ESBD_File_328827_Attachment D - HUB Compliance Reporting System - Online Process Guide.pdf
PDF 9 MB Posted
- Solicitation number
- 303-3-04702
- Issued by
- Texas
About this file
This document is a Request for Qualifications (RFQ) for Design-Build Services Multi-Award Task Order Contract (MATOC) for the Texas Border Infrastructure (TBI) Program issued by the Texas Facilities Commission (TFC). The RFQ is a two-step process, with Step One focused on qualifications and experience, and Step Two involving the issuance of Design Criteria Packages (DCPs) to the selected pool of up to five Design-Build firms from Step One. The selected Design-Build firms will be responsible for delivering TBI infrastructure, which may include physical barriers, lighting, patrol/maintenance pathways, electronic surveillance, and supporting facilities. The RFQ provides details on the project background, scope, design and construction deliverables, and a schedule of events, including an optional pre-submittal teleconference, submission deadline, and anticipated award and approval timelines.
The anticipated cost of work associated with each DCP is limited to less than $300 million, and the total award amount is dependent on funding appropriated for the TBI program. The RFQ indicates that the selected Design-Build firms will be required to enter into a zero-dollar contract with TFC, with the stipulated sum to be negotiated based on the DCP scope. Additional details on pricing terms, set-asides, and funding requirements are not provided in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HUB Compliance Reporting System
Online HSP Process Guide
Table of Contents Utilization Plan (HSP Plan) Introduction Page-3 Accessing the B2G System Page-4 Accessing the HSP Plan Page-9 HSP Entry and Submittal (4 Steps) Page-15 a.Method 1 – 100% HUB Participation Page-18 b.Method 2 – Meet the Goal Page-47
c. Method 3 – GFE- Solicitation Page-74 d.Method 4 – Self-Performing Page-107
Withdrawing a HSP Plan Page-116 Submitted HSP Status Check Page-118 Common Error Messages Page-120
Introduction Utilization Plan (HUB Subcontracting Plan - HSP) Online
The B2Gnow Utilization Plan module allows respondents to complete and submit HUB Subcontracting plans (utilization plans) on-line directly in the B2G system. An access code will be provided in the agency solicitation documents to Respondents allowing access to the on-line HSP form in the system. Once the HSP plan is accessed by Respondent, Respondents will have the ability to select an applicable Method of HUB Compliance, document subcontracting scopes, add all awarded HUB certified and NON-HUB subcontractors and suppliers, document Good Faith Effort (GFE) details and PDF version attachments, as well as other information as requested, before signing and submitting the HSP plan.
Submitted HSP plans are reviewed by HUB staff and are approved or denied.
HUB Staff will have the ability to return the HSP to Respondents for clarification and/or an initial Courtesy Review. The Respondent can request a Courtesy Review of the HSP before a final submittal with proposal. The Respondent will be allowed to submit an updated plan or final HSP submittal by a designated due date. The designated due date will correlate with the solicitation deadline date. 3
Accessing the B2G System
• Visit TFC website www.tfc.texas.gov
• Direct link: https://tfc.gob2g.com/
• Click on Log-In
• Enter log-in credentials http://www.tfc.texas.gov/ https://tfc.gob2g.com/
Dashboard
No Log-In Credentials?
Click “Information for vendors”
Need to look up an Account?
Account Lookup Search for an existing account for your company or a user account for yourself by clicking on Account Lookup link at the bottom of the information pop-up box.
Create An Account?
No B2G Account?
Click on “New Account” link to create an account
Accessing the HSP Plan
The system will direct you to a DASHBOARD page after you have entered log-in credentials then
Click on “Utilization Plans”
You may also access plans by Clicking on “View” then Click on “My Utilization Plans”
Presenter Notes Presentation Notes Missing second arrow to “My Utilization Plan”
Click on
“Create Utilization Plan”
Enter Access Code (provided in solicitation instructions) in “Code” box
Click on “Verify Code “
Review “Summary” and Requirement” Section to
• Confirm HSP entry of applicable solicitation
• Ensure your name is selected as the “Contact Person” for the HSP
Click on “Start Utilization Plan”
Click on “OK” in pop up message window to confirm the start of the utilization plan
Click on “OK” again to be directed to the HSP form
Review Utilization Plan Summary to include the project Diversity Goal
Click on “Fill in Utilization Plan Details”
HSP Entry and Submittal
Utilization Plan Details follow the section instructions to select the applicable
Method of HUB Compliance
Questions Section
Is this a Courtesy Review? – Select applicable Yes or No
The HUB Office will offer an initial courtesy review of the HSP for HUB compliance and return the HSP back to the Respondent with applicable feedback. The Respondent will be responsible for re-submitting the HSP online for a final review and approval by HUB Office staff by the solicitation designated deadline date. Failure to return the HSP online by the designated date will result in the HSP being deemed NONCOMPLIANT resulting in solicitation disqualification.
Select the Applicable Method
To Navigate directly to the applicable Method of HUB Compliance entry steps
Click on one of the Methods below
Method of HUB
100% HUB Participation
Methods of HUB Compliance 100% HUB Participation
Step 1
Utilization Plan Details section
Click on
100% HUB Participation box
– (box will turn blue upon selection)
Complete all required field – all other fields are optional
STEP
Questions Section
Is this a Courtesy Review?
Select applicable Yes or No
Click on “SAVE”
“Fill in Subcontracting Intentions” to enter Subcontracting Intentions (scopes)
Adding Subcontracting Intentions
Click “Add Row” to
• add multiple subcontracting intentions (scope)
• enter a NIGP Code or type the name of scope to select the applicable code from drop down list *
• repeat entry steps for each subcontracting intentions determined (scope)
Click on “Save” *Quick Tip – Entry is required in each field
Click on “OK” to
• confirm your entry of the subcontracting intentions (scope)
A system pop-up message will appear in green to confirm the information has been saved
Click on “Close”
STEP 1 is COMPLETE!
*Quick Tip -The subcontracting intentions will appear in pink until awarded subcontractors are added to match the NIGP code and percentages entered
*The system will generate an error message upon submission if matches are not complete 25
Step 2
Click on “Add Subcontractor” to
• add the selected subcontractors for each subcontracting intention
STEP
Step 2
Subcontractor Assignment
Click “Get Subcontractor” to
• Begin search engine results
• Select applicable vendor from the search engine results
How to search the B2G database for a Subcontractor
Enter Subcontractor Name in applicable field
Click on “Search”
Review Search Engine Results
Click on “Select Vendor” to select applicable subcontractor section
Contact Person
• Select the applicable compliance contact from the drop-down options
*Quick Tip – If the compliance contact is NOT listed in the drop-down options – Click on “QUICK ADD” to add contact
Vendor Contact
Enter required fields
• Name
• Email Address
• Phone Number
Click on “Save Contact”
HSP Entry and Submittal Methods of HUB Compliance- 100% HUB Participation
Vendor Address
• Select the vendor’s address from the drop-down options.
*Quick Tip – If the vendor address is NOT listed in the drop-down options – Click on “QUICK ADD” to add contact address
HSP Entry and Submittal
• Address Line
• City
• State
• Zip Code
• Country
Click on “Save Address”
HSP Entry and Submittal
Applicable Vendor Certifications section
• Review to ensure subcontractor HUB certification is still active
Subcontractor Details Section
Proposed Amount & Percent field
• select “by Percent”
• enter the same percentage entered in the Subcontractor Intentions section for the applicable scope
*Quick Tip – Click on “Click Here” to review a pop-up window of your subcontracting intentions entry
Subcontracting Intentions Pop-up window
• review your entry to ensure you enter the correct percentage per scope for the applicable subcontractor
Presenter Notes
Subcontractor Detail continued……….
Count Toward Goal field
• Select applicable response based on HUB certification status
Type of Participation field
• select applicable type
Subcontractor Detail continued……….
Work Description field
• enter applicable work description
Work Codes field
• assign applicable NIGP code
(code must corresponds to the NIGP code selected in subcontracting intentions section)
Comments field
• Enter statement justifying subcontractor selection – (examples- Best Value and/or HUB sub, NO HUBs bid
*Quick Tip- you must click on “Assign Selected Work Codes” to save the selection
Presenter Notes
Need a screenshot of selection BOLDED
Questions section If this a HUB subcontractor, have you had a continuous contract in place for than five years?
• Select applicable Yes, No, or NA
Indicate if this vendor is one of your protégé if in a Mentor Protégé Agreement
• Select applicable Yes, No, NA
Click on “Save” 39
Additional Subcontractor entry………
Return to “ADD SUBCONTRACTOR” section to
•repeat Add Subcontractor steps to enter the required Subcontractor fields for each subcontractor utilized
*Quick Tip - ensure all subcontractors have been added for the applicable NIGP Codes and % (percentage) that matches the entry in the Subcontracting Intentions section
No Pink Highlights
Presenter Notes
Need updated screen
Additional Subcontractor entry………
Return to “ADD SUBCONTRACTOR” section to
•repeat Add Subcontractor steps to enter the required Subcontractor fields for each subcontractor utilized
*Quick Tip - ensure all HUB subcontractors have been added for the applicable NIGP Codes and % (percentage) that matches the entry in the Subcontracting Intentions section 41
Step 3 is NOT applicable for the selected Method of HUB Compliance
Methods of HUB Compliance- 100% HUB Participation
STEP
Step 4 Submit HSP (Utilization) Plan
Click on “Submit Utilization Plan” to submit plan
HSP Entry and Submittal Methods of HUB Compliance- 100% HUB Participation
STEP
Review Affirmation Statements and check boxes accordingly
Enter your name and title in applicable fields
Click on “Submit Utilization Plan”
HSP Entry and Submittal Methods of HUB Compliance- 100% HUB Participation
STEP
A system message will appear to validate the HSP submission
Click on “OK” in pop up box to submit the utilization plan
HSP Entry and Submittal Methods of HUB Compliance- 100% HUB Participation
STEP
The HSP Entry is COMPLETE!
Methods of HUB Compliance- 100% HUB Participation
STEP
Meet the Goal
Step 1
Utilization Plan Details section
Click on
MEET THE GOAL box –
(box will turn blue upon selection)
Complete all required fields – all other fields are optional
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
Methods of HUB Compliance Meet the Goal
Questions Section
Is this a Courtesy Review?
Select applicable Yes or No
Click on “SAVE”
“Fill in Subcontracting Intentions” to enter subcontracting intentions (scopes)
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
• add multiple subcontracting intentions (scopes)
• enter a NIGP Code or type the name of scope to select applicable code from drop down list
• repeat entry steps for each subcontracting intentions (scope)
• Click on “Save”
*Quick Tip – Entry is required in each field
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
subcontracting intentions (scope)
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
A system pop-up message will appear in green to confirm the information has been saved
Click on “Close”
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
Step 1 is COMPLETE!
*Quick Tip - The subcontracting intentions will appear in pink until awarded subcontractors are added to match the NIGP code and percentages entered.
*The system will generate an error message upon submission if matches are not complete
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
Presenter Notes
Need screenshot
Click on “Add Subcontractor” to
• add the awarded subcontractors for each subcontracting intention.
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
Click “Get Subcontractor” to
• Begin search engine results
• Select applicable vendor from the search engine results
HSP Entry and Submittal Methods of HUB Compliance- Meet the Goal
STEP
How to search B2G database for a
Enter Subcontractor Name in applicable field
Review Search Engine Results
Click on “Select Vendor” to select applicable
Assignment section
Contact Person
• Select the applicable compliance contact from the drop-down options
*Quick Tip – If the compliance contact is NOT listed in the drop-down options – Click on “QUICK ADD” to add contact 59
Vendor Contact
• Name
• Email Address
• Phone Number
Click on “Save Contact”
Assignment
Vendor Address
• Select the vendor’s address from the drop-down options.
*Quick Tip – If the vendor address is NOT listed in the drop-down options – Click on “QUICK ADD” to add contact address 61
• Address Line
• City
• State
• Zip Code
• Country
Click on “Save Address”
• select “by Percent”
• enter the same amount entered in the Subcontractor intentions section for the applicable scope
*Quick Tip – Click on “Click Here” to review a pop-up window of your subcontracting intentions entry
Pop-up window-
• review your entry to ensure you entered the correct percentage per scope for the applicable subcontractor
Click on Close
Subcontractor Detail continued……….
Count Toward Goal field
• Select applicable response based on HUB certification status
Type of Participation field
• enter applicable work description
Work Codes field
• assign applicable NIGP code
(code must corresponds to the NIGP code in the subcontracting intentions section)
Comments field
• Enter statement justifying subcontractor selection – (examples- Best Value and/or HUB sub, NO HUBs bid
*Quick Tip – you must click on “Assign Selected Work Codes” to save the selection
If this is a HUB subcontractor, have you had a continuous contract in place for more than five years?
• Select applicable Yes, No, or NA
Indicate if this vendor is one of your protégé if in a Mentor Protégé Agreement
• Select Applicable Yes, No, or NA
Click on “Save”
Additional Subcontractor entry ……..
Return to the “ADD SUBCONTRACTOR” section of
•repeat Add Subcontractor steps to enter the required subcontractor fields for each subcontractor utilized
*Quick Tip - ensure all subcontractors have been added for the applicable NIGP Codes and % (percentage) that MATCHES the entry in the Subcontracting Intentions section
No Pink Highlights
STEP
Click on “Submit Utilization Plan” to submit plan
STEP
Enter your name and title in applicable fields
Click on “Submit Utilization Plan”
STEP
Click on “OK” in pop up box to submit this utilization plan
STEP
Methods of HUB Compliance- Meet the Goal
STEP
Presenter Notes
Need a new screenshot
Good Faith Effort (GFE)Solicitation
Click on
GFE SOLICITATION box – (box will turn blue upon selection)
Complete all required fields – all other fields are optional
HSP Entry and Submittal Methods of HUB Compliance- Good Faith Effort (GFE) Solicitation
STEP
Is this a Courtesy Review?
Select applicable Yes, No, N/A
Click SAVE
STEP
“Fill in Subcontracting Intentions” to enter subcontracting intentions (scopes)
STEP
• add multiple scopes
• enter NIGP Code or type the name of scope to select the applicable code from drop down list
• repeat entry steps for each subcontracting intentions determined (scope)
• Click on “Save” *Quick Tip – Entry is required in each field
STEP
subcontracting intentions (scope)
STEP
A system pop-up message will appear in green to confirm the information has been saved
Click on “Close”
STEP
Step 1 is COMPLETE!
*Quick Tip - The subcontracting intentions will appear in pink until awarded subcontractors are added to match the NIGP code and percentages entered
STEP
Click on “Add Subcontractor” to
• add the awarded subcontractors for each subcontracting intention
STEP
Click “Get Subcontractor” to
• Begin search engine result
• Select applicable vendor from the search engine results
STEP
How to search the B2G database for a
Enter Subcontractor Name in applicable field
Review Search Engine Results
Click on “Select Vendor” to select applicable section
Contact Person
• Select the applicable compliance contact from the drop-down options
*Quick Tip – If the compliance contact is NOT listed in the drop-down options – Click on “QUICK ADD” to add contact
• Select the vendor’s address from the drop-down options
Click on Save Contact
*Quick Tip – If the vendor address is NOT listed in the drop-down options
– Click on “QUICK ADD” to add contact address
• Select the vendor’s address from the drop-down options.
*Quick Tip – If the vendor address is NOT listed in the drop-down options
– Click on “QUICK ADD” to add contact address
• Address Line
• City
• State
• Zip Code
• Country
Click on “Save Address”
• select “by Percent”
• enter the same amount entered in the Subcontractor intentions section for the applicable scope
*Quick Tip – Click on “Click Here” to review a pop-up window of your subcontracting intentions entry
Pop-up window
• review your entry to ensure you enter the correct percentage per scope for the applicable
Count Toward Goal field
• Select applicable response based on HUB certification status
Type of Participation
• enter applicable work description
Work Codes field
• assign applicable NIGP code
(code must corresponds to the NIGP code in the subcontracting intentions section)
Comments field
• Enter statement justifying subcontractor selection – (examples- Best Value and/or HUB sub, NO HUBs bid
*Quick Tip – you must click on “Assign Selected Work Codes” to save the selection 93
If this is a HUB subcontractor, have you had a continuous contract in place for more than five years?
• Select applicable Yes, No, or N/A
Indicate if this vendor is one of your protégé if in a Mentor Protégé Agreement
• Select applicable Yes, No, or N/A
Click on “Save”
Additional Subcontractor entry ……
Return to the “ADD SUBCONTRACTOR” section to
•repeat ADD VENDOR steps to enter the required subcontractor fields for each subcontractor utilized
*Quick Tip - ensure all subcontractors have been added for the applicable NIGP Codes and % (percentage) that MATCHES the entry in the Subcontracting Intentions section
No Pink Highlights
Step 3
Provide GFE Details
Click on “Attach GFE files” link to
• attach PDF version of fax/email logs of HUBs solicited and Trade Organizations
• add required statement in Comment Box – (example statement -“see attached fax/email logs”)
Click on “Save GFE Details”
STEP
The GFE indicator will turn green once
• required attachments are complete
• required statement is made in comments field
STEP
Presenter Notes
Need screeshot
Step 3
Provide GFE Request Details
Click on “Add Subcontracting Opportunity Notifications” to
• enter 3 HUBs solicited and 2 Trade Organization per subcontracting intention
STEP
Click on “Add Row” for each subcontracting intention
• to open three entry fields per subcontracting intention
STEP
Subcontracting Opportunity Contacts
Date Notices Sent field
• enter date notice was sent to HUB vendor
Company Name field
• enter HUB vendor name
Request Received? field
• select applicable Yes or No
*Quick Tip – the system will validate the HUB vendor was certified when the notice was sent
STEP
Subcontracting Opportunity Contacts
Trade Organization
Date Notice Sent field
• enter date notice was sent
Trade Organization or Development Centers field
• enter trade organization or development center name
Click on “Save”
STEP
A system pop-up message will appear in green to confirm the entries have been saved
Click on “Close”
*Quick tip – a green check will appear to validate each HUB vendor was certified when solicited
STEP
Click on “Submit Utilization Plan” to submit plan
STEP
Enter your name and title in applicable fields
Click on “Submit Utilization Plan”
STEP
Click on “OK” in pop up box to submit this utilization plan
STEP
Methods of HUB Compliance- Good Faith Effort (GFE) Solicitation
STEP
Self-Performing
Utilization Plan Details Section
Click on “SELF-PERFORMING” box- (box will turn blue upon selection)
Complete all required fields – all other fields are optional
HSP Entry and Submittal Methods of HUB Compliance- Self-Performing
STEP
Presenter Notes
Need screenshot
Click on “Self-Performing” box (box will turn blue upon selection)
Enter required Self-Performing Justification Statements (example #of years in business, # of employees, awards/expertise, and/or previous experience on TFC projects in “Comments” box
Courtesy Review Question
• select Yes or No
Click on “Save”
HSP Entry and Submittal Methods of HUB Compliance- Self-Performing
STEP
Step 2 is NOT applicable for the selected Method of HUB Compliance
Methods of HUB Compliance- Self-Performing
STEP
Methods of HUB Compliance- Self-Performing
STEP
Click on “Submit Utilization Plan” to submit plan
STEP
Enter your name and title in applicable fields
Click on “Submit Utilization Plan”
STEP
Click on “OK” in pop up box to submit this utilization plan
STEP
Methods of HUB Compliance- Self Performing
STEP
Withdraw a HSP Plan
There is an option to withdraw the HSP BEFORE a decision by a
HUB Staff member
The HSP Plan will return to your My Utilization Plan list as
“Pending Submission”
Withdraw a HSP Plan
Check the Status of Your HSP Plan
Click on “View” then
“My Utilization Plan” to access all your HSP plans to determine status
Check the Status of Your HSP Plan
Common Error Messages
Actions to Take
Error #1 Ensure to “assign” applicable work (NIGP) codes when adding subcontractors
Error #2 - (for GFE-Solicitation Method) –ensure to “add” 3 HUBs and 2 Trade Organizations per scopes identified in subcontracting intentions
Error #3 – Ensure the percentages allocated to the selected subs MATCH your entry in subcontracting intentions section
Common Error Messages
QUESTIONS?
TFC HUB Office Contacts
Yolanda Strey – HUB Director Shonte’ Gordon – HUB Coordinator Email: Yolanda.strey@tfc.texas.gov Email: shonte.Gordon@tfc.texas.gov Phone: 512-516-5878 Phone: 512-201-9700
Javid Presson – HUB Coordinator David Delgado – HUB Specialist Email: Javid.presson@tfc.texas.gov Email: david.Delgado@tfc.texas.gov Phone: 737-308-1090 Phone: 512-608-1357 mailto:Yolanda.strey@tfc.texas.gov mailto:shonte.Gordon@tfc.texas.gov mailto:Javid.presson@tfc.texas.gov mailto:david.Delgado@tfc.texas.gov
| HUB Compliance Reporting System | ||||
| Table of Contents | ||||
| Introduction�Utilization Plan (HUB Subcontracting Plan - HSP) Online� | ||||
| Accessing the B2G System | ||||
| Dashboard | ||||
| No Log-In Credentials? �Click “Information for vendors” | ||||
| Need to look up an Account? | ||||
| Create An Account? | ||||
| Accessing the HSP Plan | ||||
| Accessing the HSP Plan | ||||
| Accessing the HSP Plan | ||||
| Accessing the HSP Plan | ||||
| Accessing the HSP Plan | ||||
| Accessing the HSP Plan | ||||
| HSP Entry and Submittal� | ||||
| HSP Entry and Submittal� | ||||
| Select the Applicable Method� | ||||
| Method of HUB Compliance �100% HUB Participation | ||||
| HSP Entry and Submittal�Methods of HUB Compliance | 100% HUB Participation � | |||
| HSP Entry and Submittal�Methods of HUB Compliance | 100% HUB Participation | |||
| Slide Number 21 | ||||
| Slide Number 22 | ||||
| Slide Number 23 | ||||
| Slide Number 24 | ||||
| Slide Number 25 | ||||
| HSP Entry and Submittal�Methods of HUB Compliance | 100% HUB Participation � | |||
| Slide Number 27 | ||||
| Slide Number 28 | ||||
| Slide Number 29 | ||||
| Slide Number 30 | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| Slide Number 34 | ||||
| Slide Number 35 | ||||
| Slide Number 36 | ||||
| Slide Number 37 | ||||
| Slide Number 38 | ||||
| Slide Number 39 | ||||
| Slide Number 40 | ||||
| Slide Number 41 | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | 100% HUB Participation � | |||
| Method of HUB Compliance �Meet the Goal | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| HSP Entry and Submittal�Methods of HUB Compliance | Meet the Goal | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| Slide Number 57 | ||||
| Slide Number 58 | ||||
| Slide Number 59 | ||||
| Slide Number 60 | ||||
| Slide Number 61 | ||||
| Slide Number 62 | ||||
| Slide Number 63 | ||||
| Slide Number 64 | ||||
| Slide Number 65 | ||||
| Slide Number 66 | ||||
| Slide Number 67 | ||||
| Slide Number 68 | ||||
| Slide Number 69 | ||||
| Slide Number 70 | ||||
| Slide Number 71 | ||||
| Slide Number 72 | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | Meet the Goal � | |||
| Method of HUB Compliance �Good Faith Effort�(GFE)Solicitation | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | Good Faith Effort (GFE) Solicitation � | |||
| Slide Number 76 | ||||
| Slide Number 77 | ||||
| Slide Number 78 | ||||
| Slide Number 79 | ||||
| Slide Number 80 | ||||
| Slide Number 81 | ||||
| Slide Number 82 | ||||
| Slide Number 83 | ||||
| Slide Number 84 | ||||
| Slide Number 85 | ||||
| Slide Number 86 | ||||
| Slide Number 87 | ||||
| Slide Number 88 | ||||
| Slide Number 89 | ||||
| Slide Number 90 | ||||
| Slide Number 91 | ||||
| Slide Number 92 | ||||
| Slide Number 93 | ||||
| Slide Number 94 | ||||
| Slide Number 95 | ||||
| Slide Number 96 | ||||
| Slide Number 97 | ||||
| Slide Number 98 | ||||
| Slide Number 99 | ||||
| Slide Number 100 | ||||
| Slide Number 101 | ||||
| Slide Number 102 | ||||
| Slide Number 103 | ||||
| Slide Number 104 | ||||
| Slide Number 105 | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | Good Faith Effort (GFE) Solicitation � | |||
| Method of HUB Compliance �Self-Performing | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | Self-Performing� | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Self-Performing� | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Self-Performing� | |||
| HSP Entry and Submittal�Methods of HUB Compliance- | Self-Performing� | |||
| Slide Number 112 | ||||
| Slide Number 113 | ||||
| Slide Number 114 | ||||
| HSP Entry and Submittal�Methods of HUB Compliance- | Self Performing � | |||
| Slide Number 116 | ||||
| Slide Number 117 | ||||
| Slide Number 118 | ||||
| Slide Number 119 | ||||
| Common Error Messages | ||||
| Slide Number 121 | ||||
| Slide Number 122 |
File details come from the government source that posted it. Updated .