This document is a Request for Qualifications (RFQ) issued by the Texas Health and Human Services Commission (HHSC) Procurement and Contracting Services (PCS) division on behalf of the Maintenance and Construction Department of the Health and Specialty Care System (HSCS) division. The RFQ solicits qualifications from Construction Manager-at-Risk (CMR) firms interested in providing consultation, construction, and administrative services for Project 24-202-WFH - a 200-bed replacement hospital at the North Texas State Hospital in Wichita Falls, Texas. The project includes 24 maximum security beds, 136 forensic adult beds, 24 adolescent beds, and 16 civil adult beds across approximately 350,000 square feet of program space. Respondents must attend one of two mandatory pre-submittal webinars and site visits scheduled for January 3-4, 2024. Submittals are due by January 22, 2024, and a shortlist of up to five firms will be notified on February 16, 2024. The shortlisted firms will then submit detailed proposals by February 23, 2024, with interviews tentatively scheduled for March 8, 2024. HHSC anticipates awarding a contract by April 5, 2024.
The "Cost of Work" for the project is estimated at $300,000,000, which does not include any pre-construction management fees, construction management fees, or construction general conditions. Respondents must submit a Historically Underutilized Business Subcontracting Plan as part of their submittal. HHSC will evaluate submittals based on criteria such as experience, relevant personnel experience, quality and safety programs, and proposed methodology and budget/schedule compliance. The contract term will extend through the completion of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_File_344256_HHS0013673 Attachments.zip | ZIP file | |
| ESBD_File_344256_HHS0013673 Addendum 01.zip | ZIP file | |
| ESBD_File_344256_HHS0013673 Exhibits Addendum 01 Revision.zip | ZIP file | |
| ESBD_File_344256_HHS0013673 Addendum 02.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 1 of 47 Version 1.1 (11/15/2023)
Cecile E. Young, Executive Commissioner
Request for Qualifications (RFQ)
Construction Manager-at-Risk (CMR) Two Step Process for
Project 24-202-WFH, 2-Step CMR for New Hospital, North Texas State Hospital, Wichita Falls, TX
RFQ HHS0013673
Addendum 02 Revision
Date of Release: December 15, 2023
See Section 3.1 for Schedule of Events
NIGP Class/Item Codes
909-00 Building Construction Services, New, Including Maintenance and Repair Services 909-28 Building Construction, Medical 909-76 Site Work Construction 909-77 Special Construction: Observatory, Security, Special Rooms, etc.
958-26 Construction Management Services 961-21 Cost Estimating
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 2 of 47
Table of Contents Article 1. Introduction and Definitions
1.1 Introduction
1.2 Definitions
1.3 Authority
Article 2. Scope of Work
2.1 Historical Background
2.2 Project Description and Cost of Work
2.2.1 Project Description
2.2.2 Phase One
2.2.3 Phase Two
2.2.4 Cost of Work
2.3 Project Assumptions
2.3.1 Americans with Disabilities Act
2.3.2 Building Codes
2.3.3 CMR Services
2.4 Contract Award and Term
2.4.1 Contract Award and Reservation of Rights
2.4.2 Contract Term
2.5 Unforeseen Conditions
2.6 No Guarantee of Volume, Usage, or Compensation
Article 3. Administrative Information
3.1 Schedule of Events
3.2 Ambiguity, Conflict, or Discrepancy
3.3 Inquiries
3.3.1 Sole Point of Contact
3.3.2 Exceptions to Sole Point of Contact
3.3.3 Prohibited Communication
3.3.4 Solicitation Questions
3.4 Pre-submittal Conferences and Site Visits
3.4.1 Attendance
3.4.2 Pre-submittal Conference Webinar Logistical Information
3.4.3 Facility Site Visit and Walk Through Logistical Information
3.4.4 Questions During Pre-submittal Conference and Site Visit
3.5 Step One Submittal Composition
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 3 of 47
3.5.1 General Information
3.5.2 Supporting Documentation
3.5.3 Discrepancies
3.5.4 Exceptions
3.5.5 Assumptions
3.5.6 Binding Offer
3.6 Step One Submittal Submission and Delivery
3.6.1 Deadline
3.6.2 Delivery – General Instructions
3.6.3 Submittal – Component Parts
3.6.4 Submission Options
3.6.5 Modifications and Withdrawals of Submittal
3.6.6 Retention of Solicitation Responses
3.7 Informalities
3.7.1 Formatting and Page Size
Article 4. Historically Underutilized Business Participation
4.1 HUB Subcontracting Plan
Article 5. Solicitation Response Evaluation and Award Process
5.1 Conformance with State Law
5.2 Selection Methodology
5.2.1 Minimum Qualifications (Pass or Fail)
5.2.2 Initial Compliance Screening
5.2.3 Written Submittal Evaluation (Part of Step One – Qualifications (70% Criteria Weight))
5.2.4 Written Submittal Evaluation Criteria (Part of Step One – Qualifications (70% Criteria Weight))
5.2.5 Advancement Criteria
5.2.6 Short List and CMR Proposal Evaluation Criteria (Part of Step Two – Proposed Cost (30% Criteria Weight))
5.2.7 Step Two Interviews
5.2.8 Final Score
5.2.9 Additional Selection Consideration
5.2.10 Summary of Best Value Determination and Final Award
5.3 Questions or Requests for Clarification
Article 6. Statement of Qualifications and Required Respondent Information
6.1 General Requirements
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 4 of 47
6.2 Executive Summary
6.3 Minimum Qualification Documentation
6.4 CMR Company Information
6.4.1 Table of Contents and Company Information
6.4.2 Company Profile
6.4.3 Ability to Provide Relevant CMR Construction Services and Proposed Team’s Relevant Experience (Experience and Relevant Experience of Key Personnel 35% Total Criteria Weight)
6.4.4 Quality and Safety Program (10% Criteria Weight)
6.4.5 Financial Solvency and Capitalization (Pass/Fail Minimum Qualification)
6.4.6 Proposed Methodology and Budget/Schedule Compliance (25% Criteria Weight)38
6.4.7 Information and Disclosures
6.4.8 Attachments to Respondent’s Submittal
6.4.9 Insurance Statement by Respondent
Article 7. CMR Proposed Cost
7.1 Step Two Proposal Package
7.2 Proposed Cost Components
7.2.1. Pre-Construction Management Not-to-Exceed Fee
7.2.2. Construction Management Fee
7.2.3. Not-to-Exceed Fee for Construction General Conditions
7.3 List of Exhibits for Respondent to Include with its Proposal
Article 8. General Conditions
8.1 Changes Modifications, and Cancellation of the Solicitation
8.2 Offer Period
8.3 Cost Incurred
8.4 Contract Responsibility
8.5 Acceptance of Evaluation Methodology
8.6 Public Information Act
8.7 Respondent Waiver – Intellectual Property
8.8 Standards of Conduct for Vendors
8.9 Disclosure of Interested Parties
8.10 Protest
Article 9. Submittal Checklist
9.1 Original Submittal Package
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 5 of 47
List of Exhibits and Attachments
Exhibit A, HHS Affirmations and Solicitation Acceptance for State Architectural/Engineering and Construction Projects, v. 2.0 (August 2023)
Exhibit B, Draft Construction Manager-at-Risk Contract including:
Attachment A, Contract Affirmations for State Architectural/Engineering and Construction Projects, v. 1.7 (Nov. 2023) Attachment B, Draft Facility Space Program Attachment C, Facility Specific Policies and Procedures Attachment D, Prevailing Wage Rates
Attachment E, CMR’s Historically Underutilized Business Subcontracting Plan
Attachment F, CMR’s Personnel and Monthly Salary Rates Attachment G, Additional Services Proposal for Pre-Construction Attachment H, Texas Uniform General Conditions for Construction Contracts with HHSC Supplementary General Conditions, Version 2.2 Attachment I, HHSC Project Special Conditions Attachment J, HHS Uniform Terms and Conditions - Vendor, v. 3.4 (Nov. 2023) Attachment K, Allowable General Conditions Line Items Attachment L, Guaranteed Maximum Price Proposal with Exhibits Attachment M, CMR’s Proposal
Exhibit C, Exceptions and Assumptions Form
Exhibit D, Respondent’s Information, Disclosures, and Financial Form
Exhibit E, Historically Underutilized Business (HUB) Subcontracting Plan (HSP) Requirements (rev. April 2023)
Exhibit F, Evaluation Tool
Exhibit G, Preliminary Proposed Schedule
Exhibit H, Execution of Proposal and Bonds
Exhibit I, Schedule and Budget Compliance
Exhibit J, CMR Proposal Form
Exhibit K, Preliminary Site Planning Exhibit
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 6 of 47
ARTICLE 1. INTRODUCTION AND DEFINITIONS
1.1 INTRODUCTION
The Texas Health and Human Services Commission (HHSC) is an agency within the Texas Health and Human Services (HHS) system. The Procurement and Contracting Services (PCS) division of HHSC administers solicitations for HHS.
PCS, on behalf of the Maintenance and Construction Department of the Health and Specialty Care System (HSCS) division, issues this Request for Qualifications (RFQ) to solicit qualifications from a Construction Manager-at-Risk (CMR) interested in providing consultation, construction and administrative services during the planning and design, pre-construction and construction, furniture, furnishing and equipment (FFE) procurement and installation, closeout and warranty phase services for Project 24-202- WFH - 200-Bed Replacement Hospital at North Texas State Hospital in Wichita Falls, Texas.
The Project will include a 200-bed replacement hospital for the North Texas State Hospital located in Wichita Falls, Texas, including 24 Maximum Security Beds, 136 forensic adult beds, 24 adolescent beds, 16 civil adult beds, an administration area, related support services, possible selected demolition, and related utility infrastructure and landscaping.
Selection of the CMR will be made using a two-step process pursuant to Texas Government Code Section 2269.254 and as set out in this RFQ.
Responses to this RFQ must be received in the format specified in this RFQ no later than the deadline for submission of Solicitation Response as set forth in Section 3.1 of this
RFQ.
1.2 DEFINITIONS
As used in this Solicitation, unless a different definition is specified or the context clearly indicates otherwise, the following terms have the meanings assigned below. Refer to Exhibit B, Draft Construction Manager-at-Risk Contract and attachments to Exhibit B for additional definitions (e.g., Change Order, Contract, Contract Documents, Contractor, Deliverable, Effective Date, Guaranteed Maximum Price or GMP, HUB, Project, Services, and Work).
Addendum means a written clarification or revision to this Solicitation posted on the
ESBD.
Advancement Criteria means the published criteria for Respondent to advance to the next phase of evaluation if multiple evaluation methods are utilized.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 7 of 47
BIM or Building Information Modeling means the computable, digital, multi-dimensional representation of the physical and functional characteristics of the Project’s facilities and their related life-cycle information in Autodesk Revit format and Autodesk Civil 3D, to be used as a repository of design and construction information for use by the Project Team during the design, bidding, Preconstruction, and construction phases of the Project.
Competitive Range has the same meaning as the definition under Title 1 of the Texas Administrative Code Part 15, Chapter 391, Subchapter A, Rule §391.107(3).
Construction Administration means the oversight and execution of a construction Contract during the preconstruction and construction phases of a Project.
Contract Term means the period of time beginning with the commencement date or Effective Date of a Contract and ending when the Contract expires in accordance with its terms, or when it has been terminated.
Cost of the Work or Cost of Work means the amount Respondent should consider as the basis for the construction budget, or Guaranteed Maximum Price (GMP), not including any pre-construction management fees, construction management fees, and construction general conditions.
ESBD means the Electronic State Business Daily, an online directory where State of Texas solicitations over $25,000 are posted. The ESBD may currently be accessed at http://www.txsmartbuy.com/esbd.
Facility Space Program means the list of the types and number of building spaces and their relationships that are required to define the Project and to determine the size and configuration of the building.
FFE means furniture, furnishings, and equipment.
Final Score means the final scoring of the Solicitation Response including any secondary evaluation process and scoring as documented in this RFQ.
Final Written Response Score means the final scoring of the written response as documented in the Solicitation.
Guaranteed Maximum Price or GMP Construction Documents means the amount proposed by CMR and accepted by Owner as the maximum cost to Owner for construction of the Work in accordance with the Contract Documents, subject to (i) any Change Orders, or amendments to the GMP. The GMP does not include the pre-construction phase fee.
HHSC means the Texas Health and Human Services Commission. As defined below, the Texas Health and Human Services Commission also may be referred to as Owner.
https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=1&pt=15&ch=391&rl=107 https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=1&pt=15&ch=391&rl=107 http://www.txsmartbuy.com/esbd
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 8 of 47
HHSC PCS means the Procurement and Contracting Services division of HHSC.
HUB Subcontracting Plan or HSP means the written documentation regarding the use of subcontractors that is required by Section 2161.252 of the Texas Government Code for a purchase with an expected value of $100,000 or more when the state agency has determined subcontracting opportunities are probable. The HSP subsequently becomes a provision of the Contract and Contractor’s compliance with the HSP will be monitored during the Contract Term.
Interview means the secondary evaluation process during the step-two evaluation phase for the purpose of further distinguishing between the Solicitation Responses through verbal questioning of the Respondents aimed at clarifying their written response.
Lead Architect means individual responsible for leading the design of the Project.
Maximum Security Bed means a bed appropriate for a facility unit designated to treat adults who are determined to be manifestly dangerous in accordance with TAC, Title 25, Part 1, Chapter 415, Subchapter G, Rule §415.303 and persons who have been committed pursuant to the Texas Code of Criminal Procedure Chapters 46B or 46C.
Owner means the Texas Health and Human Services Commission or HHSC.
Project Controls means the processes and work activities (e.g., scheduling, planning, cost control, coordination, etc.) performed in the course of construction management of the Project.
Project Manager means the principal employee or agent having administrative authority of the Project as described in the Respondent’s Solicitation Response and as may be changed pursuant to this RFQ.
Proposal means the Solicitation Response by the Short List during step two of the Solicitation as set out in Article 7.
Respondent means the individual or entity responding to this Solicitation.
Short List means the top five, or fewer, Respondents selected solely on the basis of qualifications during step one, that are invited to provide additional information, including the construction manager-at-risk's proposed fee and prices for fulfilling the general conditions (Exhibit J, CMR Proposal Form).
Solicitation or RFQ means this Request for Qualifications including any exhibits, and Addenda.
Solicitation Response means a response to this RFQ.
https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=25&pt=1&ch=415&rl=303 https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=25&pt=1&ch=415&rl=303 https://statutes.capitol.texas.gov/Docs/CR/htm/CR.46B.htm https://statutes.capitol.texas.gov/Docs/CR/htm/CR.46C.htm
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 9 of 47
State means the State of Texas and its instrumentalities, including HHSC, as well as any other state agency, its officers, employees, or authorized agents.
Statement of Qualifications or SOQ means the portion of the Submittal that comprises a Respondent’s qualifications and skills as set out in Article 6 of the Solicitation.
Submittal means the Solicitation Response for step one of the Solicitation as set out in Article 6.
Superintendent means the individual who maintains a full-time onsite presence at the Project site and is responsible for field supervision, coordination, and completion of the Work.
Unforeseen Conditions means unanticipated or unexpected circumstances or situations that affect the final price and/or completion time of a Contract or Project.
VPTS means the Vendor Performance Tracking System maintained by the Texas Comptroller of Public Accounts. The VPTS may be currently accessed at https://comptroller.texas.gov/purchasing/programs/vendor-performance-tracking/.
Written Response Score means the scoring of the written response as documented in the Solicitation in Article 5.
1.3 AUTHORITY
HHSC is soliciting CMR services under Texas Government Code Section 2155.144(b-2) and Chapter 2269, Subchapter F, Construction Manager-at-Risk Method using a two-step process pursuant to Section 2269.253.
ARTICLE 2. SCOPE OF WORK
2.1 HISTORICAL BACKGROUND
The state hospital system serving patients with mental illness is strained by aging campuses that have severe infrastructure concerns and building designs that are outdated for modern psychiatric care practices. The Texas Legislature has invested more than $2.5 billion for replacement and renovation of the hospitals across the state at Wichita Falls, Terrell, Austin, San Antonio, Rusk, Kerrville, and construction of new hospitals in Houston, Dallas, Lubbock, and Amarillo. These projects are a part of HHSC’s transformation of inpatient psychiatric care in Texas. They are founded on three bedrock principles: systems-based continuum of care, unparalleled treatment, and easy access.
North Texas State Hospital at Wichita Falls Campus is an inpatient hospital that has been providing comprehensive psychiatric treatment and care for the citizens of Texas since https://comptroller.texas.gov/purchasing/programs/vendor-performance-tracking/ https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2155.htm https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2269.htm
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 10 of 47
1917. This hospital is one of the nine state mental health hospitals owned and operated under the supervision of HHSC and is providing treatment to civil, forensic, and adolescent populations.
2.2 PROJECT DESCRIPTION AND COST OF WORK
2.2.1 Project Description
The Project includes the design and construction of a 200-bed replacement hospital at North Texas State Hospital at Wichita Falls Campus that includes 24 Maximum Security Beds, 136 forensic beds, 24 adolescent beds, and 16 civil adult beds.
The proposed building(s) will incorporate approximately 350,000 square feet of program space, and a variety of other outdoor space, creating an environment that promotes wellness and rehabilitation for the patients. The program space will include patient rooms (semi-private and private); shared and specialized support space for patients;
administration space; diagnostic and treatment space; etc. The program space will also include the support programs’ areas that are necessary to support the operations of the hospital like food services, laundry, supply services, and other programs. The design and construction of each building should provide optimized care and treatment opportunities, focusing on privacy; minimizing the sense of confinement, noise, and crowding; ample natural light and access to nature; and increased communication and visibility.
The scope of the Project may also encompass demolition of major components of surrounding buildings and utilities as needed to implement the design, including replacement, restoration, or renovation, hazardous materials abatement planning, and consulting services. The Project might include archaeological surveys and will involve working with the Texas Historical Commission.
A mandatory requirement of the Project is the assessment of existing campus utilities;
mechanical, electrical, and plumbing systems; and capacities for implementation of the design to extend the useful life of the new building(s) for more than 50 years. Site improvements to existing campus drives, parking, ramps, sidewalks, landscaping, landscape irrigation and campus utilities shall be implemented, as necessary, to accomplish the intended goals of the Project.
It is expected that the design team will fulfill the mandatory requirements, but the Contractor will be required to review and confirm the assessments.
The Project schedule is very critical for the timely delivery and completion of the Project.
To meet the Project timeline, HHSC is planning to have GMP at the end of the design development package or 50% Construction Documents package. Early packages might need to be issued for an early start. The phasing and early packages and the timeline associated will be finalized once the A/E team and CMR team are on board.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 11 of 47
CMR will provide appropriate services to ensure the proper flow of information is provided to enable appropriate input into and output from the BIM, including, but not limited to, importing information into the BIM, providing updated information on changes to the Project plans and specifications during construction, assisting on conflict resolution, coordinating the sharing of information, facilitating file exchange, and other deliverables as needed.
2.2.2 Phase One
Collaborate with HHSC and its A/E, during the drafting and completion of the Construction Documents including review and comments at each negotiated milestone prior to completion of Construction Documents. The Contractor’s expertise will be used to affect value engineering, establish a Project schedule, and ultimately determine the GMP. The services include, but are not limited to, attendance at meetings, and consultation regarding plan reviews, constructability reviews, and cost estimating.
In addition, CMR will work closely with HHSC to collaborate with stakeholders, including state agencies, the Project controls group, Owner’s Engineer, A/Es, and Subcontractors during the development, completion, and implementation of Construction Documents.
CMR will work collaboratively to coordinate with Owner-provided Project controls group, construction and materials testing firm, test and balancing, and commissioning groups.
CMR services will be from pre-design through construction close-out, as described in Exhibit B, Draft Construction Manager-at-Risk Contract.
CMR services shall be comprehensive in nature and will include but not be limited to:
preconstruction services; estimation services, participating in constructability reviews;
managing complex critical path schedules and bidding multiple packages as necessary to execute the Project scope. The number of bid packages and GMP amendments will be determined by HHSC in cooperation with the A/E and CMR.
The CMR will be required to attend and participate in meetings with the A/E, HHSC, Owner’s other Subcontractors and agency stakeholders as well as coordination meetings with city departments as required. The Project will require presentations to different organizations and ongoing communication to the public and stakeholders.
The CMR will be tasked with developing the Project implementation plan in coordination with HHSC, the A/E consultant, and the Project control group.
2.2.3 Phase Two
In accordance with the approved schedule and GMP, Contractor shall facilitate bidding and selection of subcontractors in compliance with HUB requirements and provide and/or secure and install all materials, FFE, labor, coordination, management, and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications, and other Contract Documents that will be prepared by the A/E and HHSC.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 12 of 47
2.2.4 Cost of Work
Respondents should consider the “Cost of Work” to be $300,000,000.00. The Cost of Work should be considered as the basis for the construction budget, or Guaranteed Maximum Price (GMP), but it does not include any pre-construction management fees, construction management fees, and construction general conditions.
2.3 PROJECT ASSUMPTIONS
2.3.1 Americans with Disabilities Act
All new construction and any improvements shall comply with the latest Americans with Disabilities Act (ADA) Title II accessibility guidelines and will require review and approval from the Texas Department of Licensing and Regulation (TDLR).
2.3.2 Building Codes
All improvements and new construction shall comply with applicable building codes and inspection requirements.
2.3.3 CMR Services
The CMR has overall responsibility for and shall provide complete Pre-Construction Phase and Construction Phase Services for the Project, which shall include all Services and Deliverables identified and described in Exhibit B, Draft Construction Manager-at-Risk Contract. It is the responsibility of each Respondent to carefully review Exhibit B and all attachments thereto. Please note that the draft Contract is subject to change and is only a preliminary draft.
Services to be provided by the CMR shall include, but are not limited to: investigating site conditions, pre-construction estimating, constructability reviews, cost estimating, development of a GMP, advisory assistance in the development of final Construction Documents, bidding services, and construction of the Project Deliverables for both phases of the Project.
2.4 CONTRACT AWARD AND TERM
2.4.1 Contract Award and Reservation of Rights
As a result of this Solicitation, HHSC intends to award one Contract for Project 24-202- WFH – 200-Bed Replacement Hospital at North Texas State Hospital in Wichita Falls, Texas. Any award is contingent upon approval of the HHSC executive commissioner or their designee.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 13 of 47
If, for any reason, a Contract cannot be executed with a Respondent selected for award within 90 calendar days of HHSC’s determination to seek to contract with that Respondent, HHSC may avail itself of any option permissible under applicable law including, but not limited to, negotiate a Contract with the next highest scoring Respondent, make a partial award, or withdraw the Solicitation. See also, Article 5 (Solicitation Response Evaluation and Award Process).
The Respondent selected by HHSC for an award will be expected to negotiate in good faith with HHSC upon a final Construction Manager-at-Risk Contract, based upon the draft version attached hereto and incorporated by reference as Exhibit B, Draft Construction Manager-at-Risk Contract.
HHSC reserves the right to cancel, make partial award, or decline to award a Contract under this Solicitation at any time at its sole discretion.
2.4.2 Contract Term
The Contract will start on the Effective Date and will terminate upon completion of the Project as described in Article 12 of Attachment H, Texas Uniform General Conditions for Construction Contracts with HHSC Supplementary General Conditions, Version 2.2, of Exhibit B to the Solicitation.
Notwithstanding the limitation in the preceding paragraph and with at least 30 days advance written notice to Contractor, at the end of the initial term or any extension period, HHSC, at its sole option, may extend the Contract as necessary to ensure continuity of service, for purposes of transition, or as otherwise determined by HHSC to serve the best interest of the State for up to 12 months, in one-month intervals, at the then-current Contract rate or rates (if applicable) as modified during the Contract Term.
2.5 UNFORESEEN CONDITIONS
Unforeseen Conditions discovered during the Project that affect the negotiated Project cost or duration shall be addressed by HHSC in the form of an interim change authorization. Final costs and duration for remediation of the Unforeseen Conditions shall be negotiated and formalized by way of Amendment to the Contract.
2.6 NO GUARANTEE OF VOLUME, USAGE, OR COMPENSATION
HHSC makes no guarantee of volume, usage, or total compensation to be paid under the Contract. The Contract is subject to appropriations and the continuing availability of funds.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 14 of 47
ARTICLE 3. ADMINISTRATIVE INFORMATION
3.1 SCHEDULE OF EVENTS
EVENT DATE/TIME
Solicitation Posting Date on the ESBD See Date of Release on Page 1 of the Solicitation
Mandatory Pre-submittal Webinar #1 Wednesday, January 3, 2024 at 9:00 a.m. Central Time
Mandatory Site Visit #1 Wednesday, January 3, 2024 at 2:00 p.m. Central Time
Mandatory Pre-submittal Webinar #2 Thursday, January 4, 2024 at 9:00 a.m. Central Time
Mandatory Site Visit #2 Thursday, January 4, 2024 at 10:30 a.m. Central Time
Deadline for Courtesy HSP Review Thursday, January 4, 2024 at 12:00 p.m. Central Time
Deadline for Submitting Respondent Questions Monday, January 8, 2024 at 12:00 p.m. Central Time
Tentative Date Responses to Questions Posted on the ESBD
Tuesday, January 9, 2024
Deadline for Submission of Step One Submittal and HSP.
NOTE: Responses must be RECEIVED by HHSC by the deadline.
Monday, January 22, 2024, by 10:30 a.m. Central Time
Public Opening for Step One
Webinar link is: Step One Opening Link. All Respondents’ company name also will be sent by email to each.
Friday, January 26, 2024 at 9:00 a.m. Central Time https://attendee.gotowebinar.com/register/6559452610557014365
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 15 of 47
Notification of Short List Selection Friday, February 16, 2024
Deadline for Submission of Step Two Proposal (for the five or fewer Respondents chosen from Step One)
Friday, February 23, 2024 by 10:30 a.m. Central Time
Public Opening for Step Two
Webinar link is: Step Two Opening Link All Respondents’ pricing information also will be sent by email to each.
Tuesday, February 27, 2024 at 9:00 a.m. Central Time
Notification of Interview Selection Thursday, February 29, 2024
Respondent Interviews Friday, March 8, 2024
Anticipated Notice of Intent to Award Monday, March 25, 2024
Anticipated Notice of Award Monday, April 5, 2024
Attendance at one of the pre-submittal conferences and site visits is mandatory.
All dates specified in the Schedule of Events are tentative and HHSC reserves the right to modify the dates or cancel the scheduled events at any time. Scheduling changes or cancellation determinations made by HHSC prior to the step one Submittal deadline will be posted as an Addendum on the ESBD. If, after the step one Submittal deadline, there are delays that significantly impact the anticipated award date, HHSC, at its sole discretion, may publish updates regarding the anticipated award date in the Procurement Forecast (https://apps.hhs.texas.gov/procurement-calendar/procurement-forecast.pdf) located on the HHS Procurement Opportunities webpage currently accessed at https://www.hhs.texas.gov/business/contracting-hhs/procurement-opportunities.
In accordance with Texas Administrative Code, Title 1, Part 15, Chapter 391, Subchapter C, Rule §391.305, HHSC will issue a Notice of Intent to Award in the Procurement Forecast located on the HHS Procurement Opportunities webpage under Future Opportunities, Intent to Award Notices & Delayed Procurements.
Each Respondent is responsible for periodically checking the ESBD and the HHSC Procurement Forecast for updates.
https://attendee.gotowebinar.com/register/1312577625251928408 https://apps.hhs.texas.gov/procurement-calendar/procurement-forecast.pdf https://apps.hhs.texas.gov/procurement-calendar/procurement-forecast.pdf https://apps.hhs.texas.gov/procurement-calendar/procurement-forecast.pdf https://www.hhs.texas.gov/business/contracting-hhs/procurement-opportunities https://texreg.sos.state.tx.us/public/readtac%24ext.TacPage?sl=R&app=9&p_dir&p_rloc&p_tloc&p_ploc&pg=1&p_tac&ti=1&pt=15&ch=391&rl=305 https://texreg.sos.state.tx.us/public/readtac%24ext.TacPage?sl=R&app=9&p_dir&p_rloc&p_tloc&p_ploc&pg=1&p_tac&ti=1&pt=15&ch=391&rl=305 https://apps.hhs.texas.gov/procurement-calendar/procurement-forecast.pdf https://apps.hhs.texas.gov/procurement-calendar/procurement-forecast.pdf https://apps.hhs.texas.gov/procurement-calendar/procurement-forecast.pdf
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 16 of 47
3.2 AMBIGUITY, CONFLICT, OR DISCREPANCY
Respondent must notify the individual specified in Section 3.3.1 (Sole Point of Contact) of any ambiguity, conflict, discrepancy, exclusionary specification, omission, or other error in the Solicitation in the manner and by the deadline described in Section 3.3.4 (Solicitation Questions).
Respondent submits a Solicitation Response at its own risk.
If Respondent fails to properly and timely notify the individual specified in Section 3.3.1 (Sole Point of Contact) of any ambiguity, conflict, discrepancy, exclusionary specification, omission, or other error in the Solicitation, Respondent, whether awarded a Contract or not:
a. Waives any claim of error or ambiguity in the Solicitation and any resulting Contract;
b. Must not contest the interpretation by HHSC of such provision(s); and
c. Is not entitled to additional compensation, relief, or time by reason of ambiguity, conflict, discrepancy, exclusionary specification, omission, or other error or its later correction.
3.3 INQUIRIES
3.3.1 Sole Point of Contact
All requests, questions, or other communication regarding this Solicitation shall be made in writing to HHSC PCS and addressed to the person identified below (Sole Point of Contact), except as permitted in Section 3.3.2 (Exceptions to Sole Point of Contact). If a telephone number is provided by the Sole Point of Contact, its use is limited to administerial matters such as instructing a potential Respondent on accessing an IT system or locating a website referenced in the Solicitation. Communications via telephone are not binding. Respondent shall rely only on written statements issued by or through HHSC PCS designated staff as provided by Section 3.3 (Inquiries).
Point of Contact for HHSC:
Name: Colin Gresham, CTCD, CTCM Title: Purchaser Address: 1100 West 49th Street, Mail Code 2020, Austin, TX 78756 Email Address: colin.gresham@hhs.texas.gov Phone: 512-406-2465 mailto:colin.gresham@hhs.texas.gov
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 17 of 47
3.3.2 Exceptions to Sole Point of Contact
Exceptions to Section 3.3.1 (Sole Point of Contact) are as follows:
a. A Respondent with a question relating to the HUB Subcontracting Plan is permitted to direct its written question(s) to the HUB coordinator via email at Bob.McCurdy@hhs.texas.gov.
b. The Sole Point of Contact may expressly direct another designated HHSC representative to speak to the Respondent, such as during Contract negotiations. It is the Respondent’s responsibility to ensure that communications with an individual other than the Sole Point of Contact have been authorized by the Sole Point of Contact before engaging in such communication. Failure to comply with this requirement may result in the disqualification of a Respondent’s Solicitation Response as provided in Section 3.3.3 (Prohibited Communication).
c. The Sole Point of Contact will authorize an alternate or backup Sole Point of Contact in the event of their extended absence from the office and, in such an event, the contact information for the secondary Sole Point of Contact will be in placed in an automatic reply out-of-office email message. A Respondent seeking to contact the Sole Point of Contact should do so via email in order to timely receive updated contact information.
3.3.3 Prohibited Communication
Except as provided in Section 3.3.1 (Sole Point of Contact) and Section 3.3.2 (Exceptions to Sole Point of Contact), a Respondent or potential Respondent is prohibited from communicating with HHSC regarding this Solicitation. HHSC, including its representative(s) and partners, will not answer any verbal or written questions or otherwise discuss the contents of this Solicitation with any Respondent, potential Respondent, or their associated representative(s). This restriction does not preclude discussions between affected parties for the purposes of conducting business unrelated to this Solicitation. Failure to comply with this restriction may result in disqualification of Respondent's Solicitation Response.
3.3.4 Solicitation Questions
Written questions regarding this Solicitation must be submitted by email to the individual specified in Section 3.3.1 (Sole Point of Contact) by the deadline specified in Section
3.1 (Schedule of Events). Responses to the Solicitation questions will not be emailed to the individual requestors. Responses to all Solicitation questions timely received will be posted on the ESBD by the deadline specified in Section 3.1 (Schedule of Events). If same or similar Solicitation questions are submitted, a single consolidated answer may be posted on the ESBD.
mailto:Bob.McCurdy@hhs.texas.gov
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 18 of 47
a. All questions regarding the Solicitation must include the following information:
1. Solicitation number;
2. Solicitation package reference (page number, section, and exhibit or attachment, if applicable;
3. Question topic (e.g., “Schedule of Events,” or “Exhibit A, HHS Affirmations and Solicitation Acceptance for State Architectural/Engineering and Construction Projects”); and
4. Question.
b. In addition, the following contact information must be provided by the requestor with its submission of the Solicitation question(s):
1. Business entity name;
2. Business entity representative name;
3. Phone number; and
4. Email address.
c. Solicitation questions received after the deadline specified in Section 3.1 (Schedule of Events) may not be answered. Prior to the Submittal deadline specified in Section 3.1 (Schedule of Events), HHSC PCS reserves the right to amend answers previously posted on the ESBD. Amended answers will be posted on the ESBD. It is the Respondent's responsibility to periodically check the
ESBD.
3.4 MANDATORY PRE-SUBMITTAL CONFERENCES AND SITE VISITS
3.4.1 Attendance
HHSC PCS will conduct pre-submittal conference webinars and site visits. Attendance is mandatory. Respondent’s failure to attend one of the pre-submittal conferences and site visits will result in the disqualification of its step one Submittal.
The webinar logs and sign in sheets received from attendees will be used by HHSC PCS to confirm the attendance of a Respondent submitting a step one Submittal.
3.4.2 Mandatory Pre-submittal Conference Webinar Logistical Information
HHSC PCS will hold the pre-submittal conferences by webinar on the date and time specified in Section 3.1 (Schedule of Events). People with disabilities who wish to attend the meeting and require auxiliary aids or services should contact the individual identified in Section 3.3.1 (Sole Point of Contact) at least seventy-two (72) hours before the pre-submittal conference in order to have reasonable accommodations made by
HHSC.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 19 of 47
a. Mandatory Pre-submittal Webinar no. 1:
Wednesday, January 3, 2024 at 9:00 a.m. Central Time
Please register for the webinar at: Pre-Submittal Webinar #1 Registration Link.
b. Mandatory Pre-submittal Webinar no. 2:
Thursday, January 4, 2024 at 9:00 a.m. Central Time
Please register for the webinar at: Pre-Submittal Webinar #2 Registration Link
After registering, you will receive a confirmation e-mail. containing information about joining the webinar.
3.4.3 Facility Site Visit and Walk Through Logistical Information
All Respondents are required to attend one Facility Site Visit as specified in Section 3.1 (Schedule of Events). Potential Respondents should be prepared to complete one of the scheduled tours; additional tours will not be offered.
a. Mandatory Site Visit no. 1:
Wednesday, January 3, 2024 at 2:00 p.m. Central Time
Pre-registration is requested to allow for space accommodations. Please register for the site visit at: Site Visit #1 Registration Link
Deadline for Pre-registration is: Tuesday, January 2, 2024 by 12:00 p.m. Central Time.
b. Mandatory Site Visit no. 2:
Thursday, January 4, 2024 at 10:30 a.m. Central Time
Pre-registration is requested to allow for space accommodations. Please register for the site visit at: Site Visit #2 Registration Link.
Deadline for Pre-registration is: Wednesday, January 3, 2024 by 12:00 p.m.
Central Time
c. Site Visit Location and Parking:
North Texas State Hospital - Wichita Falls Building 539, TAC Conference Room 6515 Kemp Blvd Wichita Falls, TX 76308 https://attendee.gotowebinar.com/register/3419122057899606873 https://attendee.gotowebinar.com/register/917816667593179482 https://forms.office.com/r/YRJvAcTJnU https://forms.office.com/Pages/ResponsePage.aspx?id=Mnf5m7mCm0mxaqk-jr1Ta44xhfzHTC5PszE4MckzHvZUNTFSQ1FZVjA1NlpNTDBBNDhENTRFRlYwUi4u
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 20 of 47
Enter the campus from Kemp Blvd. onto Texas Ave. Proceed to the guard shack and check in with security. Each contractor will need to show their driver’s license to the security staff when they stop and check-in. Security will issue each vehicle a parking pass and visitor pass for each occupant. You will be directed to TAC Conference Room, Bldg. 539. Proceed as directed. Parking is available in front of Building 539. Enter the building through the front door.
3.4.4 Questions During Pre-submittal Conference and Site Visit
a. Attendees may submit Solicitation questions in writing via email. All questions must be submitted in the prescribed format and include the information specified in Section 3.3.4 (Solicitation Questions).
b. Only written responses posted by HHSC PCS as an Addendum to the Solicitation on the ESBD will be considered an official response that is a binding amendment to the Solicitation.
c. Conversations with HHSC program area staff before or after the pre-submittal conference and jobsite walkthrough are prohibited pursuant to Section 3.3.3 (Prohibited Communication).
3.5 STEP ONE SUBMITTAL COMPOSITION
3.5.1 General Information
Respondent should focus on the instructions and requirements of the Solicitation.
Respondent should prepare a Submittal that clearly and concisely represents its qualifications and capabilities. Expensive bindings, colored displays, promotional materials, etc. are not necessary or desired. Failure of Respondent to submit all required information and documents within its Submittal in the required format(s) may result in disqualification of the Submittal without further consideration.
3.5.2 Supporting Documentation
A Statement of Qualifications may be submitted with supporting documentation if (i) complete and concise responses cannot be provided within the Statement of Qualifications without referencing the supporting documentation, (ii) the Statement of Qualifications clearly specifies the location (e.g., file, page, section, and/or paragraph) where the supporting information can be found, and (iii) such supporting documentation is submitted as part of the Submittal.
The Statement of Qualifications must be properly paginated, formatted as an 8 ½" x 11" page with 1-inch margins, and use a 12 point or larger font, except that a smaller font may be used for page headers and footers, footnotes, and illustrations such as tables, charts, diagrams, figures, graphs, and other visual aids. If a font smaller than 12 point is used, the text when printed on 8 ½" x 11" paper must not require magnification to be legible. Times New Roman font is preferred.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 21 of 47
The Statement of Qualifications must not include other documents embedded as electronic files within the text and must not include hypertext links. The Statement of Qualifications, including supporting documentation, submitted as an electronic file should be pre-formatted for printing on 8 ½" x 11" paper.
3.5.3 Discrepancies
In the event of any discrepancies or variations between copies, HHSC is under no obligation to resolve the inconsistencies and may make its scoring and selection decisions, accordingly, including the decision to potentially disqualify a Solicitation Response. If Respondent is required to designate an “Original” Solicitation Response but fails to do so, HHSC, in its sole discretion, will determine the version to be used as the original or may disqualify the Solicitation Response. If the Respondent submits a redacted Solicitation Response as the “Original,” HHSC will disqualify the Solicitation Response and it will not be evaluated. HHSC will not accept submissions after the submission deadlines specified in Section 3.1 (Schedule of Events) to remedy discrepancies or variations in Solicitation Response submissions.
3.5.4 Exceptions
A Respondent is highly encouraged, in lieu of including exceptions in its Solicitation Response, to address all issues that might be advanced by way of exception by submitting such issues as questions in accordance with Section 3.3.4 (Solicitation Questions).
A Solicitation Response that is not responsive to the Solicitation requirements may result in disqualification. If a Respondent includes any exception(s) in its Solicitation Response, Respondent must specifically and clearly identify each exception on the Exceptions and Assumptions Form, Exhibit C and provide all information requested on the form. Any exception that is not submitted on the form and in the format prescribed by the Exceptions and Assumptions Form, Exhibit C may be rejected without consideration.
No exception, nor any other term, condition, or provision in a Solicitation Response that differs, varies from, or contradicts this Solicitation will be considered to be part of the Contract unless expressly agreed by HHSC and made a part of the Contract in writing.
3.5.5 Assumptions
Respondent must identify on the Exceptions and Assumptions Form, Exhibit C any business, economic, legal, programmatic, or practical assumptions that underlie the Respondent’s Solicitation Response. HHSC reserves the right to accept or reject any or all assumptions. All assumptions not expressly identified and incorporated into any Contract resulting from this RFQ are deemed rejected by HHSC.
3.5.6 Binding Offer
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 22 of 47
A Solicitation Response constitutes a binding offer to contract based upon the terms, conditions, and specifications set forth in this Solicitation. By submitting a Solicitation Response, Respondent represents and warrants that any individual submitting the Solicitation Response and any related documents on behalf of the Respondent is authorized to do so and to bind the Respondent under any Contract that may result from this Solicitation.
A Solicitation Response must be responsive to the Solicitation as worded and without any expectation that any or all terms, conditions, or provisions of the Solicitation will be negotiated. A Solicitation Response may be disqualified as non-responsive to the Solicitation if it includes any disclaimer asserting a conditional offer (e.g., Respondent’s ability to contract is contingent on an exception or assumption provided in accordance with Section 3.5.4 (Exceptions) or Section 3.5.5 (Assumptions)) or other similar statement indicating that the Solicitation does not constitute a binding offer.
3.6 STEP ONE SUBMITTAL SUBMISSION AND DELIVERY
3.6.1 Deadline
Respondent is solely responsible for ensuring timely delivery of its Submittal by the date and time specified in Section 3.1 (Schedule of Events). HHSC PCS will time stamp each Submittal. A Submittal received after the deadline specified in Section 3.1 (Schedule of Events) will be rejected and not considered for Contract award.
3.6.2 Delivery – General Instructions
It is the Respondent’s responsibility to appropriately mark and deliver the Submittal to HHSC PCS by the date and time specified in Section 3.1 (Schedule of Events). HHSC will not be responsible for submission errors that may lead to disqualification due to nonreceipt or late delivery of a Submittal. In no event will HHSC be responsible or liable for any delay or error in delivery.
3.6.3 Submittal – Component Parts
Respondent shall submit its Submittal in component parts as described below:
a. One file/folder named “Original” that contains the Respondent’s entire Submittal (except the HUB Subcontracting Plan) in searchable portable document format (PDF), unless otherwise specified for a particular attachment or exhibit.
b. In accordance with Section 4.1 (HUB Subcontracting Plan), one file/folder named “HUB Subcontracting Plan” in searchable PDF, that contains the Respondent’s HUB Subcontracting Plan, and all supporting documentation.
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 23 of 47
c. If applicable, one file/folder named “Public Information Act Copy” that contains the Respondent’s entire Submittal, including all exhibits and attachments, in searchable PDF prepared in accordance with Section 8.6 (Public Information Act).
3.6.4 Submission Options
Respondent must submit the Submittal using the following submission options. A Submittal submitted by any other method will not be considered.
USB Drive: Respondent must place the Submittal on one USB drive, organized using the component parts file structure set out above. The USB drive must be labeled “Original”.
Respondent must deliver the Submittal by one of the methods specified below.
Overnight/Express/Priority Mail Hand Delivery
Health and Human Services Commission ATTN: Response Coordinator
Tower Building Room 108 1100 W. 49th St., MC 2020
Austin, Texas 78756
Health and Human Services Commission ATTN: Response Coordinator
Procurement & Contracting Services Building
1100 W. 49th St., MC 2020 Austin, Texas 78756
A Submittal delivered by mail or hand delivery must be placed in a sealed package. It is Respondent’s sole responsibility to ensure that packaging is sufficient to prevent damage to contents. HHSC will not be held responsible for any Submittal that is mishandled prior to receipt by HHSC PCS.
The sealed package and each USB drive must be clearly labeled on the outside as follows:
SOLICITATION NO: [Respondent to include Solicitation Number from Page 1 of this Solicitation.]
SOLICITATION NAME [Respondent to include Solicitation Name from Page 1 of this Solicitation.]
SUBMITTAL DEADLINE [Respondent to include Date and Time from Section 3.1 (Schedule of Events).]
PURCHASER NAME: [Respondent to include purchaser name from Section 3.3.1 (Sole Point of Contact).]
RESPONDENT NAME: [Respondent to include its name.]
HHS CMR Two-step RFQ Template RFQ No. HHS0013673 - Addendum 02 Revision Page 24 of 47
Respondent is solely responsible for ensuring its Submittal is submitted in accordance with all Solicitation requirements including, but not limited to, proper labeling of packages, sufficient postage or delivery fees, and ensuring timely receipt by HHSC. A dated shipping label, invoice of receipt from the delivery carrier, or any other documentation in lieu of the HHSC PCS time stamp WILL NOT be accepted.
HHS CMR Two-step RFQ Template RFQ…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .