This document is an addendum to a Competitive Sealed Proposal (CSP) issued by Texas State University for the Centennial Hall-Waste Pipe and Water Closet Replacement Project-2024. The project involves the replacement of cast-iron drain, waste, and vent pipes, including horizontal and vertical pipes, as well as the replacement of water closets. A pre-proposal walkthrough was held on November 28th, 2023, where questions were answered regarding the scope of work, inspection responsibilities, access to plumbing and restrooms, and the handling of demolition debris and material storage. The university will allow all restrooms to be shut down at the same time, except for the first-floor faculty/staff and ground floor restrooms, which can be coordinated for weekend closures.
The contract will be awarded to a general contractor firm, and the university will provide a location for a dumpster and storage container, though the contractor is responsible for any loss or damage to materials stored on campus. The university has prohibited the use of trap guards in labs, and all cast-iron DWV pipes must be replaced, even if not shown on the plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
CSP # 754- Centennial Hall-Waste Pipe and Water Closet Replacement Project-2024
December 6th, 2023
NOTICE TO ALL RESPONDENTS:
The following is Addendum No. 1 to the Compe��ve Sealed Proposal (CSP) ESBD Pos�ng number CSP No. 754 - Centennial Hall-Waste Pipe and Water Closet Replacement Project-2024 posted on November 6th, Centennial Hall-Waste Pipe and Water Closet Replacement Pre-Proposal Walk-Through
November 28th, 2023 @ 9:30am
The following ques�ons were asked and answered.
Q) SOW says remove cast iron pipes, does this include drain vents?
A) Roof Drains do not drain into the sanitary system, so they will not be replaced, only Cast-Iron, Drain Waste and Vent. Cast Iron Pipes, horizontal and ver�cal
Q) Do you want clean out in chase?
A) Yes, in the pipe chases inside the men/women restrooms and pipe chases immediately outside the restrooms. No clean-outs in stairwell pipe chases
Q) Who will inspect?
A) University, this can be set as a recurring in conjunc�on with work progress or 1 day no�ce
Q) All vendors agree not to see all plumbing / restrooms
A) Yes
Q) Any crawl space area? What Stairwell?
A) Yes -stairwell - The exit stairwell that we climbed into is the only place where you have to replace pipe. The stairwell leads to the crawl space
Q) In crawl space 4” pipe is dead does it need to be replaced?
A) No, only the 2” needs to be replaced.
Q) Restroom closure?
A) University will allow all restrooms to be shutdown at the same �me except for 1st floor faculty/Staff and the ground if floor restrooms can coordinate other closures or do �e-ins in the weekends
Q) Clarifica�on, if pipe is in the slab it does not get replaced ?
A) Correct, pipe in slab does not get replaced
Q) If it is in crawlspace, it gets replaced?
A) Yes, Crawlspace in both mechanical rooms on ground floor (breezeway area) and the stairwell men�oned in Ques�on 5 and 6 (same area)
Q) Will the University provide loca�on to place roll off dumpster and or storage container (possibly not onsite) for a lockable storage?
A) Yes, dumpster can be placed across the street and materials can be stored 2nd floor next to freight elevator. If Con-X is needed, we can store at Physical Plant.
University is not responsible for loss damage to anything the contractor places on campus.
Q) No trap guards in labs?
A) No, Trap Guards are prohibited by Campus Standards
Q) No pipe replacement being necessary
A) All Cast-Iron DWV Pipe must be replaced, even if it does not show on plans.
This is the main SOW. No Glass Pipe needs to be replaced.