damage to the existing building, site or utilities resulting from either directly or indirectly from the building operations shall be promptly repaired, restored or replaced to the satisfaction of DPS at no additional cost to DPS.
13. All materials and construction to be incorporated in the work shall be in strict accordance with the latest editions of IBC and shall conform to the standards and recommendations of the various trade institutes where applicable.
14. The Contractor shall coordinate the work of any and all Sub-Contractors and also coordinate with DPS on portions of the work done by DPS employees or sub-contractors.
15. Manufacturer's Instructions:
a. Require compliance with instructions in full detail, including each step in sequence. Do not omit preparatory steps or installation procedures unless specifically modified or exempted by the SOW.
b. Should instruction conflict with Contract Documents, request clarification from DPS Contact before proceeding.
16. Manufacturer's Certificates:
a. When required in individual specifications section, submit manufacturer's certificate, in duplicate, certifying that products meet or exceed specified requirements, executed by responsible officer.
1.04 PROJECT CONDITIONS
1. The building will be occupied and in use during construction, take necessary precautions to create as little3 disturbance or disruption to the building and its occupants as possible during work hours.
2. Supply, install, and maintain barriers, protection, warning lines, lighting, and personnel required to segregate the work area(s) from pedestrian or vehicular traffic, as well as to prevent damage to the building, its occupants, and the surrounding landscaped and paved areas. The Contractor shall observe all applicable OSHA requirements.
3. Schedule and execute work without exposing the building interior to the effects of inclement weather.
Protect the building and its occupants against such risks and repair/replace work related damage to DPS’s satisfaction.
1.05 PRECONSTRUCTION CONFERENCE
1. A preconstruction conference may be held with DPS Staff as required, Contractor, and involved trades to discuss all aspects of the project. The Contractor's foreman or field representative will attend this conference.
2. DPS shall reserve the right to require an alternate superintendent and/or foreman.
3. Delivery of materials and commencement of construction shall not proceed until the preconstruction conference is held unless authorized by the DPS Contract Monitor.
4. Provide a line item breakdown of construction labor and materials costs for each Specification Section included in these Contract Documents.
1.06 EMERGENCY RESPONSE
1. The Contractor shall provide DPS with after-hours (24 hour) emergency telephone numbers of the
Contractor’s superintendent and foreman.
2. The Contractor must respond to emergency situations or calls within two (2) hours.
1.07 SUBMITTALS UPON AWARDED CONTRACT
1. Provide:
a. Manufacturer’s technical data.
b. Application or installation instructions.
c. Substitution Request Form, if necessary.
2. Provide schedule of installation as part of this requirement.
3. Provide samples and manufacturer’s literature for all products used on this project.
4. Provide certificates signed by the manufacturer certifying that installers comply with specified requirements.
5. All bidders shall submit information of not less than three (3) projects of similar size and complexity to include:
a. Project name and location.
b. Products installed.
c. Date of completion.
d. Owner’s contact name and telephone number.
6. Provide maintenance data for O&M (Operations and Maintenance) Manuals.
7. Provide warranty information to be turned over to the Owner at Substantial Completion.
8. All submittals, samples and documentation required should be sent to DPS Contract Monitor.
1.08 SCHEDULING
1. All field work installations at the listed location shall be scheduled to facilitate continued facility usage as required by DPS.
2. Prior approval must be received from local DPS staff if scheduled project tasks may impact regular DPS facility operational schedule.
3. Proper coordination of all aspects of the work by the Contractor and any sub-trades is critical to ensure proper installation and performance of the work. The Contractor’s Construction Schedule shall clearly outline the coordination between job tasks of all involved disciplines. Subject to review and acceptance by the DPS, this Schedule will be strictly adhered to by the Contractor and sub-trades.4
4. DPS shall review the Contractor’s Construction Schedule prior to the start of any work. After defining the location(s) of the work progress, DPS shall arrange to control occupancy in the building to the greatest extent possible. It shall be the responsibility of the Contractor to supply DPS with written notice, 72 hours in advance, if his work location(s) for a workday is different from the schedule. The Contractor shall update his Construction Schedule weekly and submit a copy to DPS for review.
1.09 SPECIAL CONSIDERATIONS
1. Even if it is not anticipated, the contractor may be required to shut down operations during the project for an unforeseen State of Texas emergency. In this event, the contractor will be required to finish any open work, secure the site staging area, and evacuate his/her personnel as safely but as quickly as possible from the property. Notification to return to work will be issued as soon as possible from authorized DPS personnel.
2. Any Propane tanks, gas cylinders or other flammable/hazardous materials must be secured and stored in a safe industry acceptable manner when in use or when they are being stored for future use at this or any DPS facility. Storage locations and quantities are to be identified to the affected Building Manager for the duration of the contract.
3. Contractor vehicles used for transport of personnel or materials shall be locked with the emergency brake set and the ignition key removed when left unattended. Parking or storage must be located only in approved areas determined by the local building manager. DPS shall not be responsible for damage by others to Contractor personal vehicles left on the project site. Any vehicle or equipment without an ignition key starter shall be rendered inoperable if left overnight. Also, any Vehicle or large equipment with a common industrial type of ignition source shall be rendered inoperable if left overnight. Security and safety of tools or equipment shall be the responsibility of the contractor during work and after regular business hours. Items such as ladders must be removed and secured prohibiting unauthorized access to the facility.
4. The facility shall not be left open by removal of any building component without prior knowledge of the DPS Building Manager. All removed openings are to be left secure with new products at the end of each work day or reasonably secured with 3/4” plywood or industry standard plugs. Temporary fillers must be cut to size and screwed securely into the opening in the event new component material need to be altered if the first attempt fails to fit an opening.
5. Contractor will be required to provide operation demonstration to the identified staff for future maintenance needs along with other information on warranty, maintenance manuals or other related details. Warranty information is subject to approval by DPS Office of General Counsel. Counsel may advise as to the warranty details that are not in compliance to state law or must be changed not to violate agency policy.
1.10 DEFINITIONS
1. DPS: Texas Department of Public Safety = Owner.
2. Contractor: Primary party responsible for coordination of their own employees or their respective sub-contractor groups to complete the contract project to meet these specifications.
3. Installer/Applicator/Erector: Entity engaged by Construction Manager as an employee, Subcontractor, or
Sub- subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.
4. DPS Contact/Contract Monitor: Owner’s primary representative for this project having authority to communicate project details and accept or deny final installation completion.
5. TDLR-TAS: Texas Department of Licensing and Regulation – Texas Accessibility Standards.
1.11 PREFERRED PRODUCTS
1. Pursuant to Texas Government Code 2155.444 and 2155.4441, when quality, availability, and price of materials are comparable, provide those produced within the following distances from the Project site (listed in order of preference): 1. Within the State of Texas and within 500 miles; 2. Within the State of Texas and greater than 500 miles; 3. Within the United States and within 500 miles; 4. Within the United5
States and greater than 500 miles; 5. Outside the United States and within 500 miles; 6. Outside the United States and greater than 500 miles.
1.12 CONTRACT METHOD
1. Project may be constructed under a single prime contract at the discretion of DPS.
2. Contractor is mandated to make a scheduled site visit prior to sending in their bid proposal.
3. DPS reserves the right to reduce Scope of Work. In such cases, DPS will send out a revised Scope of
Work to bidders for a revised bid.
1.13 WARRANTY
1. Contractor shall furnish a single, written warranty covering 100% of the new material and labor costs protecting the owner, for a period of one (1) years from date of Substantial Completion.
2. In the event of component damage from the use of incompatible materials, or during installation any accident, mishandling, improper transportation methods or negligence on part of the Contractor or Sub- Contractor forces, the Primary Contractor shall be responsible for replacement at no cost the DPS.
3. Refer to specific sections of the specification for systems and product warranty requirements. Verify with Manufacturer of proposed systems and products that specified warranty requirements are acceptable, without exception, prior to selecting materials for use on this project.
4. Submit a full Contractor's Guarantee of the Work to be free from defect in materials and workmanship upon Substantial Completion, and prior to final payment. This Guarantee shall be for a period of one (1) years from the date of Substantial Completion, and shall be signed by a Principal of the Contractor’s firm, and sealed if a corporation.
5. If requested by DPS, submit a letter from the manufacturer acknowledging that completed Work is acceptable and that warranty remains in effect.
1.14 FINAL INSPECTION AND PAYMENT
1. Inspections: DPS will conduct inspections of the project to verify work is in general compliance with the project intent, Contract Documents, and specifications prior to issuing payments to the Contractor. Inspections will be done by DPS Contract Monitor or designated representative and may be conducted at any time, prior to payments and at a minimum prior to any payments to the Contractor.
2. Final Inspection: The Contractor and the DPS Contract Monitor or designated representative shall provide a comprehensive final inspection after completion of the project. All application errors shall be addressed and final punch list items completed prior to rendering any final payments.
3. Prior to DPS final acceptance of the project and completion of receiving reports for applications for payment, the contractor shall return all security badges, issued to the contractor and sub-contractors for access to DPS facilities, to the Contract Monitor.
1.15 PERMITS
1. The Contractor will obtain and pay for any and all permits required to perform the work.
1.16 PRE-JOB DAMAGE SURVEY OF FACILITY
1. Perform a thorough pre-job survey of property and all affected and adjacent areas of the building with DPS prior to starting the work in order to document existing damage. Damaged items identified during the survey will not be the responsibility of Contractor unless further damaged by the Contractor during execution of the project.
2. Documentation recorded during this meeting (pictures and videos) will be sent to DPS in order to review at the end of the project. It is the responsibility of the contractor to provide this documentation.
PART 2- PRODUCTS ( NOT USED)
PART 3 - EXECUTION 6
Spec Rev. 07-05-2016 6 01 11 00 Page
3.0 EXAMINATION
1. Contractor shall check and verify all dimensions, notes, conditions and location of existing poles, cables or equipment in the installation area on site before any construction work starts. All discrepancies shall be reported to DPS Contact. No extra charge of compensation will be allowed on account of any difference between actual measurements and measurements or dimensions supplied by DPS, either verbally or in written form.
2. Examine substrates and conditions under which Work is to be performed. Do not commence work over unsatisfactory conditions detrimental to proper and timely execution of Work.
3. Do not proceed with Work until unsatisfactory conditions have been corrected.
4. Commencement of installation constitutes acceptance of conditions and cost of any corrective measures are the responsibility of the Contractor.
5. The Contractor is responsible for notifying the DPS Contact should there be a discovery of asbestos during the demolition process. In such cases, Work will cease until there is a resolution and permission from DPS Contract Monitor to commence work.
6. Ensure preparatory works are correctly done prior to main work.
END OF SUMMARY OF WORK
Spec Rev. 07-05-2016
7 01 11 00 Page
BATTERY BACKUP Yes
REMOTE CONTROL ACCESS Security+ 2.0® 3-channel receiver will handle up to 50 remote controls (unlimited remotes with 811LMX/813LMX)
INTERNET CONNECTIVITY myQ® technology monitors and controls the operator through the myQ app
MONITORED SAFETY INPUTS 6 inputs (main and expansion board)
SOLAR-POWER CAPABILITIES Yes
DIAGNOSTIC DISPLAY LED diagnostic display
WIRELESS DUAL-GATE COMMUNICATION Eliminates expensive conduit costs and unsightly driveway scars
POSILOCK® Automatically powers the operator and returns a gate to the closed position when gate is pushed off of closed limit
FIRE DEPARTMENT COMPLIANT Allows gate to auto open upon loss of AC power or battery depletion
LIMIT SETTING Electronic
PROGRAMMABLE AUXILIARY RELAYS Easily add additional features, such as warning lights/alarms
UNAUTHORIZED ACCESS PREVENTION Can be programmed with anti-tailgate or quick close capabilities
HOMELINK® COMPATIBLE Version 4 and higher
OPERATOR SPEED 12 in. per second
POWER 120V/230VAC single phase
ACCESSORY POWER 24VDC, 500mA output; switched and unswitched power
OPERATOR WEIGHT 140 lbs.
WARRANTY 5 years commercial, 7 years residential
TEMPERATURE SPECIFICATIONS Without heater: -4°F (-20°C) to 140°F (60°C); with optional heater: -40°F (-40°C) to 140°F (60°C)
UL USAGE CLASSIFICATION UL 325 & UL 991 listed – class I, II, III and IV
MOTOR 24VDC motor with soft start/stop
OPERATOR DUTY RATING Continuous duty
CHASSIS/FRAME Constructed with 1/4 in. black powder-coated steel for rust prevention
GEAR REDUCTION 10:1 worm gear reducer in synthetic oil bath
CHAIN #41 black oxide (30 ft. included)
COVER High-density, UV-resistant polycarbonate 2-piece cover for excellent heat and corrosion resistance
RECOMMENDED CAPACITIES Rated for gates up to 50 ft. in length or weighing up to 1,500 lbs.
C S L 2 4 U L S L I D E G A T E O P E R A T O R
SECTION 32 31 00
D A T A S H E E T C S W 2 4 U S L I D E G A T E O P E R A T O R
K E Y F E A T U R E S
S P E C I F I C A T I O N S
C O N S T R U C T I O N lbs.
50 ft.
CSL24UL SLIDE GATE OPERATOR
POUNDS
LENGTH
SECTION 32 31 00
D I M E N S I O N S
C A P A C I T Y
© 2022 LiftMaster All Rights Reserved • LiftMaster.com
LMARENDSCSL24UMC21 9/22
C A P A C I T Y
L E F T F R O N T R I G H T
T O P B O T T O M
HCTDCUL
LA500PKGUL
LA412PKGUL
LA400PKGUL
CSW24UL CSL24UL
RSW12UL RSL12UL
HDSL24UL HDSW24UL
S o l a r G a t e C y c l e s Pe r D a y R e f e re n c e G u i d e
LiftMaster Solar Gate Operators feature a best-in-class power management system that delivers power when needed most to operate the gate while minimizing power consumption at all other times. Power is provided to the gate operator via batteries. The batteries are charged from a solar panel(s) connected to the operator.
The number of solar panels required is determined by whether the application is for a single or dual-gate, daily cycle rate, control board current consumption by feature and accessory, and region of the country.
Solar panel(s) must be located in an open area clear of obstructions and shading for the entire day. Snow, heavy charge rate. Solar panels should be cleaned regularly to ensure proper operation. LiftMaster Gate Operators utilizing the solar option in cold weather climates where temperatures reach below -32°F (0°C) for more than 2 consecutive weeks require 33Ah batteries in lieu of weather on batteries and a reduced number of hours of sunlight during the winter months. (see back page for details)
INSL24UL IHSL24UL
Control Board Feature Current Draw (mA)
Main board with no radios learned 2.7
One or more LiftMaster® remote controls learned +1
MyQ® device or wireless dual-gate learned +2.4
Expansion board +11.1
Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) +3.8
Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.)
LA500PKGUL / LA400PKGUL
* Not currently offered in accessory line ** Numbers above for solar daily cycles are representative of wired dual-gate installation. If your installation is a wireless dual-gate setup use single gate cycle estimate and add in power draw for wireless dual-gate feature.
*** When installing LMRRUL/LMTBUL heater option refer to install manual for cycles and standby time.
LA500PKGUL
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
5 52 56 30 33 11 12 22 24 13 14 5 5 15 43 47 23 25 5 6 19 20 10 11 2 3 20 39 43 19 21 3 3 17 19 8 9 1 1
40 24 27 6 8 #NUM! #NUM! 10 12 3 3 #NUM! #NUM!
60 10 13 #NUM! #NUM! #NUM! #NUM! 4 6 #NUM! #NUM! #NUM! #NUM!
5 113 132 67 79 27 32 48 57 29 34 12 14 15 103 122 59 70 20 24 44 52 25 30 8 10 20 98 117 54 65 16 21 42 50 23 28 7 9
50 71 88 30 40 #NUM! 2 30 38 13 17 #NUM! 1
100 29 45 #NUM! 5 #NUM! #NUM! 13 19 #NUM! 2 #NUM! #NUM!
5 212 299 128 181 53 75 91 129 55 78 23 32 15 201 288 118 170 44 66 86 124 51 73 19 29 20 196 282 113 165 40 62 84 121 49 71 17 27
100 114 194 41 86 #NUM! 3 49 83 18 37 #NUM! 1
200 27 93 #NUM! 7 #NUM! #NUM! 11 40 #NUM! 3 #NUM! #NUM!
5 263 300 159 286 66 120 113 203 68 123 28 52 15 252 300 149 275 57 111 108 197 64 118 25 48 20 246 300 143 269 53 106 106 195 62 115 23 45
100 160 300 67 181 #NUM! 35 69 153 29 78 #NUM! 15
250 24 187 #NUM! 39 #NUM! #NUM! 10 80 #NUM! 17 #NUM! #NUM!
SINGLE GATE SOLAR CYCLES PER DAY
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Zone 3 (2 Hrs Sunlight/Day)
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Zone 3 (2 Hrs Sunlight/Day)
DUAL-GATE SOLAR CYCLES PER DAY
Total System Current
Draw (mA)
10W* Solar Panel Note: Must use 24V
Solar Panel
20W Solar Panel Note: 20W would be
(2) 10W 12V panels in series
40W Solar Panel Note: 40W would be
(2) 20W 12V panels or (4) 10W 12V panels in series
60W Solar Panel Note: 60W would be
(6) 10W 12V panels or (2) 20W 12V & (2) 10W 12V in series
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
5 81 87 47 51 18 19 35 37 20 22 8 8 15 68 74 36 39 8 10 29 32 15 17 4 4 20 61 68 30 34 4 5 26 29 13 14 2 2
40 37 43 10 13 #NUM! #NUM! 16 18 4 5 #NUM! #NUM!
60 16 21 #NUM! #NUM! #NUM! #NUM! 7 9 #NUM! #NUM! #NUM! #NUM!
5 100 100 100 100 42 50 76 89 45 53 18 21 15 100 100 92 100 31 38 69 82 39 47 13 16 20 100 100 85 100 25 33 66 79 36 44 11 14
50 100 100 47 63 #NUM! 3 48 59 20 27 #NUM! 1
100 46 70 #NUM! 8 #NUM! #NUM! 20 30 #NUM! 3 #NUM! #NUM!
5 100 100 100 100 83 100 100 100 86 100 35 51 15 100 100 100 100 70 100 100 100 79 100 30 45 20 100 100 100 100 63 97 100 100 76 100 27 42
100 100 100 65 100 #NUM! 5 77 100 28 58 #NUM! 2
200 42 100 #NUM! 11 #NUM! #NUM! 18 63 #NUM! 5 #NUM! #NUM!
Zone 3 (2 Hrs Sunlight/Day)
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
LA400PKGUL SINGLE GATE SOLAR CYCLES PER DAY DUAL-GATE SOLAR CYCLES PER DAY
Zone 3 (2 Hrs Sunlight/Day)
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Total System Current
Draw (mA)
10W* Solar Panel Note: Must use 24V
Solar Panel
20W Solar Panel Note: 20W would be
(2) 10W 12V panels in series
40W Solar Panel Note: 40W would be
(2) 20W 12V panels or (4) 10W 12V panels in series
60W Solar Panel Note: 60W would be
(6) 10W 12V panels or (2) 20W 12V & (2) 10W 12V in series
Current consumption by control board feature 24V (LA500PKGUL, LA400PKGUL) configurations.
Add up current draw by feature and accessory to determine total current draw.
+5.8
Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA) gurations. fig
LA412PKGUL
The map and daily cycle rate shown are approximations based upon the average solar radiation and the temperature effects on batteries in the given regions.
Local geography and weather conditions may require additional solar panels. Solar optimized or wireless accessories are recommended in order to minimize power draw, as added accessories draw power and affect the daily cycle rate. For full details please reference the manual.
7Ah batteries
33Ah battery
7Ah batteries
33Ah battery
7Ah batteries
33Ah battery
7Ah batteries
33Ah battery
7Ah batteries
33Ah battery
7Ah batteries
33Ah battery
6 100 100 82 86 32 34 59 62 35 37 14 15 25 100 100 63 67 17 19 50 53 27 29 7 8 30 100 100 58 63 14 15 48 51 25 27 6 7 50 91 98 40 44 1 2 39 42 17 19 1 1
100 43 49 3 5 #NUM! #NUM! 19 21 1 2 #NUM! #NUM!
6 100 100 100 100 73 82 100 100 76 85 31 35 25 100 100 100 100 55 64 100 100 67 76 24 27 30 100 100 100 100 51 59 100 100 65 73 22 25
100 100 100 77 95 #NUM! 3 78 92 33 41 #NUM! 1
200 75 100 #NUM! 7 #NUM! #NUM! 32 44 #NUM! 3 #NUM! #NUM!
6 100 100 100 100 100 100 100 100 100 100 47 57 25 100 100 100 100 90 100 100 100 100 100 39 48 30 100 100 100 100 85 100 100 100 100 100 37 46 100 100 100 100 100 22 39 100 100 66 86 9 17
200 100 100 51 91 #NUM! #NUM! 83 100 22 39 #NUM! #NUM!
Zone 3 (2 Hrs Sunlight/Day)
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
LA412PKGUL SINGLE GATE SOLAR CYCLES PER DAY DUAL-GATE SOLAR CYCLES PER DAY
Zone 3 (2 Hrs Sunlight/Day)
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Total System Current
Draw (mA)
10W Solar Panel
20W Solar Panel Note: (2) 10W 12V panels in parallel or
(1) 20W 12v panel
30W Solar Panel Note: 30W would be
(3) 10W 12V panels in parallel or (1) 10W & (1) 20W 12V panel in parallel
Control Board Feature Current Draw (mA)
Main board with no radios learned 4.2
One or more LiftMaster® remote controls learned +1.5
MyQ® device or wireless dual-gate learned +3.9
Expansion board +18.5
Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) +6.6
Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of
(8) Monitored LiftMaster Edges, (1) receiver per gate operator.)
Current consumption by control board feature 12V (LA412PKGUL) Add up current draw by feature and accessory to determine total current draw.
+11
Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA)
* When installing LMRRUL/LMTBUL heater option refer to install manual for cycles and standby time.
7Ah battery Two 7Ah batteries
33Ah battery 7Ah battery
Two 7Ah batteries
33Ah battery 7Ah battery
Two 7Ah batteries
33Ah battery
6 33 36 38 19 22 23 8 9 9 25 27 31 33 15 17 18 4 5 5 30 26 29 31 13 15 17 3 4 4
50 21 24 26 9 11 12 #NUM! 0 1
100 9 11 13 #NUM! 1 1 #NUM! #NUM! #NUM!
6 50 50 50 37 47 50 15 19 22 25 50 50 50 32 41 47 11 15 17 30 50 50 50 30 40 45 9 13 16
100 33 48 50 12 20 25 #NUM! #NUM! 1
200 8 20 27 #NUM! #NUM! 2 #NUM! #NUM! #NUM!
6 50 50 50 46 50 50 19 29 35 25 50 50 50 40 50 50 14 24 30 30 50 50 50 39 50 50 13 23 28
100 47 50 50 20 41 50 #NUM! 6 10
200 19 50 50 #NUM! 14 24 #NUM! #NUM! #NUM!
RSL12UL GATE SOLAR CYCLES PER DAY
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Zone 3 (2 Hrs Sunlight/Day)
Total System Current Draw
(mA)
10W Solar Panel
20W Solar Panel Note: (2) 10W 12V panels or (1) 20W panel in parallel
30W Solar Panel Note: 30W would be (3)
10W 12V panels in parallel or (1) 10W & (1) 20W 12V panel in parallel
7Ah battery Two 7Ah batteries
33Ah battery 7Ah battery
Two 7Ah batteries
33Ah battery 7Ah battery
Two 7Ah batteries
33Ah battery
6 41 46 48 24 27 29 10 11 11 25 34 39 41 18 21 22 5 6 6 30 33 37 39 17 19 21 4 5 5
50 26 30 32 11 13 15 #NUM! 0 1
100 11 14 16 #NUM! 1 2 #NUM! #NUM! #NUM!
6 50 50 50 47 50 50 19 24 27 25 50 50 50 40 50 50 13 18 21 30 50 50 50 38 50 50 12 17 20
100 42 50 50 15 26 32 #NUM! #NUM! 1
200 10 25 34 #NUM! #NUM! 2 #NUM! #NUM! #NUM!
6 50 50 50 50 50 50 24 37 44 25 50 50 50 50 50 50 18 30 37 30 50 50 50 49 50 50 16 28 35
100 50 50 50 25 50 50 #NUM! 7 13
200 24 50 50 #NUM! 17 30 #NUM! #NUM! #NUM!
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Zone 3 (2 Hrs Sunlight/Day)
10W Solar Panel
Total System Current Draw
(mA)
RSW12UL GATE SOLAR CYCLES PER DAY
20W Solar Panel Note: (2) 10W 12V panels or (1) 20W panel in parallel
30W Solar Panel Note: 30W would be (3)
10W 12V panels in parallel or (1) 10W & (1) 20W 12V panel in parallel
Control Board Feature Current Draw (mA)
Main board with no radios learned 4.2
One or more LiftMaster® remote controls learned +1.5
MyQ® device or wireless dual-gate learned +3.9
Expansion board +18.5
Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) +6.6
Current consumption by control board feature 12V (RSW12UL, RSL12UL) and accessory to determine total current draw.
Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of
(8) Monitored LiftMaster Edges, (1) receiver per gate operator.)
+11
Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA)
RSW12UL / RSL12UL
CSW24UL / CSL24UL
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
5 19 20 11 12 4 5 15 16 17 8 9 2 2 20 14 16 7 8 1 1
40 9 10 2 3 #NUM! #NUM!
60 4 5 #NUM! #NUM! #NUM! #NUM!
5 41 48 25 29 10 12 15 38 45 21 26 7 9 20 36 43 20 24 6 8
50 26 32 11 15 #NUM! 1
100 11 16 #NUM! 2 #NUM! #NUM!
5 78 110 47 66 19 28 15 74 106 43 63 16 24 20 72 104 41 61 15 23
100 42 71 15 32 #NUM! 1
200 10 34 #NUM! 2 #NUM! #NUM!
5 97 173 58 105 24 44 15 92 169 54 101 21 41 20 90 166 53 99 19 39
100 59 131 25 67 #NUM! 13
250 9 68 #NUM! 14 #NUM! #NUM!
CSW24UL GATE SOLAR CYCLES PER DAY
Zone 1
(6 Hrs Sunlight/Day) Zone 2
(4 Hrs Sunlight/Day) Zone 3
(2 Hrs Sunlight/Day)
Total System Current
Draw (mA)
10W* Solar Panel Note: Must use 24V Solar Panel
20W Solar Panel Note: 20W would be (2) 10W 12V panels or (1) 20W 12V panel in series
40W Solar Panel Note: 40W would be (4) 10W 12V or (2) 20W 12V panels in series
60W Solar Panel Note: (6) 10W 12V or (2)
20W & (2) 10W 12V panels in series
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
5 26 28 15 17 6 6 15 22 24 12 13 3 3 20 20 22 10 11 1 2
40 12 14 3 4 #NUM! #NUM!
60 5 7 #NUM! #NUM! #NUM! #NUM!
5 57 67 34 40 14 16 15 52 62 30 36 10 12 20 50 60 28 33 8 11
50 36 45 15 20 #NUM! 1
100 15 23 #NUM! 3 #NUM! #NUM!
5 108 152 65 92 27 38 15 103 147 60 87 23 34 20 100 144 58 84 21 32
100 58 99 21 44 #NUM! 1
200 14 47 #NUM! 3 #NUM! #NUM!
5 134 240 81 146 34 61 15 128 234 76 140 29 56 20 125 231 73 137 27 54
100 82 181 34 92 #NUM! 18
250 12 95 #NUM! 20 #NUM! #NUM!
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Zone 3 (2 Hrs Sunlight/Day)
Total System Current
Draw (mA)
CSL24UL GATE SOLAR CYCLES PER DAY
10W* Solar Panel Note: Must use 24V Solar Panel
20W Solar Panel Note: 20W would be (2) 10W 12V panels or (1) 20W 12V panel in series
40W Solar Panel Note: 40W would be (4) 10W 12V or (2) 20W 12V panels in series
60W Solar Panel Note: (6) 10W 12V or (2)
20W & (2) 10W 12V panels in series
Control Board Feature Current Draw (mA)
Main board with no radios learned 2.7
One or more LiftMaster® remote controls learned +1
MyQ® device or wireless dual-gate learned +2.4
Expansion board +11.1
Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) +3.8
Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.)
+5.8
Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA)
Current consumption by control board feature 24V (CSW24UL, CSL24UL) total current draw.
HDSL24UL/HDSW24UL
Control Board Feature Current Draw (mA)
Main board with no radios learned 4.2
One or more LiftMaster® remote controls learned +1.5 myQ® device or wireless dual-gate learned +3.9
Expansion board +8.7
Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) +3.8
Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.)
+5.8
Note: If the additional features on the expansion board and/or auxiliary relay board are not used, they may be unplugged to conserve additional power draw.
Current consumption by control board feature 24V (HDSL24UL, HDSW24UL) current draw.
Auxiliary relay board +11
7Ah Batteries
33Ah Batteries
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)Battery current draw (mA)
HDSW24UL GATE SOLAR CYCLES PER DAY
20W Solar Panel
40W Solar Panel
60W Solar Panel
Zone 3 (2 Hrs Sunlight/Day)
7Ah Batteries
33Ah Batteries
7Ah Batteries
33Ah Batteries
7Ah Batteries
33Ah Batteries
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)Battery current draw (mA)
HDSL24UL GATE SOLAR CYCLES PER DAY
20W Solar Panel
40W Solar Panel
60W Solar Panel
Zone 3 (2 Hrs Sunlight/Day)
7Ah Batteries
33Ah Batteries
7Ah Batteries
33Ah Batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
5 20 23 12 14 15 18 22 10 12 20 18 21 12 50 13 16 5 38 53 23 32 15 36 51 21 30 20 35 50 20 29 100 20 34 200 17 5 47 84 28 51 15 45 82 26 49 20 44 81 26 48 100 29 63 12 32 250 33
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Zone 3 (2 Hrs Sunlight/Day)
Battery Current
Draw (mA)
20W Solar Panel
40W Solar Panel
60W Solar Panel
INSL24UL Solar Gate Cycles Per Day - 1,000 lb. gate 20 ft. travel
INSL24UL/IHS24UL
Note:
Current consumption by control board feature 24V (IHSL24UL, INSL24UL) current draw.
NOTE: The use of photoelectric sensor heaters (models LMRRUL and LMTBUL) is NOT recommended in solar applications.
System Voltage 24V
Control board with no radios programmed 2.7mA
One or more LiftMaster® remote controls programmed +1 mA myQ® device or wireless dual gate programmed +2.4 mA
Expansion board +11.1 mA
Relay adapter board +11.1 mA
Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) +3.8 mA
Typical System Standby Battery Current Consumption (mA)
Add up current draw by feature and accessory to determine total current draw
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
7Ah batteries
33Ah batteries
5 20 11 15 18 10 20 18 50 13 5 18 25 11 15 15 17 24 14 20 16 23 14 100 16 5 22 39 28 24 15 21 38 26 23 20 20 38 26 22 100 13 30 12 15 250 15
Zone 1 (6 Hrs Sunlight/Day)
Zone 2 (4 Hrs Sunlight/Day)
Zone 3 (2 Hrs Sunlight/Day)
Battery Current
Draw (mA)
20W Solar Panel
40W Solar Panel
60W Solar Panel
IHSL24UL Solar Gate Cycles Per Day - 3,000 lb. gate 20 ft. travel
HCTDCUL
Add up current draw by feature and accessory to determine total battery current draw.
CONTROL BOARD FEATURE CURRENT DRAW (mA)
Main board with no radios learned 2.7
One or more LiftMaster® remote controls learned +1
MyQ® device or wireless dual-gate learned +2.4
Expansion board +11.1
Per loop detector LOOPDETLM (up to 3 loop detectors can +3.8 be plugged in to the expansion board)
HCTDCUL SOLAR CYCLES PER DAY
BATTERY
CURRENT DRAW
(mA)
ZONE 1
(6 HRS SUNLIGHT/DAY)
ZONE 2
(4 HRS SUNLIGHT/DAY)
ZONE 3
(2 HRS SUNLIGHT/DAY)
7 AH BATTERIES 7 AH BATTERIES 7 AH BATTERIES
10W* Solar Panel NOte: Must Use 24V
Solar Panel
20W Solar Panel Note: 20W would be (2) 10W
12V panels in series or
(1) 20W 12V Panel
40W Solar Panel Note: (4) 10W 12V or (2) 20W panels in series
60W Solar Panel Note: (6) 10W 12V or
(2) 20W 12V & (2) 10W 12V Panels in series
LiftMaster Solar Gate Operators are engineered to have low idle current draw including radio receiver to maximize battery life and solar performance. It is important to note, the following
· Cold temperature (below 32°F (0°C))
· Snow cover on solar panel
· Reduced hours of sunlight in winter months
In geographic areas that experience cold temperatures below 32°F (0°C) for more than two weeks in addition to any of the factors listed above, the following steps can be taken to ensure best performance:
· Replace the standard 7Ah batteries with 33Ah batteries. (For linear actuators, use the optional XL control box model XLSOLARCONTUL)
· In states adjacent to Canada and Canadian provinces, increase the angle of the solar panels by an additional 15 degrees (60 degrees total). This will optimize the solar panels for the winter months and reduce the buildup of snow and ice on the panels.
Important note: Daily cycle rate and standby time will be reduced by at least 50% when temperatures reach extreme cold temperatures below -4°F (or -20°C) for periods of more than two weeks.
For best performance during the winter months, snow and ice should be removed from the solar panel, moving parts on the gate and gate operator. In addition all snow should be removed from the path of the gate to prevent nuisance reversals.
If heavy amounts of snow are expected over several days, the manual disconnect may be engaged and the gate left open to allow access and snow removal. Once the snow is removed, simply reengage the manual disconnect to resume normal operation.
Optional Power Supply for Cold Weather Applications
Gate Operator Optional Power Supply LA500PKGUL, LA412PKGUL, LA400PKGUL XLSOLARCONTUL (2) 33Ah batteries not included)
CSW24UL, CSL24UL, HDSL24UL
HDSW24UL, IHSL24UL, INSL24UL
RSW12UL, RSL12UL (1) 33Ah batteries recommended in lieu of standard 7Ah batteries
(2) 33Ah batteries recommended in lieu of standard 7Ah batteries
Wiring
20W APPLICATION
(IN SERIES)
40W APPLICATION
(IN SERIES)
60W APPLICATION
(IN SERIES)
(To Battery(ies) (To Battery(ies) (To Battery(ies) (To Battery(ies) (To Battery(ies)
10W 10W 10W 10W
10W 10W
10W 10W
10W 10W
10W 10W
20W 20W 20W 20W
10W 10W
10W APPLICATION
(IN PARALLEL)
20W APPLICATION
(IN PARALLEL)
30W APPLICATION
(IN PARALLEL)
10W 10W 10W
10W 10W 10W
10W20W 20W
(To Battery(ies) (To Battery(ies) (To Battery(ies) (To Battery(ies) (To Battery(ies)
Models: LA412CONTU, LA412VDC, RSL12VDC, RSL12U, RSW12VDC, RSW12U
Models: LA400CONTU, LA400VDC, LA500CONTU, LA500VDC, LA500, CSL24VDC, CSL24U, CSW24VDC, CSW24U, HDSL24UL, HDSW24UL, IHSL24UL, INSL24UL (for models CSL24V and CSW24V refer to the wiring instructions provided with the Solar Harness Kit [Model K94-36596]).
Wire the solar panels - 12V Applications
Wire the solar panels - 24V Applications
Note: refer to installation manual for proper wiring to control board.
© 2022 The Chamberlain Group LLC. All Rights Reserved. myQ®, the myQ® logo, LiftMaster, the LiftMaster logo, are registered trademarks of the Chamberlain Group LLC.
LiftMaster.com
LMGTENCTSLGD 4/22
File details come from the government source that posted it. Updated .