About this file

This Scope of Work document outlines janitorial services requirements for UT MD Anderson's parking facilities located in the Texas Medical Center in Houston, Texas. The contractor shall provide comprehensive daily, weekly, and monthly janitorial services for seven parking garages totaling 10,483 spaces, nine surface parking lots totaling 2,272 spaces, office areas, restrooms, and elevator facilities. Services include trash removal, floor cleaning and waxing, restroom maintenance, elevator cab cleaning, stairwell maintenance, glass cleaning, and response to spills and unexpected cleaning needs, excluding power sweeping and pressure washing. The contractor must assign a full-time supervisor dedicated solely to this contract and maintain minimum staffing levels of one full-time employee per parking garage Monday through Friday between 5 a.m. and 5 p.m., with one person on Sunday from 8 a.m. to 5 p.m. All contractor personnel must undergo MD Anderson background checks, obtain identification badges, complete annual training, and adhere to tobacco-free campus policies and uniform standards. Weekly walk-through inspections with the MD Anderson Parking & Transportation representative will assess performance against an 85% or higher acceptable score standard.

Pricing shall be submitted on a fixed and locked monthly and annual basis per location using the associated Price Schedule (Rider 102), with pricing remaining firm for the initial contract term. Contractor personnel must be paid a minimum starting wage of $13 per hour, included in the overall pricing. No price increases beyond 3% annually will be considered at renewal, subject to mutual agreement. Liquidated damages apply for understaffing events exceeding three consecutive days at $100 per day per employee position, and for unsatisfactory Key Performance Indicator scores at $100 per day until corrected. The contractor is responsible for all labor, supervision, tools, equipment, supplies, and materials; may utilize MD Anderson-provided onsite office and storage space; and must arrange staff parking through MD Anderson's parking program at the current rate of $100 per access card monthly. The contractor must provide one week of paid vacation per employee annually after one year of service, included in pricing. Performance metrics include customer satisfaction ratings with an acceptable level of one complaint per location monthly, scheduled staffing coverage goal of 100%, and corrective action closure rate goal of 100%.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rider 101 – Scope of Work Parking Operations Janitorial Services

I. GENERAL INFORMATION

UT MD Anderson is seeking proposals from qualified and experienced contractors to provide janitorial services for MD Anderson owned parking facilities within the Texas Medical Center in Houston, Texas.

The selected contractor shall provide all labor, supervision, tools, equipment, necessary supplies and materials necessary to perform the janitorial services and items in all included areas specified in this Scope of Work. These areas include seven (7) parking garages totaling 10,483 parking spaces, nine (9) surface parking lots totaling 2,272 parking spaces, office space, restrooms, elevator cabs and elevator lobbies.

1. Daily, weekly and monthly janitorial services are to be performed in MD Anderson parking locations identified and listed in Exhibit A. This scope of work does not include power sweeping or pressure washing duties.

2. MD Anderson may provide Contractor with onsite office space and space for vehicles. Limited storage space will be provided for brooms, mops and janitorial supplies.

3. Contractor will be allowed to dispose of trash collected from all MD Anderson garages at a designated location. Currently, the designated location is the trash compactor at the MGA (1MC) garage.

4. Contractor may utilize passenger vehicles or street legal golf carts in the performance of the work. Any vehicles utilized must be equipped with flashing lights and appropriate signage for use while on campus and kept in serviceable and good working condition. No vehicle repairs may be done on site. MD Anderson will provide designated overnight parking for these vehicles.

5. Contractor shall perform all services using trained and skilled persons having experience performing the work required under this Agreement. The Contractor shall not permit employment of unfit persons or persons not properly skilled in tasks assigned to them. This includes specialized training with the types of floor surfaces (i.e. VCT flooring, carpet, concrete, etc.) located in MD Anderson garages and offices.

6. UT MD Anderson is a tobacco-free campus. Contractor personnel shall not use tobacco products while on MD Anderson property.

7. Contractor employees are required to wear MD Anderson-issued identification badges clearly visible on their upper torso. It is the Contractor’s responsibility to submit the application for a contractor employee identification badge through MD Anderson’s Human Resources department. ID badges will be issued at no cost to the Contractor. As part of this application, Contractor’s employees will be subject to MD Anderson’s background check as well as will be required to take the annual training provided by MD Anderson. Time will be allowed in the daily schedule to complete said training.

8. Contractor must perform all work within designated hours defined elsewhere in this Scope of Work. Contractor may not schedule staff between the hours of 5 pm and 5 am (a night crew) unless mutually agreed upon by all parties.

9. Contractor will have on-sight supervisory staff that shall inspect and have responsibility for overall janitorial operations in all garages, offices, and traffic flow areas. The supervisor identified by the contractor must be interviewed and approved by MDA management prior to beginning work under this contract.

10. The Contractor will take all reasonable precautions in accordance with sound practices to safeguard and protect MD Anderson property and will be responsible for ensuring that Contractor employees do not damage or confiscate MD Anderson property.

11. Contractor shall perform all work in a manner to minimize disruption of normal operations in all assigned areas. Each time work is completed, contractor is responsible for cleaning and removing from each area worked in, all debris, materials and equipment associated with the work performed.

12. Contractor shall not subcontract, assign, or otherwise delegate any portion of the services without prior written approval of MD Anderson.

II. WORK LOCATIONS

1. All work shall be performed at the MD Anderson parking facility sites listed below. See Exhibit A

2. Parking locations may be added or removed from the current list as needed during the term of this Agreement and costs adjusted accordingly. Rider 102 – Price Schedule will be the basis for pricing the new location(s) or reducing costs for deleted locations.

SCOPE OF WORK

1. General Cleaning of Facilities – Summarized in Exhibit B

a. All garages are to be checked twice per day, Monday – Friday (excluding MDACC Holidays) between the hours of 5 am and 5 pm. In addition, all garages are to be serviced between 8am and 5pm by one (1) attendant on Sunday. Any change to hours must be mutually agreed upon by all parties.

b. Empty and wipe down trash receptacles on all floor levels, replace liners as needed, and remove all trash and litter from the surface areas of the garage. A minimum review of all areas must occur twice daily.

c. Clean Parking Offices in Braeswood, Pressler, Mays, SCRB II and MGA daily to include, but not limited to, cleaning the interior windows, client AC vents, walls at elevator lobby waiting areas, taking out the trash, dust, sweep/mop, clean sinks, tables, spot clean carpets, clean restrooms, doors & glass. Once daily after 2:00 pm. unless otherwise agreed upon. Vacuum carpets once a week or as needed to clean spills.

d. Clean and wipe down all bollards and all revenue control equipment in the entry and exit lanes once daily.

e. Sweep all paved entrance and exit areas of the garages once daily.

f. Replenish paper towels, soap and toilet paper in restrooms as needed.

g. Wax VCT flooring once per week.

h. Clean cashier booths where applicable – empty trash, replace liners, vacuum/mop, dust/wipe furniture. Once daily. Clean outside of unused booths once a month.

i. Clean elevator cabs (in and out) on all levels (including tracks, carpet, and walls) once daily.

j. Clean (sweep/vacuum) all elevator lobbies once daily. Areas that have carpet should be vacuumed (with a standard 120-volt plug-in vacuum) once daily.

k. Stairwells – clean all steps, light fixtures, mirrors, signs, walls, handrails, doorknobs, and floor drains at a minimum of once a week. It should be noted that stairwells must be monitored throughout the day and may require cleaning several times per day.

l. Sweep/mop all stairwells once per week using a biodegradable cleaner/degreaser.

m. Removal of visible oil caused by vehicles in parking facilities as needed.

n. Cleaning of glass in the garages (primarily the garage elevator banks) once a week.

o. Cleaning of light fixtures, signs and walls in the garage once a month.

p. Dusting of overhead pipes, conduits, and garage signage once a month

q. Remove cobwebs throughout the garages as needed.

r. Respond to unexpected spills, leaks, or other cleaning as needed or requested by MD

Anderson Parking & Transportation personnel. This could include biohazard human waste.

s. Monitor garages during inclement weather and address water accumulation to prevent slips. Contractor must provide all equipment necessary to include wet floor signs, mops, squeegees and wet vacs at each garage.

t. Monitor elevator lobbies for wheelchairs, trash, and linen daily. Collect wheelchairs from lobbies or parking areas and place in designated locations as required. Linens should remain where they are. Contractor’s Supervisor will contact MD Anderson’s department of Patient Transportation (wheelchair) or Housekeeping (linen) for pickup.

u. During a weather event there may be a need to have a Contractor’s staff member remain onsite as a part of the MD Anderson Rideout Team to monitor the maintenance in our garages. Training and sleeping accommodations will be provided by MD Anderson, hourly rates for this service should be included as a separate item on the Pricing Sheet.

III. MISCELLANEOUS

1. Staffing

a. Contractor must assign a full-time Supervisor to MD Anderson to oversee the daily, weekly and monthly cleaning schedule. This person must be qualified and trained and will be designated as the Contractor’s primary contact for MD Anderson management.

Supervisor will be dedicated solely to this contract.

b. Contractor staff shall be on-site from 5 am to 5 pm, Monday-Friday (excluding MD

Anderson holidays) and from 8am to 5pm on Sunday. Weekday staffing must include, at minimum, 1 full-time employee per parking garage. Sunday staffing will be limited to one (1) person unless Contractor is directed otherwise by MD Anderson.

c. Before assigning personnel to an MD Anderson location, the Contractor shall conduct a criminal background screening appropriate to the individual’s assigned duties and anticipated access.

d. Contractor shall ensure that all personnel receive appropriate training and instruction on the safe and effective use of all equipment, tools, materials, and cleaning chemicals provided by the Contractor. Training shall be completed prior to employee assignment and refreshed as necessary to maintain compliance with applicable safety standards and manufacturer recommendations.

e. Contractor shall provide a service schedule for each facility identifying assigned staffing levels and scheduled daily, weekly or monthly tasks per the requirements detailed in Section III.1 as well as the Contractor’s staff member assigned to the location.

f. Contractor will be required to provide a staffing plan prior to the start of any work under this Scope of Work. Any additions or deletions should be approved by both parties and costs adjusted accordingly. Prior to commencement of services, Contractor shall provide the MD Anderson with a complete staff roster identifying all personnel assigned to perform work at MD Anderson facilities, including each employee’s name, assigned facility or facilities, supervisor, typical work schedule, and role. Contractor must provide updated rosters whenever staffing changes occur, upon request by MD Anderson team. Contractor is required to provide MD Anderson with the names of all employees working on-site and notify MD Anderson Management of any staffing changes (hires, terminations) within 24 hours (in writing).

g. The Contractor must enforce discipline and order among employees carrying out the services under this Agreement. Contractor is responsible to monitor the actions of its employees and will terminate employment of any employee whose conduct the Owner finds detrimental to the Institution and the public.

h. Contractor is expected to provide one-week paid vacation for each employee assigned to perform work under this contract after the employee has completed one year of service. This cost is to be included with Contractor’s pricing and not billed to MD Anderson separately. MD Anderson has the right to audit vacation time.

i. The Contractor shall perform in accordance with applicable safety rules and regulations, including but not limited to OSHA standards. The Contractor shall ensure its employees use personal protective equipment and any other required equipment in the manner and to the extent required to perform the services safely.

j. Parking for staff - Contractor can have staff park onsite. All MD Anderson parking facilities are paid parking. Contractor will be billed for all access cards for staff parking monthly on a separate invoice through MD Anderson’s Parking Department. Contractor will pay the going rate, per access card. Current rate for parking at the Fannin Holcombe Garage is $100 per access card per month.

2. Uniforms

a. Contractor must provide their staff with well-fitting and acceptably maintained uniforms as well as any required weather protection and personal protective equipment gear necessary. MD Anderson will approve the uniform prior to the commencement of the work. Uniform to include a polo style uniform shirt, hat, jacket, black pants and black shoes. MD Anderson-issued employee badges identifying the employee must be worn as part of the uniform.

b. Contractor will provide safety vests with company name on the back for all Contractor employees. Contractor’s employees will wear the safety vest over their MD Anderson-issued uniform shirt or jacket at all times while performing work under this contract.

c. Contractor’s employees are expected to adhere to MD Anderson Parking &

Transportation’s uniform policy included in Exhibit C

3. Maintenance Checklist

a. The Contractor shall develop a detailed Maintenance Checklist to be presented to MD

Anderson for approval prior to the start of work. The Maintenance Checklist shall outline each duty and frequency (daily, weekly, monthly, quarterly, etc.). It is not intended to be a final comprehensive list but rather a guide that will be adjusted with mutual agreement by the Contractor and MD Anderson.

b. Upon request, the Contractor must be able to provide a completed checklist to MD

Anderson Parking Management to confirm all scheduled tasks have been completed and by whom.

c. A weekly walk-thru inspection with Contractor’s on-site supervisor and an MD Anderson

Parking & Transportation representative will be conducted, at a location determined by the MD Anderson representative. Inspection scores of 85% or higher are acceptable.

Contractor will have 5 business days to correct identified issues and bring the inspected facility to an 85% or higher score. Sample scorecard is included as Exhibit D.

4. Monthly Report

a. A monthly report on maintenance and cleaning must be completed for each garage, is due by the 5th day of the following month. Report to include any incident and safety reports and staffing hours worked.

5. Safety

a. Prior to introducing or using any chemical or cleaning product on MD Anderson property, Contractor will provide Material Safety Data Sheets (MSDS) to the Project Coordinator. The Project Coordinator will forward all MSDS sheets to MD Anderson’s Chemical Safety Officer, Environmental Health & Safety – Unit 0713.

b. Contractor may not store gasoline or other combustible materials on site.

c. Contractor personnel must be cognizant of their surroundings while performing work in the parking areas and be aware of moving vehicles. While performing work under this contract, Contractor personnel may not wear headphones or talk or text on their personal phones which may limit their ability to hear moving vehicles in the parking areas.

IV. PRICING

1. Contractor will provide a fixed and locked cost per month and year for each location based on the requirements in the Scope of Work document, using Rider 102- Price Schedule.

2. Pricing will remain firm for the initial term of this Agreement. MD Anderson may consider price increase requests at renewals with demonstrated justification. However, no price increase shall exceed 3% annually and must be mutually agreed to by all parties.

3. Contractor personnel will be paid a minimum starting wage of $13 per hour. This cost is to be included in the Contractor’s pricing and not billed to MD Anderson separately.

4. Per Section II. b above, additional parking structures may be added or removed from the current list and Rider 102 – Price Schedule will be the basis for pricing any new location(s).

V. CONTRACT COORDINATOR

1. The Project Coordinator for this Agreement shall be:

Wesley McCoy – Manager, Parking & Transportation. WJMcCoy@mdanderson.org

2. Written correspondence pertaining to the technical administration of this Agreement shall be directed to the Project Coordinator.

VI. PERFORMANCE METRICS

1. Customer Satisfaction Rating

a. Measurement – Complaints per garage. Data taken from customer complaints, Parking

Operations personnel observations and reports, calls to Contractor to come back out and clean, Inside Line submissions and any other MD Anderson communication mechanism.

b. Frequency of Tracking – Monthly

c. Frequency of Reporting – Monthly

d. Acceptable Level – one per location per month.

2. Staffing

a. Measurement – Scheduled staffing coverage %

b. Frequency of Tracking – Daily

c. Frequency of Reporting – Monthly

d. Acceptable Level – Goal of 100%

3. Quality Inspection Scores

a. Measurement – Work completed to MD Anderson satisfaction

b. Weekly walk-through inspections with Contractor’s on-site supervisor and MD Anderson

Parking & Transportation representative.

c. Acceptable Level—inspection scores of 85% or higher.

4. Corrective Action Closure Rate

a. Measures percent of corrective actions completed within the required timeframe

b. Goal of 100% closure rate

c. Considered closed after deficiency is corrected and verified

d. Reoccurring deficiencies may negatively impact performance score mailto:WJMcCoy@mdanderson.org

VII. Liquidated Damages

Liquidated damages are meant as a fair representation of losses in situations where actual damages are difficult to ascertain. Contractor will be subject to adjustments of fees on rider 102 as a result of events that reduce the level of service.

1. Liquidated Damages

a. In the event staffing levels are not met, the Contractor will not receive full payment for the monthly rates outlined in rider 102, as it will be understood that the same level of service was not rendered.

b. Measurement – Prolonged understaffing. More than three consecutive days of understaffing will be considered an understaffing event. After three days, $100 a day per employee will be subtracted from the monthly fees until the position is filled.

c. Unsatisfactory Performance - Key Performance Indicators scored below acceptable levels will result in an adjustment of $100 per day to total fees until corrected.

Exhibit A Parking Location

Exhibit B

Maintenance Frequency

Exhibit C Departmental Uniform Policy

Exhibit D Maintenance Scorecard

1. General Cleaning of Facilities – Summarized in Exhibit B

File details come from the government source that posted it. Updated .