ESBD_576108_1794597894734_7 - Final solicitation.pdf
PDF 189 KB Posted
- Solicitation number
- 910-27-287-00-S-AB-CSP
- Issued by
- Travis County, Austin City, Texas
About this file
Solicitation Summary
This is a Competitive Sealed Proposal (CSP) solicitation issued by Austin Community College (ACC) District for restroom renovations at the Northridge Campus in Austin, Texas. The project involves comprehensive renovations of eight restrooms across two buildings: three existing restrooms in Building 1000 and four existing restrooms in Building 2000, plus the conversion of one office space into an accessible single-user gender-neutral restroom in Building 2000. The scope includes plumbing fixture replacements, accessibility modifications compliant with the Americans with Disabilities Act (ADA) and Texas Accessibility Standards (TAS), electrical and HVAC upgrades, automatic door operators, ceiling and lighting repairs, and new toilet partitions and accessories. The project is divided into three construction phases, with Phase 1 addressing water submeter and isolation valve installations, Phase 2 focusing on second-floor work, and Phase 3 completing first-floor work. The solicitation was released on November 12, 2026, with a mandatory bidders' conference and optional site visit scheduled for November 30, 2026, at 9:00 a.m. and 10:00 a.m. CST, respectively. The deadline for submitting written questions is December 1, 2026, at 12:00 p.m. CST, with responses issued by December 3, 2026. Proposals are due December 10, 2026, at 12:00 p.m. CST, followed by a public reading at 1:15 p.m. CST that same day. Board approval is anticipated for February 1, 2027, with contract award on March 5, 2027, and an anticipated contract start date of March 8, 2027. The Notice to Proceed is expected March 11, 2027, field mobilization on April 8, 2027, with substantial completion required by July 28, 2027, and final completion by August 25, 2027.
The estimated construction budget is $990,000, with ACC evaluating proposals based on total cost (25%), past performance and experience (25%), project plan and construction schedule (25%), personnel qualifications (10%), safety record (10%), and business organization and litigation history (5%). The general contractor must include a 10 percent construction allowance as a separate line item to address unforeseen conditions. ACC will retain 5 percent of progress payments as retainage until substantial completion, with final payment upon full performance. Liquidated damages apply for delays: $500 per calendar day for substantial completion delays, $750 per affected building per day for loss of restroom service, and $2,000 per affected building per day for building closure or loss of occupancy. The respondent must provide general liability insurance with a $2,000,000 aggregate and $1,000,000 per occurrence, workers' compensation insurance, and a performance bond. ACC's Small Business Development Program (SBDP) participation goal is 30 percent or greater, with respondents receiving up to 10 percentage points for SLBE participation; the solicitation does not establish a mandatory set-aside. The general contractor must maintain required restroom availability throughout occupied campus operations, implement strict phasing and construction scheduling approved by ACC's Campus Planning, Construction, and Sustainability department, provide equipment for material transfers and a dedicated dumpster with haul-away services, adhere to Austin's Construction and Demolition Recycling Ordinance, and ensure all workers obtain OSHA 10-hour training certification with project managers and superintendents possessing OSHA 30-hour certification. One-year warranties on contractor-furnished materials and workmanship apply from the date of final acceptance, with the contractor participating in a ten-month warranty walk.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Northridge Campus (NRG) Restroom Renovations for Buildings 1000 and 2000 - #910-27-287-00-S-
AB-CSP
ARTICLE 1 – GENERAL OVERVIEW AND EXECUTIVE SUMMARY
AUSTIN COMMUNITY COLLEGE (ACC) DISTRICT is soliciting Competitive Sealed Proposals (CSP) from qualified and interested firms for restroom renovations within Buildings 1000 and 2000 at the Northridge Campus in accordance with Northridge Campus (NRG) Restroom Renovations for Buildings 1000 and 2000 #910-27-287-00-S-AB-CSP.
ACC Administration is responsible for the following responsibilities with respect to the selection of service providers for the proposed services:
• Serve as the primary/first contact with all external professionals who may be contracted for these projects;
• Develop and publicize scope of solicitation and evaluation criteria for selection of restroom renovation services at the Northridge Campus (NRG);
• Submit rankings of respondents to the solicitation evaluation committee for evaluation selection and approval; and,
• Serve as contact and in oversight role throughout the procurement process.
Selection Process – The CSP is a one-step process for selecting a qualified firm for:
• Northridge Campus (NRG) Restroom Renovations for Buildings 1000 and 2000
ARTICLE 1.1 Authority
ACC is soliciting the proposed services listed herein under Texas Education Code, Chapter 44, Subchapter B, Section 44.031(f), Texas Government Code Chapter 469, and ACC’s Board Policy CF (Local).
ARTICLE 1.2 College Information
The Austin Community College District (ACC) is a public community college system serving the Austin, Texas, metropolitan area and surrounding Central Texas communities. ACC was founded in 1972 as part of the Austin Independent School District and began offering classes in fall semester 1973. ACC is one of the largest community college systems in Texas and in the United States. The college maintains 11 campuses, 2 centers, and distance learning options to serve about 70,000 students annually in academic, workforce, continuing education and adult education programs. ACC offers associate degrees and career/technical certificate programs in more than 100 areas of study as well as four bachelor’s degree programs. Most courses taken within the District are meant to apply to associate degrees, which help students qualify for jobs or can be transferred to four-year institutions. The College’s legislatively designated service area encompasses six counties: Bastrop, Blanco, Caldwell, Hays, Travis, and Williamson.
The College is primarily supported by ad valorem taxes, tuition and state appropriations. ACC’s website is at http://www.austincc.edu.
Historical and demographic information about ACC can be viewed by accessing the link below to the ACC Fact Book: https://oira.austincc.edu/data-and-reports/factbook/.
ARTICLE 1.3 Point of Contact Information http://www.austincc.edu/ https://oira.austincc.edu/data-and-reports/factbook/
All requests, questions or other communication about this solicitation shall be made in writing to the ACC Procure to Pay (P2P) Department addressed to person listed below:
• Name: Anthony Barron
• Title: Buyer, ACC P2P Department
• Address: 6101 Highland Campus Drive, Austin, TX 78752
• Phone: (512) 223-1039
• E-Mail: anthony.barron@austincc.edu
ARTICLE 1.4 Prohibited Communication
On issuance of this solicitation, except for the written questions and requests for clarification described in the solicitation, ACC, its representative(s), or partners will not answer any questions or otherwise discuss the contents of this solicitation with any potential respondents or their representative(s).
Attempts by potential respondents to ask questions by phone, email, or in person of other representatives other than the point of contact for this solicitation will not be allowed or recognized as valid. Respondents shall rely only on written statements issued by or through the College's designated staff as provided in this solicitation.
Prohibited communication includes any attempts to contact or notify any ACC agent (Reference “Exhibit C-1of 2: Affidavit Prohibited Activities”) during the procurement process and prior to award of the resulting contract.
This restriction does not preclude discussions between affected parties to conduct business unrelated to this solicitation.
Failure to comply with these requirements may result in disqualification of respondent's proposal.
ARTICLE 1.5 Clarifications
Respondents must notify the Point of Contact of any ambiguity, conflict, discrepancy, exclusionary specifications, omission or other error in the solicitation in the manner and by the deadline for submitting questions.
If a respondent fails to timely and adequately notify the point of contact of such issues, the respondent submits its proposals at its own risk, and if awarded a contract:
1. shall have waived any claim of error or ambiguity in the solicitation and any resulting contract,
2. shall not contest the interpretation by the College of such provision(s), and,
3. shall not be entitled to additional compensation, relief, or time by reason of ambiguity, error, or later correction.
ARTICLE 1.6 Questions and Responses
Questions or comments concerning this solicitation must be submitted in writing to the ACC’s Point of Contact, by no later than the date and time indicated in Procurement Schedule of Events.
Responses to questions or other written requests for clarification will be communicated via an addendum, or via Workday Strategic Sourcing (WSS) “Message Center”, as applicable. ACC reserves the right to amend answers before the deadline of the solicitation’s responses. It is the respondent's responsibility to contact the Point of Contact for updated responses.
mailto:anthony.barron@austincc.edu
ACC also reserves the right to determine or decline to answer any question or questions or to provide a single consolidated response of all matters they choose to respond in any manner at the sole discretion of the College. If ACC, in its sole discretion, determines that questions necessitate a change to this solicitation, the change will be reduced to writing in the form of an addendum, or via Workday Strategic Sourcing (WSS) “Message Center”, as applicable.
ARTICLE 1.7 Procurement Schedule
The following table documents the critical pre-award events for the solicitation:
Event Dates Solicitation Release Date November 12, 2026 ACC will be CLOSED for Thanksgiving Break November 25-27, 2026 Solicitation Conference: 9:00 a.m., CST November 30, 2026 Site Visit immediately following Solicitation Conference: 10:00 a.m., CST
November 30, 2026
Deadline for Questions: 12:00 p.m., CST December 1, 2026 Issuance of Addendum, or via Workday Strategic Sourcing (WSS) “Message Center”, as applicable.
December 3, 2026
Withdrawal of Solicitation (Same date as the due date/closing): 12:00 p.m., CST
December 10, 2026
Solicitation Response Due Date/Closing Date: 12:00 p.m., CST December 10, 2026 Public Reading of Proposals Received: 1:15 p.m., CST December 10, 2026 ACC will be CLOSED for Winter Break December 23, 2026 –
January 1, 2027 Board of Trustees (BOT) Approval February 1, 2027 Contract Award March 5, 2027 Anticipated Contract Start Date March 8, 2027
Note: The dates identified are a tentative schedule of events. ACC reserves the right to modify these dates at any time upon notice and at the discretion of ACC, which will be posted to its website, via addenda.
ARTICLE 1.8 Solicitation Conference
ACC will host an optional Solicitation Conference on Monday, November 30, 2026 at the following time and location:
• 9:00 a.m., CST
• Room #2119 of Building 2000, 11928 Stonehollow Drive, Austin, Texas 78758.
Reference “Exhibit D – ACC Campus Maps – Northridge Campus (NRG)” for building and parking directions.
Respondents may email questions for the conference to the Point of Contact (Reference ARTICLE
1.3 Point of Contact Information) no later than five (5) days before the conference. ACC will allow respondents to submit written questions at the conference.
People with disabilities who wish to attend the meeting and require auxiliary aids or services should contact the sole point of contact identified in the solicitation at least 72 hours before the meeting so appropriate arrangements can be made.
ACC will attempt to respond to questions at the conference, but responses are not official until posted in the official format on ACC’s website. ACC reserves the right to amend answers before the proposal submission deadline.
ARTICLE 1.9 Site Visit
Immediately following the solicitation conference, ACC will host a site visit in regards to this project on Monday, November 30, 2026 at the following time:
• 10:00 a.m., CST
• Room #2119 of Building 2000, 11928 Stonehollow Drive, Austin, Texas 78758 (starting point for walkthrough of both buildings).
All interested and potential respondents are highly encouraged to attend both the optional solicitation conference and the site visit that will immediately follow, to ensure the successful submission of proposals that meet all requirements of the solicitation, specifications, and drawing. Reference “Exhibit D – ACC Campus Maps – Northridge Campus (NRG)” for building and parking directions.
ARTICLE 2 – PROJECT OVERVIEW
ARTICLE 2.1 Mission Statement and Objective
The primary mission of ACC’s P2P Department is to acquire the highest quality of goods and services in a timely manner that provides the best value to ACC, and to assure that the procurement function is conducted for effective college operations and in accordance with applicable Federal and State laws, and ACC policies.
ARTICLE 2.2 Mission Objectives
ACC’s objective of this solicitation is to award one (1) contract with a professional and qualified General Contractor (GC) firm to renovate three (3) existing restrooms within Northridge Campus Building 1000; four (4) existing restrooms within Building 2000; and the conversion of one (1) selected office space into an accessible single-user gender-neutral restroom in Building 2000. The total number of all restrooms is eight (8). This project will improve accessibility, provide compliance for the Americans with Disabilities Act (ADA) and the Texas Accessibility Standards (TAS), and ensure statutory compliance with the Texas Senate Bill 8 (SB8) 2025 requirements.
ARTICLE 2.3 Description of Services/Scope of Work (SOW)/Specifications
The proposed restroom renovations project originated as part of a larger ACC effort to correct existing restrooms that did not meet current accessibility requirements. The current design has been re-evaluated to minimize unnecessary demolition and fixture relocation, while correcting accessibility deficiencies and replacing aging or non-compliant components. Existing fixtures and finishes will be retained where practical, with localized modifications and patching, rather than complete restroom refinishing where permitted by the entire scope of this solicitation, addenda, and including all Contract Documents; (Reference Exhibits “H-1 – ACC Northridge Renovation – Specifications” and “H- 2 – ACC Northridge Renovation – 100% Construction Documents”).
ARTICLE 2.3.1 Modification and Replacement Requirements
The modifications and replacements must include, but are not limited to, plumbing fixtures, restroom accessories, isolation valves, hardwired sensor faucets, manual dual-flush valves, and trough-style lavatories where indicated.
Additional modifications and replacements must also include any electrical, ceiling, lighting, mechanical, and heating, ventilation, and air conditioning (HVAC) modifications required to support the restroom renovations.
ARTICLE 2.3.2 Accessibility Requirements
Accessibility improvements must include, but are not limited to, door modifications, automatic door operators, restroom vestibule modifications, and all related hardware associated with these improvements. New installations will be required for toilet partitions, hand dryers, signage, tile, and finish repairs.
ARTICLE 2.3.3 Occupied Building and Restroom Availability Requirements
The phasing and coordination of construction within these occupied campus buildings must maintain adequate restroom availability and minimize disruption to the NRG Campus’ normal daily operations, which are as follows:
• Monday – Friday: 7:00 a.m. – 10:00 p.m., CST
• Saturday: 7:30 a.m. – 6:00 p.m., CST
• Sunday: Closed
• College-wide Closure for Spring Break: March 15-21, 2027
• College-wide Closure for Memorial Day: May 31, 2027
• College-wide Closure for Juneteenth: June 18-19, 2027
• College-wide Closure for Independence Day: July 4-5, 2027
Any proposed changes by the selected/awarded General Contractor (GC) firm must be presented to, and approved by, ACC’s Campus Planning, Construction, and Sustainability (CPCS) designated Project Manager.
ARTICLE 2.3.4 Construction Phase Requirements
The selected/awarded GC firm shall implement the phasing shown on Sheet G0.03 (Reference “Exhibit H-2 - ACC Northridge Renovation - 100% Construction Documents”), and construction phasing must follow the order listed below:
1. Phase 1 must begin with the water submeter and isolation valve installations necessary to support construction by floor;
2. Phase 2 will follow with the second-floor restroom work; and,
3. Phase 3 will address all of the remaining first floor work.
Any proposed changes to this sequence requires review by ACC and the Architect prior to implementation. The selected/awarded GC firm shall maintain required restroom availability, accessible routes, public circulation, emergency access, and means of egress throughout the renovation. Restroom closures and alternate access arrangements require advance coordination and written approval by ACC’s CPCS Project Manager.
ARTICLE 2.4 Restroom Renovations Construction Scope Requirements
The proposed project must include, but is not limited to, the following:
ARTICLE 2.4.1 Building 1000
1. Renovation of the existing first and second-floor restroom areas shown in the contract documents.
2. Accessibility modifications and fixture adjustments or replacements.
3. New toilet partitions, restroom accessories, hand dryers, faucets, and related improvements.
4. Plumbing modifications and new isolation valves to support the renovated restroom groups.
5. Ceiling, lighting, and finish repairs associated with the renovation.
ARTICLE 2.4.2 Building 2000
1. Renovation of the existing first and second-floor restroom areas shown in the contract documents.
2. Accessibility modifications and fixture adjustments or replacements.
3. Removal of approved redundant interior vestibule doors while maintaining required corridor facing rated doors.
4. Repair and replacement of automatic door operators as indicated.
5. Construction of a new accessible single-user restroom within existing Room 2132, with the remaining area to be maintained for storage.
6. Plumbing modifications, new isolation valves, and replacement of deteriorated exterior building shutoff valves as indicated.
7. Ceiling, lighting, and finish repairs associated with the renovation.
ARTICLE 2.4.3 Plumbing Construction Requirements
Plumbing infrastructure work includes isolation valves, exterior building shutoff valve modifications or replacement where indicated, water submeters, meter vaults, freeze protection heat tracing, and associated excavation, electrical power, raceways, controls connections, and restoration. Water submeters shall be integrated with the existing building automation system as required by the contract documents.
The selected/awarded GC firm shall field verify existing utility locations, pipe sizes, and installation conditions before ordering the affected equipment or commencing related work. Existing valves or utilities encountered during construction shall be brought to ACC’s CPCS Project Manager’s attention before removal or abandonment.
ARTICLE 2.4.4 Scheduling, Plan, and Phase Requirements
Before beginning field work, the selected/awarded GC firm must submit a construction schedule, phasing plan, and logistics plan identifying all work areas, temporary barriers, available restroom facilities, pedestrian routes, material deliveries, storage, waste removal, and anticipated utility interruptions.
Plumbing shutdowns, work beneath the second-floor slabs affecting occupied first floor areas, and activities generating excessive noise, dust, vibration, or other disruptions shall be scheduled during approved after hours, weekend, holiday, or other low-impact periods as required by the contract documents, and as coordinated with ACC’s CPCS Project Manager. The proposal must include all labor, supervision, temporary protection, and other costs necessary to perform the published scope under these occupied campus and phasing requirements.
All design and construction phases must adhere to the established guidelines, including code reviews, design documentation, construction planning, and ACC’s Design Guidelines and Construction Standards to ensure quality and compliance; (Reference “Exhibit K - ACC's Design Guidelines and Construction Standards”). All respondents must review the entirety of this solicitation including the complete drawings; (Reference “Exhibit H-2 - ACC Northridge Renovation - 100% Construction Documents”) for specifications and reference.
The estimated construction budget is $990,000.
ARTICLE 2.5 Project Start and Completion Dates
After contract award, the selected/awarded GC firm shall commence the Work on the date stated in ACC's written Notice to Proceed (NTP). Contract award does not authorize site mobilization, utility interruption or construction.
The anticipated dates are as follows:
• Notice to Proceed: March 11, 2027.
• Field Mobilization: April 8, 2027.
• Substantial Completion must be achieved by July 28, 2027.
• Final Completion must be achieved by August 25, 2027.
Extensions shall be governed by the Contract. If the project is not completed within the specified timeframe, the selected/awarded GC firm will be subjected to payment of liquidated damages (Reference ARTICLE 2.6), for each day which the project is not completed.
ARTICLE 2.6 Liquated Damages (LDs)
Time is of the essence in achieving Substantial Completion and maintaining the required utility service, restroom availability, and building occupancy during construction. ACC's actual damages for delay(s) caused by the awarded respondent's failure to timely complete the project are difficult, if not impossible, to measure at the time of entering into contract. The following amounts are stipulated compensation for the identified categories of loss, subject to the allocation and credit provisions below, and are not penalties:
• Overall Substantial Completion delay: $500 per calendar day;
• Loss of required restroom service: $750 per affected building, per calendar day equivalent;
and,
• Building closure or loss of occupancy: $2,000 per affected building, per calendar day equivalent.
ACC has calculated these amounts at a reasonable estimate of such LDs the awarded respondent's unexcused delay in achieving substantial completion by the Substantial Completion date, and will be used as the measure of damages unless the awarded respondent and ACC agree on a different amount, in advance, and in writing. When, applicable, LDs may be deducted from the awarded respondent’s invoice, including any retainage. The executed AIA Contract Documents will set forth the procedures for assessing the liquidated damages identified in this Article, including when assessments begin and end, how overlapping assessments and credits are handled, and what notice is required.
ARTICLE 2.6.1 Operational Assessment Periods and Partial Days
A calendar day equivalent means 24 affected hours. Operational LDs accrue only during published scheduled campus operating periods or other occupancy periods identified in writing before the affected work is authorized, including scheduled classes, events and staff occupancy. For each affected building, calculate the assessment as the applicable daily rate multiplied by affected operating hours divided by 24, prorated to the minute and rounded to cents only after calculation. The hourly equivalents are $32 for restroom service disruption and $84 for building closure.
Non-operating hours and periods within an approved shutdown window are excluded from operational LDs. A condition continuing into the next scheduled operating period resumes accrual when that operating period begins.
The selected/awarded GC firm shall immediately notify ACC’s CPCS designated Project Manager of any actual or anticipated service failure, shutdown overrun, unsafe sanitary condition or loss of occupancy;
promptly implement protective and corrective action; and maintain contemporaneous records of the cause, affected facilities, operating periods, response and restoration.
ARTICLE 2.7 Respondent/General Contractor (GC) Requirements
All respondents or the selected/awarded GC firm must ensure they are compliant with the following requirements and maintain compliance for the duration of the project:
1. Provide any equipment required to transfer equipment from delivery trucks to the NRG buildings. This includes, but is not limited to a forklift, pallet jacks, bobcat, crane, etc. or any other type of moving equipment.
2. Provide a dedicated dumpster to collect trash generated by the construction work. The dedicated dumpster must include all haul-away services. ACC does not allow construction trash to be dumped into its existing dumpsters, which are only designated for building occupant usage.
3. Adhere to the ACC Energy & Sustainability Department’s commitment to the City of Austin’s Construction and Demolition (C&D) Recycling Ordinance; (Reference “Exhibit I - Construction and Demolition (C&D) Waste Management and Recycling”).
4. Provide GC’s own office/trailer, as the campus space is extremely limited.
5. Maintain standard working hours between 7:00 a.m., to 5:00 p.m., CST, Monday through
Friday. Saturday work may be allowed if approved by ACC’s CPCS designated Project Manager, upon request and in advance. ACC must have a designated person present at all times on-site while the selected/awarded GC firm has construction workers on the premises.
6. Maintain at least one (1) operational restroom designated for each gender in each building throughout scheduled campus operations. Maintain applicable minimum fixture capacity for the occupancy served, accessible restroom facilities and routes, public circulation and required emergency egress. These obligations apply throughout the renovation, including Phases II and III, and shall not be satisfied solely by maintaining a nominal restroom count.
7. Obtain written authorization from ACC’s CPCS designated Project Manager prior to each restroom closure. Do not close the next restroom group until the facilities needed to support that closure are operational, compliant and confirmed as available for use. Approval of a phasing plan does not authorize a reduction below the required service level.
8. Submit each planned utility shutdown request at least ten (10) business days before the proposed shutdown, unless ACC’s CPCS designated Project Manager authorizes a shorter period in writing. Identify the affected systems and buildings, exact shutdown and restoration times, field verification, materials and personnel readiness, testing and flushing requirements, required approvals, contingency measures and emergency contacts. ACC’s approval is required before any service interruption. Coordinate the operation of existing ACC valves with authorized ACC personnel.
9. Control dust, noise, odors, sewage exposure, debris and utility interruptions so occupied areas remain safe and available for scheduled use. Maintain sanitary drainage protection and temporary connections as needed. Stop the activity causing an unsafe condition and immediately protect occupants, contain the condition and promptly coordinate corrective measures with ACC’s CPCS designated Project Manager or ACC representative.
10. Coordinate inspections with ACC’s CPCS designated Project Manager or ACC's designated representative once work is deemed substantially complete by the awarded respondent. ACC will perform inspections with its in-house mechanical, electrical, and plumbing representatives in coordination with ACC's Campus Planning, Construction, and Sustainability department, prior to the acceptance and designation of work being deemed substantially complete. Punch lists will be generated by ACC's designated representative, and the awarded respondent must address and correct all punch list items prior to the final acceptance by ACC and prior to the project close out.
11. Provide, whenever possible, materials that are purchased within the state of Texas sales tax free. Austin Community College District (ACC) is an entity of the State of Texas, and is, therefore, exempt from state sales tax. The necessary tax exemption forms will be provided to the selected/awarded GC firm upon request.
12. Review and comply with ACC’s construction safety manual (to be provided by ACC’s designated CPCS Project Manager or ACC representative in advance of the start of renovation work).
ARTICLE 2.8 Construction Schedule Requirements
The selected/awarded General Contractor (GC) firm will create a construction schedule outlining how work will be organized on the occupied campus, including plans for managing construction pathways.
ACC’s Campus Operations and Management teams will review and approve, in writing, all proposed schedule before work begins. All building occupants must receive advance notice of any access disruptions, whenever applicable.
The schedule must incorporate the Phase I, II and III sequence shown on G0.03 (Reference “Exhibit H-2 - ACC Northridge Renovation - 100% Construction Documents”). The schedule must provide the following details, which must include the following:
1. Identify all work per building, per floor, and per restroom.
2. Provide details for all procurements including submittal schedule; valve and meter installation;
shutdown windows; demolition, construction, testing, inspections, and anticipated restroom reopening dates.
3. Include Critical path Milestones (CPM) for all phases through Substantial Completion and Final Completion. Show dependencies that preserve sufficient compliant restroom service and circulation before subsequent areas close.
4. The selected/awarded GC firm shall provide an updated schedule on a weekly basis, and a rolling three week look-ahead basis to clearly identify upcoming shutdowns, closures, disruptive activities, inspections and restoration dates.
5. Changed work sequences or closures require renewed ACC’s designated CPCS Project Manager or ACC representative approval before implementation. The approved schedule and updates do not revise the contractual completion deadline or relieve the selected/awarded GC firm of its operational obligations.
ARTICLE 2.9 Schedule of Values (SOV) Requirements
The selected/awarded GC firm will submit to ACC's designated CPCS Project Manager a Schedule of Values allocated to the various portions of the work. The awarded GC firm must make this submittal within ten (10) days of the Notice to Proceed and no later than twenty (20) days prior to the first application for payment. The SOV must track the Construction Schedule.
The awarded GC firm will correlate line items in the SOV with other required administrative forms and schedules, including the following:
• Application for payment forms with continuation sheets; and,
• Awardee to submit the Construction Schedule along with the request for progress payment once per month.
The awarded GC firm must provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of application for payment and progress reports. Also, the GC firm must provide several line items for principal subcontract amounts, where appropriate.
ARTICLE 2.10 Meeting Requirements
At a minimum, the selected/awarded GC firm must schedule the following required meetings for the project, which must be coordinated through and approved by ACC's designated CPCS Project Manager:
• Kick-off Meeting;
• Pre-Construction Meeting;
• Coordination Meeting;
• Progress Meetings (weekly);
• Punch-Out Walk Through Meeting; and,
• Continued Owner-Architect-Contractor (OAC) Meetings through closeout.
ARTICLE 2.11 Safety Certification Requirements
The selected/awarded GC firm must review information regarding hazardous materials and requirements for safe handling with ACC's designated CPCS Project Manager and ACC's Safety and Emergency Management (SEM) team.
• Occupational Safety and Health Administration (OSHA) 30-hour Training: All Superintendents and project managers (PMs) for the awarded respondent must submit proof of completion of OSHA 30-hour Training (certificate) to ACC's designated representative(s), ACC's Project Manager (PM), and ACC's Construction Manager (CM) prior to being assigned to an ACC Project.
• Occupational Safety and Health Administration (OSHA) 10-hour Training: All workers on the project must have a minimum OSHA 10-hour Training (card) prior to being assigned to an ACC Project.
At a minimum, hard hats, safety shoes, safety vests, and safety goggles are required at all times while on the job site.
ARTICLE 2.12 Warranty Requirements
As applicable, unless otherwise agreed in writing prior to the award, the respondent’s warranty against defects in contractor furnished material and workmanship shall be for one (1) year from the date of execution of the contract awardee’s “Final Acceptance Form.” All respondents, and the selected/awarded GC firm, must ensure the warranty requirements are applicable to the following items and components for the Northridge restroom renovation. Complete repair or full replacement of all hardware faults resulting from a product defect on a back to supplier basis must be included in the product warranty.
The selected/awarded GC firm must participate in a ten-month-warranty walk, and warranty deficiencies shall be corrected by the awarded respondent at no additional cost to ACC. Manufacturer warranties exceeding the awarded respondent warranty shall be transferred to ACC as part of the project closeout documents.
ARTICLE 2.13 Extended Warranty and Maintenance Service Agreement
All respondents are requested, if applicable, to provide information regarding additional or extended warranty and/or maintenance agreements that would be applicable to the Northridge Restroom Renovation. Respondents are requested to identify and list costs of additional warranty and/or maintenance agreements on the WSS price sheet with the respondent's proposal submission. ACC will consider the cost of the extended warranty option in determining overall best value to the College.
ARTICLE 2.14 Retainage
Until Substantial Completion, ACC will pay 95% of the amount due to the awarded contractor on account of progress payments, but will retain five percent (5%) of the original amount. The final 5% retainage fee shall be due upon full performance of the proposal.
ARTICLE 2.15 Owner Controlled Contingency/Allowances
The contractor will allocate a ten percent (10%) construction allowance (as based on the cost of construction including General Conditions), in order to address unforeseen existing conditions and other scope changes as encountered during the course of construction. The 10% contingency/allowance must be included as a separate line item on the pricing response sheet;
(Reference “Exhibit J – Pricing Response Sheet” and ARTICLE 2.16 All Elements of Costs for the Proposed Good).
ARTICLE 2.16 All Elements of Costs for the Proposed Goods
The cost of the proposed goods and services and all elements of cost offered by all respondents must include, but is not limited to, the initial warranty, delivery, and installation related to the proposed services offered. All proposed costs will be considered by ACC in determining the overall best value selection for contract award. All respondents must submit the Excel Version of "Exhibit J - Pricing Response Sheet" with their submission.
ARTICLE 3 – SMALL LOCAL BUSINESS ENTERPRISES
ARTICLE 3.1 Small Business Development Program (SBDP)
The Small Business Development Program (SBDP) was established to provide a race- and gender-neutral program for the College to utilize in its efforts to ensure that all segments of its local business community have a reasonable and significant opportunity to participate in contracts.
According to ACC’s Board Policy CF (Local), ACC is committed to maximizing the vitality and robustness of the economy of the College’s service area through enhanced opportunities for the utilization of Small Local Business Enterprises (SLBE) as defined within the SBDP.
Respondents may contact the SBDP Office at SBDP@austincc.edu for assistance or clarification with issues specifically related to ACC Policy, the completion of SLBE forms and related reports, by the terms of the contract, and/or by ACC Policy (Reference “Exhibit B-1 – Small Business Development Program (SBDP) Cover Page). The suppliers’ plan will be reviewed to assess the strength of proposed SLBE participation on the respondent’s team and to ensure compliance with SBDP by other firms performing on a project under the respondent’s supervision.
ARTICLE 3.2 SLBE Participation
To confirm the best characterization of your firm, all respondents must complete Exhibit B-1 in Workday Strategic Sourcing (WSS) that confirms their eligibility as a certified SLBE within ACC's taxing district or a Veteran Heroes United in Business (VetHUB).
The respondent is required to use its best efforts to assist ACC in achieving this objective by providing maximum opportunities for SLBEs to participate on its team(s) and by using its best efforts to encourage the use of SLBEs by other suppliers and subcontractors whenever possible. Suppliers are required to provide a plan describing their actions to utilize SLBEs in all phases of the contract by completing Exhibit B-2 in WSS.
The maximum percentage points that can be awarded to a respondent for SLBE participation is ten (10) percentage points. SLBE percentage points are awarded proportionally to the percentage of the contract that will be performed by the SLBE firms (or subcontractors, as applicable).
During the term of the contract, ACC shall regularly monitor SLBE participation to determine if it continues to meet or exceed the provisions specified in the contract. If the selected supplier is deemed not to have made a good faith effort to comply with the requirements of the original solicitation. ACC shall report nonperformance relative to its contracts to the Comptroller per its vendor performance tracking system (VPTS) of the Texas Government Code, Section 2262.055.
ARTICLE 4 – AWARD OF CONTRACT
mailto:SBDP@austincc.edu
ACC intends to award one (1) contract to the qualified firm whose proposal, conforming to the conditions and requirements of the solicitation, is determined to offer the best value to ACC. The award shall not be made upon the opening of proposals but at a time as soon thereafter as may be necessary to evaluate proposals and to obtain Board of Trustee authorization, if required. The provisions, terms, and conditions of this solicitation shall become a part of any subsequent contractual documents. Failure of the successful respondents to accept this obligation may result in the cancellation of any recommendation to award.
Notwithstanding the above, this solicitation does not commit ACC to contract for any requirements detailed in this document.
ARTICLE 4.1 Contract Elements
The term "contract" or "Construction Contract" means the contract awarded as a result of negotiations as identified in this solicitation and all exhibits thereto. At a minimum, the following documents will be incorporated into the contract:
• this solicitation and all attachments and exhibits;
• any modifications, addendum, or amendments issued in conjunction with this solicitation;
• ACC's Term and Conditions; and,
• the successful respondent's proposal.
The resulting contract will be documented in the AIA Construction and Contract templates (reference Exhibit F-1 - AIA Document A101-2017) with the general conditions of the contract for construction and related terms and conditions.
ARTICLE 4.1.1 Disclosure of Interested Parties – Texas Ethics Commission (TEC) Form 1295
All respondents must complete the Form 1295 Certificate of Interested Parties which is located on the TEC website https://www.ethics.state.tx.us/filinginfo/1295/ for certain contracts with a value of $1 million or more, that require an action or vote by a governing body, or are for services that would require a person to register as a lobbyist under Chapter 305 of the Texas Government Code. Before contract award, the supplier must submit to Austin Community College District (ACC) a completed and signed form with the certificate number and date.
Respondents are required to acknowledge the requirement for Disclosure of Interested Parties – Texas Ethics Commission Form 1295 with their solicitation response to Austin Community College District (ACC).
ARTICLE 5 – BUSINES PROPOSAL
Please complete the following components of your bid submission included in this digital CSP event:
• WSS Questionnaire
• Pricing worksheet: EXHIBIT J – Pricing Response Sheet - Excel Version
• Required documents:
1. Completed and signed Certification Form (Exhibit A);
2. Completed SBDP Forms (Exhibits B-1, and/or B-2), as applicable;
3. Respondent’s Affidavit of Non-Collusion (Exhibit C-1);
https://www.ethics.state.tx.us/filinginfo/1295/
4. Conflict of Interest Questionnaire (Exhibit C-2);
5. Certification of Compliance with Provisions of the Texas Government Code, Sections
2271.002 and 2274.002 (Exhibit E);
6. Proof of Insurability in accordance with ACC’s Terms and Conditions set forth in this solicitation as:
• Respondent must demonstrate they have the appropriate general liability insurance as set forth in ACC’s Terms and Conditions. Specify the bond, professional liability, or comparable insurance coverage maintained by the company. Certification of bond, when the application must be presented within ten (10) calendar days of notification.
• Respondent must show evidence of possessing Workers’ Compensation Insurance as required by law.
• Verification that the firm has completed the online Vendor Registration with ACC on their portal link: https://austincc.edu/sbdpvendor and provided supporting documentation including but not limited to IRS W-9, Request for Taxpayer Identification Number and Certification (reference www.irs.gov).
7. Provide evidence of licensure by appropriate state board, if applicable.
8. Signed Addendum/Addenda, when applicable.
ARTICLE 6 – BUSINESS PROPOSAL EVALUATION
Proposals will be evaluated in accordance with Texas Education Code, Chapter 44, Subchapter B, Section 44.031(f), associated with the proposed services (or goods), as follows:
• An evaluation committee will conduct evaluations of the submitted proposals.
• Any response that takes exception to any mandatory item(s) in this solicitations process may be rejected and not considered. Any response to the solicitation that does not include a response to all the required information may also be rejected and not considered.
• A notation of “Not applicable” or “N/A” as appropriate will be considered a valid response.
ARTICLE 6.1 Evaluation Criteria
ACC will evaluate proposals in accordance with the Texas Education Code Section 44.031(b), Texas Government Code Section 2155.074 and ACC’s best value criteria, and in determining to whom to award a contract, the district shall consider the following:
1. Total overall proposal cost (25%);
2. Quality, reliability, and successful experience of the respondents past performance for the types of projects listed above or other projects of similar size and complexity to other community colleges, institutions of higher education and other governmental and public entities, etc. (25%);
3. Specific project plan, construction schedule, and logistics plan for this renovation project (25%);
4. Personnel and Resumes: Overall qualifications of the respondents’ proposal management staff (10%);
5. Safety Record: Experience in performing construction projects in a safe manner as a General Contractor (10%); and,
6. Business Organization and Litigation (5%).
https://austincc.edu/sbdpvendor http://www.irs.gov/
If other considerations are equal, ACC will give preference to a consultant with a principal place of business in the State of Texas, or a consultant who will manage the contract from an office in Texas.
ARTICLE 6.2 SLBE Participation for Evaluations
In accordance with ACC’s Board Policy CF (Local), ACC is committed to maximizing the vitality and robustness of the economy of the District’s service area through enhanced opportunities for the utilization of SLBEs as defined within the SBDP.
ACC’s internal goal for SBDP participation is 30% or more for all its contracts. All respondents have the opportunity to participate in the SBDP by maximizing inclusion of SLBEs; and are encouraged to make a good faith effort to assist ACC in achieving this objective through providing maximum opportunities through the use of SLBEs by other vendors, suppliers, professionals, and subcontractors when possible.
In conjunction with the criteria for evaluation, in this section, respondents will have the opportunity to receive percentage points, which are allocated and based on the respondent’s submitted SLBE Participation Plan that will be considered in the selection of the best value respondent for the proposed contract services.
ARTICLE 6.3 Acceptance of Evaluation Methodology
By submitting a proposal in response to the solicitation/CSP, the respondent accepts the evaluation process and acknowledges and accepts that determination of the “most qualified” firms/respondents will require subjective judgments by the Owner.
BY SUBMITTING A RESPONSE TO THIS CSP, THE RESPONDENT (OR BIDDER) AGREES THAT
IT WAIVES ANY CLAIMS IT HAS OR MAY HAVE AGAINST ACC, ACC’S EMPLOYEES, OFFICERS,
AGENTS, REPRESENTATIVES AND MEMBERS OF ACC’S GOVERNING BODY, IN CONNECTION
WITH OR ARISING OUT OF THIS CSP INCLUDING THE ADMINISTRATION OF THE CSP, THE
BASIS FOR SELECTION, THE EVALUATION OF THE RESPONSES, THE METHOD USED FOR
SELECTION, AND ANY DISCLOSURE OF INFORMATION REGARDING THE RESPONSES OR
EVALUATIONS. THE SUBMISSION OF QUALIFICATIONS CONSTITUTES THE ACCEPTANCE BY
THE RESPONDENT OF THE EVALUATION TECHNIQUE DESCRIBED IN THIS CSP.
ARTICLE 6.4 Initial Compliance Screening
ACC will perform an initial screening of all proposals received. Unsigned proposals are subject to rejection without further evaluation. Proposals that do not include all required forms will result in automatic disqualification.
ARTICLE 6.5 Competitive Range Determinations
ACC may determine that certain proposals are within the competitive range for consideration for negotiation and possible contract award, for proposals that receive the highest or most satisfactory evaluation. ACC may, in the interest of administrative efficiency, place reasonable limits on the number of proposals that will be included in the competitive range.
ARTICLE 6.6 Oral Presentations and/or Site Visits
ACC may, at its sole discretion, request oral presentations, site visits, and/or demonstrations from one or more respondents included in the competitive range. ACC will notify selected respondents of the time and location for these activities and may supply agendas or topics for discussion. ACC reserves the right to ask additional questions during oral presentations, site visits, and/or demonstrations to clarify the scope and content of the written proposal.
The respondent’s oral presentation, site visit, and/or demonstration must substantially represent material included in the written proposal, and should not introduce new concepts or offers unless specifically requested by ACC.
ARTICLE 6.7 Best and Final Offers
ACC may, but is not required to, permit proposals to prepare one or more revised offers. For this reason, respondents are encouraged to treat their original proposal, and any revised offers requested by ACC, as best and final offers.
ARTICLE 6.8 Clarifications with Respondents
ACC may, but is not required to, conduct clarifications with all, some, or none of the respondents included in the competitive range for the purpose of obtaining the best value for ACC. ACC may conduct clarification for the purpose of:
• clarifying proposal’s ambiguities;
• requesting modifications to a proposal; and/or
• obtaining a best and final offer.
ACC may make an award that represents the best value to the College.
ARTICLE 7 – INSURANCE AND BOND REQUIREMENTS
Successful contractor shall procure and maintain, at its own expense, the following minimum insurance coverages insuring all services, work activities, and contractual obligations undertaken in this contract. These insurance policies must be written by insurers acceptable to ACC. Insurance limits for contracts includes:
ARTICLE 7.1 General Liability Insurance
Covering all duties, services or work to be performed (under the contract); insurance will provide limits of:
• Policy aggregate $2,000,000
• Each occurrence $1,000,000
• Products/completed operations aggregate $1,000,000
• Personal injury liability $1,000,000
• Fire damage liability $50,000
• Medical payments $5,000
• Sexual Molestation noted as not excluded from coverage, limits equal to policy limits.
• Consultant/Professional Liability Insurance limits $1,000,000 occurrence/aggregate (for consultants/services).
• Automobile Liability Insurance, Combined Single Limit $500,000 or as required by law.
ARTICLE 7.2 Workers’ Compensation Insurance
Provide the statutory benefits for the State of Texas and Employer’s Liability Insurance for all contracts in the amount of:
• Bodily Injury by accident: $500,000
• Bodily Injury by Disease - each person: $500,000
• Bodily Injury by Disease - policy limit: $500,000
ARTICLE 7.3 An Original Certificate of Insurance
Must be submitted from the insurer/agent prior to the issuance of the Notice to Proceed. The insurance carriers must be acceptable to ACC, generally an AM Best A-IX or better rating. The General Liability and Automobile Liability Certificate of Insurance must name Austin Community College District as an additional insured.
All certificates, except Professional Liability, shall include a Waiver of Subrogation for coverages.
Vendors must maintain the required limits of insurance as specified in the contract. They must also inform the College of any changes in insurance carriers, policy effective dates, or agents at least 30 days prior to such change, except if the policy is canceled for non-payment of premium, in which case the notice shall be ten (10) days.
ARTICLE 7.3.1
Vendor shall submit a properly endorsed Certificate of Insurance prior to any use of ACC facilities, work performed or services provided by Vendor under this Contract. Vendor must submit the Certificate of Insurance (COI) on an annual basis to ACC’s Office of Risk Management via email at:
• accriskmgmt@austincc.edu
Insurance carriers must be acceptable to ACC, with generally an AM Best A- IX or better rating.
General Liability and Automobile Liability certificates of insurance must name Austin Community College District as additional insured. All certificates, except Professional Liability, shall include a Waiver of Subrogation for coverages in favor of Austin Community College District. Notice shall be provided to ACC of any changes in insurance carriers, policy effective dates, or agents to insurance required under this Contract at least 30 days prior to such change, except if the policy is cancelled for non-payment of premium, in which case the notice shall be 10 days.
ARTICLE 7.3.2 [When applicable]
Vendor shall carry Pollution Liability insurance with limits of $1,000,000 per occurrence and $2,000,000 aggregate.
ARTICLE 7.3.3
Vendor shall carry Errors and Omissions insurance with limits of $1,000,000 for each occurrence and $3,000,000 aggregate.
ARTICLE 7.3.4
Vendor shall carry Sexual Misconduct and Liability insurance with limits of $1,000,000 for each occurrence and $3,000,000 aggregate. [OR] Vendor shall have coverage that does not exclude Sexual Molestation coverage with limits equal to policy limits.
ARTICLE 7.4 Bonding Requirements mailto:accriskmgmt@austincc.edu
The respondent must confirm that it will obtain and maintain a performance bond during the term of the contract. The bond must comply with the requirements identified in “Exhibit G - Construction Insurance and Bond Requirements”.
ACC shall bear no financial responsibility for Contractor's insurance or bonding coverage.