This document is the Scope of Work for RFB #43-07-1311 Environmental Laboratory Complex, a request for bids issued by the Brazos River Authority for the construction of a new Environmental Services Laboratory and Enclosed Boat Storage facility. The project will take place in Mclennan County and the City of Waco, Texas. The Scope of Work provides detailed specifications for the laboratory and boat storage requirements, including square footage, room layouts, equipment, utilities, and other technical details. Bids are due by a specified date, and a mandatory pre-bid conference is scheduled for interested contractors. The contract will be awarded to the lowest qualified bidder, and the successful contractor will be required to complete the project within a defined timeframe.
The Scope of Work also outlines pricing and payment terms, including unit pricing for key line items. No specific funding sources or set-aside requirements are mentioned. There is no information provided about any incumbent contractor or the current environment for this type of project. The document focuses solely on the technical requirements and bid submission process for this state and local government contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brazos River Authority
RFB NO. 43-07-1311
Environmental Laboratory Complex
Specifications
ISSUED FOR BID
September 13 2023
Gresham Smith
500 N Akard Street
Suite 3210
Dallas, TX 75201
September 13, 2023 Environmental Laboratory Complex
RFB No. 43-07-1311
This page is intentionally blank.
RFB No. 43-07-1311 00 01 10 - 1 Table of Contents
SECTION 00 01 10
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUREMENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 Title Page
00 01 05 Certifications Page
00 01 10 Table of Contents
00 50 00 Agreement
00 61A 00 Performance Bond
00 61B 00 Warranty Bond
00 62 00 Payment Bond
00 70 00 Standard General Conditions of the Construction Contract
00 80 00 Supplementary Conditions
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements
01 11 00 Summary of Work
01 14 00 Work Restrictions
01 25 00 Substitution Procedures
01 26 13 Request for interpretation
01 31 00 Project Management and Coordination
01 32 00 Construction Progress Documentation
01 32 36.10 Video, Temperature and Humidity Monitoring and Documentation
01 33 00 Submittal Procedures
01 35 29 Health Safety and Emergency Response Procedures
01 40 00 Quality Requirements
01 41 00 Regulatory Requirements
01 42 16 References
01 50 00 Temporary Facilities and Controls
01 57 13 Temporary Erosion and Sediment Control
01 57 19 Temporary Environmental Controls
RFB No. 43-07-1311 00 01 10 - 2 Table of Contents
DIVISION 01 - GENERAL REQUIREMENTS
01 64 00 Owner Furnished Products
01 65 00 Product Delivery Requirements
01 66 00 Product Storage and Handling Requirements
01 71 14 Mobilization and Demobilization
01 73 00 Execution
01 74 00 Cleaning and Waste Management
01 75 00 Starting and Adjusting
01 77 00 Closeout Procedures
01 78 00 Closeout Submittals
DIVISION 2 - EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 3 – CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 4 - MASONRY
04 05 11 Masonry Mortaring and Grouting
04 20 00 Unit Masonry
04 26 13 Masonry Veneer
04 27 23 Cavity Wall Unit Masonry
04 43 13 Stone Masonry Veneer
DIVISION 5 – METALS
05 12 00 Structural Steel Framing
05 31 00 Steel Deck
05 40 00 Cold-Formed Metal Framing
05 50 00 Metal Fabrications
05 51 33 Metal Ladders
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry
DIVISION 7 - THERMAL AND MOISTURE PROTECTIONS
07 13 00 Sheet Waterproofing
RFB No. 43-07-1311 00 01 10 - 3 Table of Contents
DIVISION 7 - THERMAL AND MOISTURE PROTECTIONS
07 21 00 Thermal Insulation
07 27 00 Air Barriers
07 42 13 Metal Wall Panels
07 54 23 Thermoplastic Polyolefin (TPO) Membrane Roofing - Carlisle
07 62 00 Sheet Metal Flashing and Trim
07 71 00 Roof Specialties
07 71 23 Manufactured Gutters and Downspouts
07 72 00 Roof Accessories
07 92 00 Joint Sealants
DIVISION 8 – OPENINGS
08 11 13 Hollow Metal Doors and Frames
08 14 16 Flush Wood Doors
08 31 00 Access Doors and Panels
08 33 23 Overhead Coiling Doors
08 43 13 Aluminum-Framed Storefronts
08 71 00 Door Hardware
08 80 00 Glazing
08 91 00 Louvers
DIVISION 9 – FINISHES
09 21 16 Gypsum Board Assemblies
09 30 00 Tiling
09 51 00 Acoustical Ceilings
09 65 16.33 Rubber Sheet Flooring
09 91 13 Exterior Painting
09 91 23 Interior Painting
DIVISION 10 – SPECIALTIES
10 14 00 Signage
10 26 00 Wall and Door Protection
10 28 00 Toilet, Bath, and Laundry Accessories
10 44 00 Fire Protection Specialties
10 73 16.13 Metal Canopies
RFB No. 43-07-1311 00 01 10 - 4 Table of Contents
DIVISION 10 – SPECIALTIES
10 73 26 Walkway Coverings
10 82 13 Exterior Grilles and Screens
DIVISION 11 - EQUIPMENT
11 53 00 Laboratory Equipment
11 53 13 Laboratory Fume Hoods and Related Products
11 53 14 Fume Extractors
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades
12 35 53.13 Metal Laboratory Casework
12 36 00 Countertops
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems
13 46 13 Lightning Protection for Structures
DIVISION 21 - FIRE SUPPRESSION
21 05 00 Common Work Results for Fire Suppression
21 10 00 Water Based Fire Suppression Systems
DIVISION 22 - PLUMBING
22 05 00 Common Work Results for Plumbing
22 05 13 Common Motor Requirements for Plumbing Equipment
22 05 19 Meter and Gauges for Plumbing Piping
22 05 23 General Duty Valves for Plumbing Piping
22 05 29 Hangers and Supports for Plumbing Piping and Equipment
22 05 53 Identification for Plumbing Piping and Equipment
22 07 00 Plumbing Insulation
22 11 16 Domestic Water Piping
22 11 19 Domestic Water Piping Specialties
22 11 23 Domestic Water Pumps
22 13 16 Drainage and Vent Piping
22 13 19 Drainage Piping Specialties
RFB No. 43-07-1311 00 01 10 - 5 Table of Contents
DIVISION 22 - PLUMBING
22 13 23 Sanitary Waste Interceptors
22 40 00 Plumbing Fixtures
22 63 13 Gas Piping for Laboratory Facilities
22 66 00 Chemical-Waste Systems for Laboratory Facilities
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 00 Common Work Results for HVAC
23 05 13 Common Motor Requirements for HVAC Equipment
23 05 14 Variable Frequency Motor Controllers
23 05 19 Meters and Gages for HVAC Piping
23 05 23 General Duty Valves for HVAC Piping
23 05 29 Hangers and Supports for HVAC Piping and Equipment
23 05 48 Vibration and Seismic Controls for HVAC
23 05 53 Identification for HVAC Piping and Equipment
23 05 93 Testing, Adjusting, and Balancing
23 07 13 Duct Insulation
23 07 19 HVAC Piping Insulation
23 09 00 Instrumentation and Control for HVAC
23 09 95.00 Laboratory Airflow Control System
23 11 23 Facility Natural Gas Piping
23 21 13 Hydronic Piping
23 21 23 Hydronic Pumps
23 23 00 Refrigerant Piping
23 25 00 HVAC Water Treatment
23 31 13 Metal Ducts
23 33 00 Air Duct Accessories
23 34 23 HVAC Power Ventilators
23 37 13 Diffusers, Registers, and Grilles
23 74 33 Packaged Outdoor Heating and Cooling Makeup Air Conditioners
23 81 26 Split System Air Conditioners
23 81 29 Variable Refrigerant Flow HVAC Systems
23 82 16 Air Coils
RFB No. 43-07-1311 00 01 10 - 6 Table of Contents
DIVISION 26 - ELECTRICAL
26 05 00 Common Work Results for Electrical
26 05 19 Voltage Electrical Power Conductors and Cable
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Supports for Electrical Systems
26 05 33 Raceways and Boxes for Electrical Systems
26 05 36 Cable Trays for Electrical Systems
26 05 43 Underground Ducts and Raceways for Electrical Systems
26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling
26 05 48 Vibration and Seismic Controls
26 05 53 Identification for Electrical Systems
26 05 73 Power Distribution Equipment Studies
26 09 23 Lighting Control Devices
26 22 13 Voltage Distribution Transformers
26 24 16 Panelboards
26 27 26 Wiring Devices
26 27 33 Power Distribution Units
26 28 13 Fuses
26 28 16 Enclosed Switches and Circuit Breakers
26 32 13.16 Gaseous Emergency Engine Generators
26 33 53 Static Uninterruptible Power Supply
26 36 00 Transfer Switches
26 41 13 Lighting Protection for Structures
26 43 13 Voltage Electrical Power Circuits
26 51 19 LED Interior Lighting
26 52 13 Emergency and Exit Lighting
26 56 19 LED Exterior Lighting
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 46 21.11 Addressable Fire-Alarm Systems
DIVISION 31 - EARTHWORK
31 10 00 Site Clearing
31 22 00 Grading
31 23 16 Excavation
RFB No. 43-07-1311 00 01 10 - 7 Table of Contents
DIVISION 31 - EARTHWORK
31 23 16.13 Trenching
31 23 23 Fill
31 63 29 Drilled Concrete Piers and Shafts
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 Aggregate Base Courses
32 12 16 Asphalt Paving
32 13 13 Concrete Paving
32 16 23 Sidewalks
32 17 23 Pavement Markings
32 17 26 Tactile Warning Surfacing
32 33 00 Site Furnishings
32 35 00 Wood Fences and Gates
DIVISION 33 – UTILITIES
33 01 10.58 Disinfection of Water Utility Piping Systems
33 05 61 Concrete Manholes
33 14 16 Site Water Utility Distribution Piping
33 31 13 Site Sanitary Sewerage Gravity Piping
33 42 11 Stormwater Gravity Piping
33 42 30 Stormwater Drains
33 52 16 Gas Hydrocarbon Piping
APPENDICES
Appendix 1 Geotechnical Investigation
Appendix 2 Owner Furnished Contractor Installed Equipment
Appendix 3 Contractor Furnished Contractor Installed Equipment
ISSUED: DATE:
Issue For Bid September 13, 2023
END OF TABLE OF CONTENTS
FORM – CCA10142021
00 50 00- Agreement – Environmental Laboratory Complex Page 1 of 5
00 50 00 AGREEMENT
THIS AGREEMENT is dated as of the ___day of ________in the year 2021 by and between Brazos River Authority, hereinafter called OWNER, and ____________________, hereinafter called CONTRACTOR.
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Article 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
Article 2. CONTRACT TIMES
2.1. Substantial Completion: Work shall be substantially complete in accordance with paragraph
14.04 of the General Conditions as modified by the Supplementary Conditions, each of which is attached hereto and incorporated herein by reference, on or before the 630th day following the date set forth in the Notice to Proceed.
2.2. Final Inspection: On-site construction activities shall be fully completed as determined by the
ENGINEER through the Final Inspection process in accordance with paragraph 14.06 of the General Conditions as modified by the Supplementary Conditions, each of which is attached hereto and incorporated herein by reference, on or before the 660th day following the date set forth in the Notice to Proceed..
2.3. Final Completion: Work shall be completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions as modified by the Supplementary Conditions, each of which is attached hereto and incorporated herein by reference, on or before the 690th day following the commencement date set forth in the Notice to Proceed or the 60th day following the date of Substantial Completion, whichever is earlier.
2.4. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this
Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraphs 2.1, 2.2 and 2.3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions and the Supplementary Conditions. OWNER and CONTRACTOR also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER One Thousand dollars ($1,000.00) for each day that expires after the time specified in either paragraph 2.1 (Substantial Completion) or 2.2 (Final Inspection) until such milestones are achieved. After ENGINEER has issued a Certificate of Substantial Completion, CONTRACTOR shall pay OWNER One Thousand dollars ($1,000) for each day that expires after the time specified in paragraph 2.3 for Final Completion and readiness for Application for Final Payment until such milestone is achieved. CONTRACTOR will not be obligated to pay overlapping liquidated damages for concurrent delays.
Article 3. CONTRACT PRICE
OWNER agrees to pay CONTRACTOR in current U.S. funds the price or prices shown in the Bid Form attached hereto and incorporated herein, which is a part of this Agreement, such payments to be subject to the General Conditions and Supplementary Conditions which are attached hereto and incorporated herein. The total lump sum Contract Price is:
_______________________________________________________________ Dollars ($xxxxxxx.xx)
00 50 00- Agreement – Environmental Laboratory Complex Page 2 of 5
Article 4. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions as modified by the Supplementary Conditions. Applications for Payment will be processed by OWNER as provided in the General Conditions as modified by the Supplementary Conditions.
4.1. Progress Payments. Prior to Final Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as OWNER shall determine, or OWNER may withhold, in accordance with paragraph 14.02.B.5. of the General Conditions as modified by the Supplementary Conditions.
4.1.1. Ninety (90) percent of Work completed (with the balance being retainage).
4.1.2. Ninety (90) percent (with the balance being retainage) of the approved value of materials and equipment not incorporated in the Work but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.02 of the General Conditions as modified by the Supplementary Conditions.
4.1.3. Ten (10) percent of the price of the Work completed (retainage) will be withheld by the
OWNER on this Project until Final Completion.
4.2. Final Payment. Upon Final Completion of the work and acceptance of CONTRACTOR’s Final Application for Payment in accordance with paragraph 14.07.B. of the General Conditions as modified by the Supplementary Conditions, OWNER shall pay the remainder of the Contract Price.
Article 5. CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations:
5.1. CONTRACTOR has thoroughly examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents including "technical data."
5.2. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, performance or furnishing of the Work.
5.3. CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and
Regulations that may affect cost, progress, performance and furnishing of the Work.
5.4. CONTRACTOR acknowledges that OWNER does not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the Site.
5.5. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions at or contiguous to the Site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and all safety precautions and programs incident thereto.
5.6. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with all other terms and conditions of the Contract Documents.
00 50 00- Agreement – Environmental Laboratory Complex Page 3 of 5
5.7. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.
5.8. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities or discrepancies in the Contract Documents and the written resolution thereof by OWNER through issued addendum or addenda is acceptable to CONTRACTOR, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. When said conflicts, etc., have not been resolved through interpretation or clarification by OWNER, because of insufficient time or otherwise, CONTRACTOR has included in the Bid the greater quantity or better quality of Work, or compliance with the more stringent requirement resulting in a greater cost; and said greater cost is included in the Contract Price.
Article 6. CONTRACT DOCUMENTS
The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following:
6.1. Request for Bids
6.2. Agreement
6.3. Certificates of Insurance
6.4. Performance Bond
6.5. Payment Bond
6.6. Warranty Bond
6.7. Standard General Conditions (of the Construction Contract.)
6.8. Supplementary Conditions
6.9. Specifications bearing the title Environmental Laboratory Complex Project, RFB No. 43-07-1311- consisting of the Divisions and Sections listed in table of contents thereof.
6.10. Drawings consisting of a cover sheet and sheets numbered 2 through 33 inclusive, as listed in the
Drawing Index on the Drawing cover sheet.
6.11. Bid Form
6.12. Vendor Compliance to State Law
6.13. Non-collusion Affidavit
6.14. All Addenda issued for the project.
6.15. Documentation submitted by CONTRACTOR prior to Notice of Award.
6.16. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto:
00 50 00- Agreement – Environmental Laboratory Complex Page 4 of 5
6.16.1. All written amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions.
Article 7. MISCELLANEOUS
7.1. Terms used in this Agreement which are defined in the General Conditions will have the meanings indicated in the General Conditions, unless such terms are contained in or have been modified by the Supplementary Conditions, which shall then prevail. Additionally, references to provisions in the General Conditions shall be inclusive of any additions and/or modifications set forth in the Supplementary Conditions, which shall then prevail.
7.1.1. The term Engineer used in this Agreement shall mean the Engineer or Engineering Firm who prepared the Drawings and Specifications for the work, or such other Engineer or Engineering Firm as the OWNER may designate.
7.2. CONTRACTOR hereby verifies that CONTRACTOR:
7.2.1. Does not currently, and will not for the term of this Agreement, boycott Israel;
7.2.2. Does not currently, and will not for the term of this Agreement, boycott any company that engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law;
7.2.3. Does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association and will not discriminate during the term of this Agreement against a firearm entity or firearm trade association.
7.3. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
7.4. OWNER and CONTRACTOR each bind itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents.
7.5. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
7.6. Except as otherwise provided within the Contract Documents, the failure of OWNER to enforce any provision of the Contract Documents shall not constitute or be construed as a waiver of such provision or of the right to enforce such provision. To be legally binding on OWNER, any waiver must be in writing.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR.
00 50 00- Agreement – Environmental Laboratory Complex Page 5 of 5
This Agreement will be effective on _______________, 2021 (which is the Effective Date of the Agreement).
OWNER: Brazos River Authority CONTRACTOR: _________________________
By: DAVID COLLINSWORTH By: ___________________________________
[CORPORATE SEAL]
Attest _________________________ Attest _________________________________
Address for providing notice: Address for providing notice:
4600 Cobbs Drive ________________________ Waco, Texas 76710 ________________________
NOTE: If CONTRACTOR is a corporation, attach evidence of authority to sign.
END OF SECTION
00 61A 00 – Performance Bond – Environmental Laboratory Complex Page 1 of 2
00 61A 00 PERFORMANCE BOND
STATE OF TEXAS Bond No. ________________________
COUNTY OF _______________________ C.I.P. ID No. _____________________
Project Name: Environmental Laboratory Complex
Know All Men By These Presents: That _____________________________________________ of the City of _________________________, County of ____________________________, and State of ________________________________, as Principal, and _____________________, a solvent company authorized under laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto The Brazos River Authority (OWNER), in the penal sum of____________________________________________________________________________ U.S. Dollars ($ ____________________U.S.) for payment whereof, well and truly to be made, said Principal and Surety bind themselves and their heirs, administrators, executors, successors and assigns, jointly and severally, by these presents:
Conditions of this Bond are such that, whereas, Principal has entered into a certain written contract with OWNER, dated the ____________ day of ____________________, ________, which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein.
Now, therefore, the condition of this obligation is such, that if said Principal shall faithfully perform said Agreement and shall in all respects duly and faithfully observe and perform all and singular covenants, conditions and agreements in and by said contract agreed and covenanted by Principal to be observed and performed, and according to true intent and meaning of said Agreement hereto annexed, then this obligation shall be void; otherwise to remain in full force and effect. If OWNER notifies Principal and Surety the OWNER is considering declaring Principal in default, Surety agrees to meet with OWNER and Principal no later than fifteen days after receipt of such notice to discuss methods of performing the Work of the Contract.
Provided, however, that this bond is executed pursuant to provisions of Chapter 2253, Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with provisions of said Article to same extent as if it were copied at length herein.
Surety, for value received, stipulates and agrees that no change in Contract Time or Contract Amount shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change in Contract Time or Contract Amount.
In witness whereof, said Principal and Surety have signed and sealed this instrument this _____________________________day of _________________________, ________.
Principal Surety
By________________________ By_____________________________ Title______________________ Title____________________________ Address___________________ Address_________________________
00 61A 00 – Performance Bond – Environmental Laboratory Complex Page 2 of 2
Telephone_______Fax____________ Telephone_______Fax____________
E-Mail Address __________________ E-Mail Address __________________
Name and address of Resident Agent of Surety:
Note: Bond shall be issued by a solvent Surety company authorized to do business in Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law.
A copy of surety agent's "Power of Attorney" must be attached hereto.
END of SECTION
00 61B 00 – Warranty Bond – Environmental Laboratory Complex Page 1 of 4
00 61B 00 WARRANTY BOND
1. The CONTRACTOR and the SURETY, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the OWNER for the performance of all warranty obligations in the Construction Contract, including payment of claims, subcontractors, suppliers and mechanics, as a condition of release of the Performance Bond and Payment Bond with respect to the Project by OWNER. The following terms and conditions shall apply with respect to this Bond:
1.1 The Construction Contract, including all
Contract Documents and changes made to the Construction Contract and the Contract Documents, is incorporated herein by reference.
1.2 SURETY’s obligations under this Bond shall
include the CONTRACTOR’s obligation to pay its subcontractors, suppliers and mechanics for warranty-related work or supply.
1.3 SURETY’s obligations under this Bond shall
include without limitation the CONTRACTOR’s obligation to design, fabricate, deliver, install and warrant the Work.
1.4 The guarantees contained herein shall
survive the Final Completion of the Work called for in the Construction Contract.
1.5 As a part of the obligation secured hereby
and in addition to the face amount specified, costs and reasonable expenses and fees, including reasonable attorneys’ fees incurred by OWNER in successfully enforcing the obligation, shall be included.
2. If the CONTRACTOR shall promptly and faithfully perform all of its warranty obligations for the work specified in the Construction Contract Documents, as they may be amended or supplemented, including, without limitation, the fulfillment of all specified warranties for such work and payment of claims, subcontractors, suppliers and mechanics, then the SURETY and the CONTRACTOR have no obligation under this Bond, except to participate in conferences as provided in paragraph 3.1. Otherwise, this obligation shall remain in full force and effect.
3. If there is no OWNER Default, the SURETY's obligation under this Bond shall arise whenever the following actions are undertaken by the OWNER:
3.1. The OWNER notifies the CONTRACTOR
and the SURETY at the addresses described in paragraph 9 below, that the CONTRACTOR has failed to fulfill its warranty obligations under the terms of the Construction Contract and that the OWNER requests a conference with the CONTRACTOR and the SURETY be held not later than fifteen (15) business days after receipt of such notice to discuss methods of performing the warranty obligations under the Construction Contract. If the OWNER, the CONTRACTOR and the SURETY agree, the CONTRACTOR shall be allowed a reasonable time to perform the warranty work, but such an agreement shall not waive the OWNER's right, if any, subsequently to declare a CONTRACTOR Default.
3.2. The OWNER has declared a
CONTRACTOR Default and formally terminated the CONTRACTOR's right to complete the warranty obligations under the Construction Contract. Such CONTRACTOR Default shall not be declared earlier than twenty (20) business days after the CONTRACTOR and the SURETY have received notice as provided in paragraph 3.1.
4. When the OWNER has satisfied the conditions of paragraph 3, the SURETY shall promptly and at the SURETY's expense take one of the following actions:
4.1 Arrange for CONTRACTOR to perform and
complete the warranty obligations of this Bond.
4.2 Complete the warranty work itself in
accordance with the terms and conditions of the Construction Contract then in effect, through its agents or through independent vendors.
4.3 Obtain bids or negotiated proposals from
qualified vendors acceptable to the OWNER for a contract for performance and completion of the warranty work (as defined in the Construction Contract), through a procurement process approved by the OWNER, arrange for a contract to be prepared for execution by the OWNER and the vendor selected with the OWNER’s concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract.
4.4 Waive its right to perform and complete, arrange for completion, or obtain a new vendor and with reasonable promptness under the circumstances, (i) reimburse the OWNER for any and all costs incurred by OWNER in performing
00 61B 00 – Warranty Bond – Environmental Laboratory Complex Page 2 of 4
CONTRACTOR’s warranty obligations, or (ii) deny liability in whole or in part and notify the OWNER citing reasons therefore.
5. If the SURETY does not proceed as provided in paragraph 4 with reasonable promptness, the SURETY shall be deemed to be in default on this Bond fifteen (15) business days after receipt of an additional written notice from the OWNER to the SURETY demanding that the SURETY perform its obligations under this Bond, and the OWNER shall be entitled to enforce any remedy available to the OWNER. If the SURETY proceeds as provided in paragraph 4.4, and the OWNER refuses the payment tendered or the SURETY has denied liability, in whole or in part, then without further notice, the OWNER shall be entitled to enforce any remedy available to the OWNER, including without limitations filing suit against the SURETY under this Bond.
6. After the OWNER has terminated the CONTRACTOR's right to complete the Construction Contract, and if the SURETY elects to act under paragraph 4.1, 4.2, or 4.3 above, then the responsibilities of the SURETY to the OWNER shall not be greater than those of the CONTRACTOR under the Construction Contract, and the responsibilities of the OWNER to the SURETY shall not be greater than those of the OWNER under the Construction Contract. To a limit of the amount of this Bond plus reasonable expenses and fees incurred by OWNER in successfully enforcing this obligation, the SURETY is obligated without duplication for the following:
6.1. The responsibilities of the CONTRACTOR
for warranty period work as set forth in the Construction Contract, including without limitations correction of defective materials or labor.
6.2. Actual damages including additional legal, design professional and delay costs resulting from the CONTRACTOR's Default or resulting from the actions or failure to act of the SURETY.
6.3. Liquidated damages, or if no liquidated
damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the CONTRACTOR or the actions or failure to act of SURETY under Paragraph 5.
7. The SURETY shall not be liable to the OWNER or others for obligations of the CONTRACTOR that are unrelated to the Construction Contract. No right of action shall accrue on this Bond to any person or entity other than the OWNER or its heirs, executors, administrators, or successors.
8. The SURETY hereby waives notice of any change, including changes of Contract Times, Contract Price, or Work to be performed to the Construction Contract or to related subcontracts, purchase orders and other obligations.
9. Notice to the SURETY, the OWNER or the CONTRACTOR shall be mailed or delivered to the address shown on the signature page.
10. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the Construction Contract was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
11. Capitalized terms not otherwise defined hereinafter shall have the definitions set forth in the Construction Contract.
11.1. Bond: This Warranty Bond
11.2 Construction Contract: The agreement
between the OWNER and CONTRACTOR identified on the cover page of this Warranty Bond, including all Contract Documents and changes made to the agreement and the Contract Documents.
11.3. Contract Documents: As defined in the
Construction Contract.
11.4 CONTRACTOR Default: Failure of the
CONTRACTOR, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract.
11.5. Final Completion: As defined in the
Construction Contract.
11.6 OWNER Default: Failure of the OWNER, which has neither been remedied nor waived, to pay the CONTRACTOR as required by the Construction Contract or to perform and complete or comply with the other terms thereof.
11.7 Project: As defined in the Construction
Contract.
00 61B 00 – Warranty Bond – Environmental Laboratory Complex Page 3 of 4
11.8 Work: As defined in the Construction
Contract.
12. No alteration, modification or supplement to the warranty provisions of the Construction Contract or the nature of the work to be performed thereunder, including without limitation any extension of time for performance, shall in any way relieve the SURETY of its obligations under this Bond.
13. This document is a MODIFIED version of EJCDC® C-xxx, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved.
Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
00 61B 00 – Warranty Bond – Environmental Laboratory Complex Page 4 of 4
CONTRACTOR SURETY
Name: [Full formal name of Contractor] Name: [Full formal name of Surety]
Address (principal place of business): Address (principal place of business):
[Address of Contractor’s principal place of business] [Insert address of Surety’s principal place of business]
OWNER Construction Contract
Name: [Full formal name of Owner] Description (name and location):
Address (principal place of business): [Owner’s project/contract name, and location of the project] [Address of Owner’s principal place of business]
Contract Price: [Amount from Contract]
Effective Date of Contract: [Date from Contract]
Contract’s Date of Substantial
Completion:
[Date from
Contract]
Bond
Bond Amount: [Amount] Bond Period: Commencing upon Final Completion of the Work under the Construction Contract, and continuing until [insert number of years, typically either two or three] years after such Final Completion.
Date of Bond: [Date]
Modifications to this Bond form:
☐ None ☐ See Paragraph 9
SURETY and CONTRACTOR, intending to be legally bound hereby, subject to the terms set forth herein, do each cause this Warranty Bond to be duly executed by an authorized officer, agent, or representative.
CONTRACTOR as Principal SURETY
(Full formal name of CONTRACTOR) (Full formal name of SURETY) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature)
Name: Name:
(Printed or typed) (Printed or typed)
Title:
Title:
Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to
CONTRACTOR, SURETY, OWNER, or other party is considered plural where applicable.
00 62 00 - Payment Bond – Environmental Laboratory Complex Page 1 of 4
00 62 00 PAYMENT BOND
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR: SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
Brazos River Authority 4600 Cobbs Drive Waco, Texas 76710
CONTRACT
Date:
Amount: $ Description: Brazos River Authority – Environmental Laboratory Complex RFB No. 43-07-1311
BOND
Date (Not earlier than Contract Date):
Amount: $ Modifications to this Bond Form:
Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent, or representative.
CONTRACTOR AS PRINCIPAL SURETY
Company: ___________________________.(Corp. Seal) Company: (Corp. Seal)
Signature: Signature:
Name and Title: Name and Title:
(Attach Power of Attorney)
(Space is provided below for signatures of additional parties, if required.)
CONTRACTOR AS PRINCIPAL SURETY
Company: (Corp. Seal) Company: (Corp. Seal)
Signature: Signature:
Name and Title: Name and Title:
00 62 00 - Payment Bond – Environmental Laboratory Complex Page 2 of 4
EJCDC No. 1910-28-B (1996 Edition)Originally prepared through the joint efforts of the Surety Association of America, Engineers Joint Contract Documents Committee, the Associated General Contractors of America, the American Institute of Architects, the American Subcontractors Association, and the Associated Specialty Contractors.
00 62 00 - Payment Bond - Environmental Laboratory Complex Page 3 of 4
1. The CONTRACTOR and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the OWNER to pay for labor, materials and equipment furnished for use in the performance of the Contract, which is incorporated herein by reference.
2. With respect to the OWNER, this obligation shall be null and void if the CONTRACTOR:
2.1. Promptly makes payment, directly or indirectly, for
all sums due Claimants, and
2.2. Defends, indemnifies and holds harmless the
OWNER from all claims, demands, liens or suits by any person or entity who furnished labor, materials or equipment for use in the performance of the Contract, provided the OWNER has promptly notified the CONTRACTOR and the Surety (at the addresses described in paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the CONTRACTOR and the Surety, and provided there is no OWNER Default.
3. With respect to Claimants, this obligation shall be null and void if the CONTRACTOR promptly makes payment, directly or indirectly, for all sums due.
4. The Surety shall have no obligation to Claimants under this Bond until:
4.1. Claimants who are employed by or have a direct
contract with the CONTRACTOR have given notice to the Surety (at the addresses described in paragraph 12) and sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim.
4.2. Claimants who do not have a direct contract with
the CONTRACTOR:
1. Have furnished written notice to the CONTRACTOR and sent a copy, or notice thereof, to the OWNER, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and
2. Have either received a rejection in whole or in part from the CONTRACTOR, or not received within 30 days of furnishing the above notice any communication from the CONTRACTOR by which the CONTRACTOR had indicated the claim will be paid directly or indirectly; and
3. Not having been paid within the above 30 days, have sent a written notice to the Surety and sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the CONTRACTOR.
5. If a notice required by paragraph 4 is given by the OWNER to the CONTRACTOR or to the Surety, that is sufficient compliance.
6. When the Claimant has satisfied the conditions of paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions:
6.1. Send an answer to the Claimant, with a copy to the
OWNER, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed.
6.2. Pay or arrange for payment of any undisputed
amounts.
7. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety.
8. Amounts owed by the OWNER to the CONTRACTOR under the Contract shall be used for the performance of the Contract and to satisfy claims, if any, under any Performance Bond. By the CONTRACTOR furnishing and the OWNER accepting this Bond, they agree that all funds earned by the CONTRACTOR in the performance of the Contract are dedicated to satisfy obligations of the CONTRACTOR and the Surety under this Bond, subject to the OWNER's priority to use the funds for the completion of the Work.
9. The Surety shall not be liable to the OWNER, Claimants or others for obligations of the CONTRACTOR that are unrelated to the Contract. The OWNER shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond.
10. The Surety hereby waives notice of any change, including changes of time, to the Contract or to related Subcontracts, purchase orders and other obligations.
11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the Work or part of the Work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by paragraph 4.1 or paragraph 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by
00 62 00 - Payment Bond - Environmental Laboratory Complex Page 4 of 4 law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.
12. Notice to the Surety, the OWNER or the CONTRACTOR shall be mailed or delivered to the addresses shown on the signature page. Actual receipt of notice by Surety, the OWNER or the CONTRACTOR, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page.
13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the Contract was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is, that this Bond shall be construed as a statutory Bond and not as a common law bond.
14. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, the CONTRACTOR shall promptly furnish a copy of this Bond or shall permit a copy to be made.
15. DEFINITIONS
15.1. Claimant: An individual or entity having a direct
contract with the CONTRACTOR or with a Subcontractor of the CONTRACTOR to furnish labor, materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Contract, architectural and engineering services required for performance of the Work of the CONTRACTOR and the CONTRACTOR'S Subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished.
15.2. Contract: The agreement between the OWNER
and the CONTRACTOR identified on the signature page, including all Contract Documents and changes thereto.
15.3. OWNER Default: Failure of the OWNER, which
has neither been remedied nor waived, to pay the CONTRACTOR as required by the Contract or to perform and complete or comply with the other terms thereof.
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the
Controlling Law.
STANDARD
GENERAL CONDITIONS
OF THE
CONSTRUCTION CONTRACT
Prepared by
ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE
and
Issued and Published Jointly By
[INSERT LOGOS]
PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE
a practice division of the
NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS
AMERICAN CONSULTING ENGINEERS COUNCIL
AMERICAN SOCIETY OF CIVIL ENGINEERS
This document has been approved and endorsed by
The Associated General [seal] Contractors of America
Construction Specifications Institute
[seal]
These General Conditions have been prepared for use with the Owner-Contractor Agreements (No. 1910-8-A-1 or 1910-8-
A-2) (1996 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other.
Comments concerning their usage are contained in the EJCDC User’s Guide (No. 1910-50). For guidance in the preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. 1910-17) (1996
Edition).
EJCDC No. 1910-8 (1996 Edition)
00700 - 2
Copyright ©1996
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314
American Consulting Engineers Council
1015 15th Street N.W., Washington, DC 20005
American Society of Civil Engineers
345 East 47th Street, New York, NY 10017
00700 - 3
TABLE OF CONTENTS
Page
ARTICLE 1 - DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
1.02 Terminology
ARTICLE 2 - PRELIMINARY MATTERS
2.01 Delivery of Bonds
2.02 Copies of Documents
2.03 Commencement of Contract Times; Notice to Proceed
2.04 Starting the Work
2.05 Before Starting Construction
2.06 Preconstruction Conference
2.07 Initial Acceptance of Schedules
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE
3.01 Intent
3.02 Reference Standards
3.03 Reporting and Resolving Discrepancies
3.04 Amending and Supplementing Contract Documents
3.05 Reuse of Documents
ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE
POINTS
4.01 Availability of Lands
4.02 Subsurface and Physical Conditions
4.03 Differing Subsurface or Physical Conditions
4.04 Underground Facilities
4.05 Reference Points
4.06 Hazardous Environmental Condition at Site
ARTICLE 5 - BONDS AND INSURANCE
5.01 Performance, Payment, and Other Bonds
5.02 Licensed Sureties and Insurers
5.03 Certificates of Insurance
5.04 CONTRACTOR’s Liability Insurance
5.05 OWNER’s Liability Insurance
5.06 Property Insurance
5.07 Waiver of Rights
5.08 Receipt and Application of Insurance Proceeds
5.09 Acceptance of Bonds and Insurance; Option to Replace
5.10 Partial Utilization, Acknowledgment of Property Insurer
ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES
6.01 Supervision and Superintendence
6.02 Labor; Working Hours
6.03 Services, Materials, and Equipment
6.04 Progress Schedule
6.05 Substitutes and “Or-Equals”
6.07 Patent Fees and Royalties
00700 - 4
6.08 Permits
6.09 Laws and Regulations
6.10 Taxes
6.11 Use of Site and Other Areas
6.13 Safety and Protection
6.14 Safety Representative
6.15 Hazard Communication Programs
6.16 Emergencies
6.17 Shop Drawings and Samples
6.18 Continuing the Work
6.19 CONTRACTOR’s General Warranty and Guarantee
6.20 Indemnification
ARTICLE 7 - OTHER WORK
7.01 Related Work at Site
7.02 Coordination
ARTICLE 8 - OWNER’S RESPONSIBILITIES
8.01 Communications to Contractor
8.02 Replacement of ENGINEER
8.03 Furnish Data
8.04 Pay Promptly When Due
8.05 Lands and Easements; Reports and Tests
8.06 Insurance
8.07 Change Orders
8.08 Inspections, Tests, and Approvals
8.09 Limitations on OWNER’s Responsibilities
8.10 Undisclosed Hazardous Environmental Condition
8.11 Evidence of Financial Arrangements
ARTICLE 9 - ENGINEER’S STATUS DURING CONSTRUCTION
9.01 OWNER’S Representative
9.02 Visits to Site
9.03 Project Representative
9.04 Clarifications and Interpretations
9.05 Authorized Variations in Work
9.06 Rejecting Defective Work
9.07 Shop Drawings, Change Orders and Payments
9.09 Decisions on Requirements of Contract Documents and Acceptability of Work
9.10 Limitations on ENGINEER’s Authority and Responsibilities
ARTICLE 10 - CHANGES IN THE WORK; CLAIMS
10.01 Authorized Changes in the Work
10.02 Unauthorized Changes in the Work
10.03 Execution of Change Orders
10.04 Notification to Surety
10.05 Claims and Disputes
ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK
11.01 Cost of the Work
11.02 Cash Allowances
11.03 Unit Price Work
00700 - 5
ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES
12.01 Change of Contract Price
12.02 Change of Contract Times
12.03 Delays Beyond CONTRACTOR’s Control
12.04 Delays Within CONTRACTOR’s Control
12.06 Delay Damages
ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice of Defects
13.02 Access to Work
13.03 Tests and Inspections
13.04 Uncovering Work
13.05 OWNER May Stop the Work
13.06 Correction or Removal of Defective Work
13.07 Correction Period
13.08 Acceptance of Defective Work
13.09 OWNER May Correct Defective Work
ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION
14.01 Schedule of Values
14.02 Progress Payments
14.03 CONTRACTOR’s Warranty of Title
14.04 Substantial Completion
14.05 Partial Utilization
14.06 Final Inspection
14.07 Final Payment
14.09 Waiver of Claims
ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION
15.01 OWNER May Suspend Work
15.02 OWNER May Terminate for Cause
15.03 OWNER May Terminate For Convenience
15.04 CONTRACTOR May Stop Work or Terminate
ARTICLE 16 - DISPUTE RESOLUTION
16.01 Methods and Procedures
ARTICLE 17 - MISCELLANEOUS
17.01 Giving Notice
17.02 Computation of Times
17.03 Cumulative Remedies
17.04 Survival of Obligations
17.05…