ESBD_575578_1794346592129_Attachment B - Construction Drawings.pdf

PDF 2 MB Posted

Attached to
Football Stadium Repairs
Solicitation number
734-11092026-KM
Issued by
Johnson County, Beaumont City, Texas

About this file

These construction drawings document structural repairs for the Lamar University Football Stadium (Umphrey Stadium) located at 4400 S. Martin Luther King Jr. Parkway in Beaumont, Texas. The project, issued for construction on November 6, 2026, involves comprehensive structural repairs to the West and East stadium stands, including concrete beam and wall repairs, soffit repairs, expansion joint replacements, joint sealant work, corroded steel connection replacement, and handrail cleaning and coating. The architectural and structural design team includes Stantec Architecture Inc. as the architect and Walter P. Moore and Associates Inc. (Martinez Moore Engineers LLC) as the structural engineer. The scope of work encompasses selective demolition of existing stadium seating, structural concrete repairs with shoring, reinforcement augmentation where required, and architectural restoration including painting of repaired concrete surfaces and guard walls with specified finishes such as Natural Linen (SW 9109) and Positive Red (SW 6871) for accent areas.

The project includes a base bid scope and multiple add alternates for expanded painting and coating work. Key technical requirements include installation of temporary shoring prior to concrete repairs, non-destructive evaluation to locate embedded items before cutting or drilling, compliance with the International Existing Building Code 2021 as amended by the City of Beaumont, and adherence to ICRI standards for concrete repair. Concrete repair work must achieve specified cover requirements with reinforcement augmentation tables provided for varying bar loss scenarios. The contractor is responsible for structural stability during construction, disposal of removed materials in compliance with federal and state environmental guidelines, and coordination with the owner regarding salvage and retention of stadium seating components. All work must maintain fire ratings of existing construction, coordinate with owner operations to minimize disruption, and include photo documentation of existing conditions prior to demolition and repair activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OWNER

LAMAR UNIVERSITY

4400 S MARTIN LUTHER KING JR PKWY

BEAUMONT, TX, 77705

TEL. (409) 880-7011

PROJECT TEAM:

ARCHITECT

STANTEC ARCHITECTURE INC.

1100 LOUISIANA, SUITE ONE,

HOUSTON, TX, 77002

TEL. (713) 548-5700

STRUCTURAL ENGINEER

MARTINEZ MOORE ENGINEERS, LLC

1301 MCKINNEY, SUITE 1100,

HOUSTON, TX 77010

TEL. (832) 779-6142

TRUE

NORTH

TRUE

NORTH

Stantec Project Number:

The professional's seal on the cover sheet represents that the information on the cover sheet is accurate in designer's professional opinion but does not assume professional responsibility for documents sealed by others that are referenced on the cover sheet. All professionals sealing drawings as a part of the design are professionally responsible for their own sealed documents.

LOCATION MAP

VICINITY MAP

Issued/Revision By Appd YYYY.MM.DD

4400 S Martin Luther King Jr Pkwy, Beaumont, TX 77705

ISSUE FOR CONSTRUCTION

NOVEMBER 06, 2026

Lamar University, Football

Stadium Repairs

234601127

STADIUM

1 Issue for Construction Stantec Lamar 2026.11.06

11/06/2026

SYMBOLS

DETAIL NUMBER

SHEET ON WHICH

DETAIL IS SHOWN

DETAIL CALLOUTS

EXTERIOR ELEVATIONS

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS SHOWN

INTERIOR ELEVATIONS

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS SHOWN

BUILDING SECTIONS

SECTION NUMBER

SHEET ON WHICH

SECTION IS SHOWN

WALL SECTIONS

SECTION NUMBER

SHEET ON WHICH

SECTION IS SHOWN

FLOOR OR ROOF LEVEL NAME

NORTH ARROW

DRAWING REVISION

PROJECT

NORTH

MATCH LINE

A802

A1

A101

1 Ref

1 Ref

R ef

SIM

A909

SIM

A909

A101

1 DEMOLITION SHEET NOTE

GENERAL SHEET NOTE

BREAK LINE

R ef

ALIGN

ROOM NAME

ROOM NAME

AREA NAME

150 SF

AREA TAG

ROOM NUMBER

AREA

1t WINDOW TAG

PARTITION TYPE TAG

DOOR OPENING NUMBER100A10

T/O FLOOR

SPOT ELEVATION

COLUMN GRID NOTATION

EXISTING NEW

CENTERLINE

TRUE

NORTH

N.I.C. OR EXISTING SHADING

INDICATES CHANGE IN ELEVATION

(IN PLAN OR ELEVATION)

Name

Elevation0.00

FLOOR

VERTICAL ELEVATION

2"

DO NOT SCALE DRAWINGS.

USE FIGURED DIMENSIONS ONLY

INFORMATION

TEXT

TEXT LEADER

SD3W

A a

ABBREVIATIONS

# POUND

+/- PLUS OR MINUS (TOLERANCE)

Ø DIAMETER

AFF ABOVE FINISH FLOOR

AVB AIR / VAPOR BARRIER

BC BOTTOM OF CURB

BF BARRIER FREE

B/O BOTTOM OF

BW BOTTOM OF WALL

CF/CI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED

CFMF COLD FORMED METAL FRAMING

CF/OI CONTRACTOR FURNISHED, OWNER INSTALLED

CJ CONSTRUCTION JOINT / CONTROL JOINT

C/L CENTER LINE

COL COLUMN

CONC CONCRETE

DIA DIAMETER

DIM DIMENSION

DS DOWNSPOUT

DWG DRAWING

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

EQ EQUAL

ETR EXISTING TO REMAIN

EXT EXTERIOR

F/F FACE TO FACE

FFE FINISHED FLOOR ELEVATION

FLR FLOOR

FTG FOOTING

GA GAUGE

HO HOLD OPEN

HP HIGH POINT

HR HOUR

ID INSIDE DIAMETER

INT INTERIOR

JT JOINT

LP LOW POINT

MAX MAXIMUM

MFR MANUFACTURER

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

M/O MASONRY OPENING

NIC NOT IN CONTRACT

NTS NOT TO SCALE

O/C ON CENTER

OD OUTSIDE DIAMETER

OF/CI OWNER FURNISHED, CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED, OWNER INSTALLED

OPP OPPOSITE

R RISERS (STAIRS)

REQ REQUIRED

R/O ROUGH OPENING

SIM SIMILAR

STC SOUND TRANSMISSION CLASS

T TREADS (STAIRS)

TC TOP OF CURB

T/O TOP OF

TBD TO BE DETERMINED

UON UNLESS OTHERWISE NOTED

U/S UNDERSIDE

VIF VERIFY IN FIELD, BY CONTRACTOR

W/ WITH

W/O WITHOUT

WP WORKING POINT

GENERAL NOTES

GENERAL RENOVATION NOTES

1. FIELD VERIFY ALL DIMENSIONS CONCERNING EXISTING AND NEW WORK AND NOTIFY THE ARCHITECT OF

CONDITIONS REQUIRING CHANGES BEFORE PROCEEDING WITH FABRICATION OR INSTALLATION OF

WORK. WHERE CHANGES ARE NECESSARY, THE DRAWINGS SHOW DESIGN INTENT. CONFIRM

CONDITIONS ON DRAWINGS EXPEDITIOUSLY TO MAINTAIN PROJECT SCHEDULE AND PRIOR TO

PROCEEDING WITH THE WORK IN QUESTION AND WITH RELATED WORK.

2. AREAS SHOWN FOR DEMOLITION ARE APPROXIMATE, ACCURATE EDGES TO BE SET BY THE GENERAL

CONTRACTOR IN THE FIELD.

3. REVIEW AND COORDINATE NEW WORK WITH ALL EXISTING CONDITIONS AND ADJACENT WORK. CHANGE

ORDER REQUESTS WILL NOT BE APPROVED FOR CONDITIONS OR CONFLICTS THAT COULD HAVE

REASONABLY BEEN DETERMINED BY THE BIDDER DURING BID, FIELD INSPECTION, OR FOR ANY

CONDITIONS AND/OR CONFLICTS THAT COULD HAVE BEEN COORDINATED BY THE CONTRACTOR AND

SUBCONTRACTORS AFTER AWARD OF CONTRACT. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE

ARCHITECT OF DISCREPANCIES AND SHALL OBTAIN CLARIFICATION FROM THE ARCHITECT REGARDING

DESIGN INTENT PRIOR TO PROVIDING BID.

4. PERFORM DISASSEMBLY AND REMOVALS IN A CONTROLLED MANNER; WITHOUT UNNECESSARY CUTS;

WITHOUT DAMAGE TO THE SITE, STRUCTURE OR FEATURES; WITHOUT DAMAGE TO THE MATERIALS OR

CONSTRUCTION TO REMAIN.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL REMOVED ITEMS IN A SAFE AND

ENVIRONMENTALLY ACCEPTABLE MANNER COMPLYING WITH FEDERAL, STATE, AND LOCAL GUIDELINES

FOR DISPOSING OF MATERIALS.

6. WHERE NEW WORK ADJOINS EXISTING, SUCH NEW WORK SHALL BE PROPERLY INTEGRATED WITH THE

EXISTING TO ENSURE UNIFORM APPEARANCE AND FUNCTION, UNLESS OTHERWISE NOTED.

7. MAINTAIN FIRE RATINGS OF ADJACENT EXISTING CONSTRUCTION AND SUPPLEMENT WITH TEMPORARY

CONSTRUCTION PARTITIONS MATCHING REQUIRED EXISTING RATINGS.

8. MAINTAIN ACCESS TO PROJECT AREA AND INSTALL TEMPORARY LIFE SAFETY MEASURES AS REQUIRED

BY OWNER AND AHJ.

9. FLOOR ELEVATIONS NOTED ARE TO THE TOP OF CONCRETE SLAB OR DECK UNLESS OTHERWISE NOTED.

10. WHERE EXISTING FINISHES ARE REQUIRED TO BE REMOVED TO INSTALL NEW FINISHES, REMOVE DOWN

TO EXISTING SUBSTRATE AND PREPARE SUBSTRATE TO CREATE A SMOOTH AND LEVEL CONDITION.

PROVIDE CONTRACT FINISHES AS INDICATED ON CONTRACT DOCUMENTS.

11. PATCH HOLES IN EXISTING WALLS, COLUMNS, FLOORS, AND CEILINGS TO REMAIN. MATCH ADJACENT

EXISTING SURFACES AND MATERIALS OR AS REQUIRED TO RECEIVE SCHEDULED NEW FINISHES.

12. PROVIDE TEMPORARY [DUST] BARRIERS AND/OR INFECTION CONTROL PARTITIONS NECESSARY TO

MAINTAIN EXISTING FACILITY OPERATIONS. CONSTRUCTION AND LOCATION OF TEMPORARY BARRIERS

ARE TO BE COORDINATED WITH OWNER PRIOR TO INSTALLATION.

13. UNLESS OTHERWISE NOTED, REMOVE EXISTING UNUSED PROJECTIONS, HANGER, BOLTS, NAILS, BRACKETS, CURTAIN RODS, VALANCES, ETC. FROM EXISTING WALLS AND COLUMNS. PATCH HOLES IN

EXISTING WALLS, COLUMNS, FLOORS, AND CEILINGS TO REMAIN. MATCH ADJACENT EXISTING SURFACES

AND MATERIALS OR AS REQUIRED TO RECEIVE SCHEDULED NEW FINISHES.

14. ALL EXISTING AND NEW PENETRATIONS THROUGH FLOORS, FIRE-RATED OR SMOKE-RATED WALLS, BARRIERS OR PARTITIONS, WITHIN THE AREA OF WORK SHALL BE FILLED AND SEALED WITH APPROVED

FIRE/SMOKE RATED PENETRATION SEALANT SYSTEMS TO MAINTAIN FIRE RATING CONTINUITY OF THE

PENETRATED CONSTRUCTION.

15. WHERE CUTTING AND/OR CHIPPING OF STRUCTURAL SLAB IS REQUIRED, NO REBAR SHALL BE CUT

WITHOUT WRITTEN APPROVAL FROM THE BUILDING OWNER AND THE DESIGNATED STRUCTURAL

ENGINEER. WHERE CORE DRILLING IS REQUIRED, VERIFY EXACT LOCATIONS WITH THE DESIGNATED

STRUCTURAL ENGINEER AND ARCHITECT BEFORE PROCEEDING. ADHERE TO BUILDING REGULATIONS

AND GUIDELINES PRIOR TO CORE DRILLING.

16. PROVIDE ADEQUATE TEMPORARY SUPPORT DURING CUTTING AND PATCHING SO AS TO PREVENT

DAMAGE TO RETAINED OR ADJOINING WORK.

17. CUT THE WORK USING METHODS THAT ARE LEAST LIKELY TO DAMAGE WORK TO BE RETAINED OR

ADJOINING WORK. PATCH WITH DURABLE SEAMS THAT ARE AS INCONSPICUOUS AS POSSIBLE AND THAT

COMPLY WITH SPECIFIED TOLERANCES FOR THE WORK. WHERE NECESSARY, EXTEND FINISH

RESTORATION INTO RETAINED ADJOINING WORK IN A MANNER WHICH WILL ELIMINATE EVIDENCE OF

PATCHING AND REFINISHING.

18. DO NOT DISPOSE OF REMOVED STADIUM SEATING OR ASSOCIATED COMPONENTS UNTIL REVIEWED AND

APPROVED BY OWNER. CONTRACTOR SHALL COORDINATE WITH OWNER TO IDENTIFY ITEMS TO BE

SALVAGED, RETAINED, OR DISPOSED OF. UPON OWNER APPROVAL, LEGALLY DISPOSE OF ITEMS NOT

DESIGNATED FOR SALVAGE.

19. AT ALL EXISTING CONCRETE STRUCTURAL REPAIR LOCATIONS, PATCH AND PREPARE REPAIRED AREAS

FOR PAINTING. PAINT REPAIRED AND PATCHED AREAS TO MATCH EXISTING ADJACENT COLOR, SHEEN, TEXTURE, AND FINISH. CONTRACTOR SHALL VERIFY EXISTING PAINT MATCH AND OBTAIN OWNER

APPROVAL PRIOR TO APPLICATION.

20. THE CONTRACTOR SHALL PROMPTLY DOCUMENT AND NOTIFY THE ARCHITECT OF CONCEALED OR

MATERIALLY DIFFERING CONDITIONS BEFORE DISTURBING THE AFFECTED WORK. ADJUSTMENTS, IF ANY, WILL BE EVALUATED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

21. ALL WORK SHOWN OR INDICATED IN THE CONTRACT DOCUMENTS SHALL BE INCLUDED IN THE BASE BID

UNLESS SPECIFICALLY IDENTIFIED AS AN ADD ALTERNATE. ADD ALTERNATE WORK SHALL BE PRICED

SEPARATELY AS INDICATED.

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issue/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Notes

/6 /2

:1

:4

P M

12" = 1'-0"

1< P ic k lo c a ti o n in P ro je c t

In fo rm a ti o n

4400 S Martin Luther King Jr Pkwy, Beaumont, TX 77705

DRAWING LIST, STANDARD

ABBREVIATIONS, AND SYMBOLS

Lamar University

Lamar University, Football Stadium Repairs

234601127

G-001

STANTEC ARCHITECTURE INC.

1100 LOUISIANA

SUITE ONE

HOUSTON, TX 77002

Tel: (713) 548-5700 • www.stantec.com

1 Issue for Construction Stantec Lamar 2026.11.06

NO. DRAWING NAME

GENERAL

G-000 COVER SHEET

G-001 DRAWING LIST, STANDARD ABBREVIATIONS, AND SYMBOLS

STRUCTURAL

S-000 GENERAL NOTES

S-100 WEST STANDS FRAMING PLAN - SOFFIT REPAIRS

S-101 EAST STANDS FRAMING PLAN - SOFFIT REPAIRS

S-102 WEST STANDS FRAMING PLAN - TOP

S-103 EAST STANDS FRAMING PLAN - TOP

S-104 PRESS BOX LOWER LEVEL ROOF FRAMING PLAN

S-300 TYPICAL DETAILS

S-301 TYPICAL DETAILS

ARCHITECTURAL SITE

AS-100 SITE PLAN - OVERALL

ARCHITECTURE

A-100 WEST STANDS SOFFITT

A-101 EAST STANDS SOFFITT

A-102 WEST STANDS - FLOOR PLAN

A-103 EAST STANDS - FLOOR PLAN

A-104 CONCOURSE PLAN

DRAWING LIST

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issued/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Stantec Architecture, Inc.

1100 Louisiana Street, Suite One

Houston, Texas 77002, Tel: 713 871 8484 • www.stantec.com

Walter P Moore and Associates, Inc.

1301 McKinney Street, Suite 1100 Houston, TX 77010 TBPE Firm Registration No. 1856 713.630.7300

11/06/2026

/4 /2

:1

:4

P M

4400 S Martin Luther King Jr Pkwy

Beaumont, TX 77705

COVER SHEET

Lamar University

LAMAR UNIVERSITY, FOOTBALL STADIUM

REPAIRS

234601127

CVR

LAMAR UNIVERSITY - PROVOST UMPHREY STADIUM STRUCTURAL REPAIRS

SHEET LIST

SHEET

NUMBER SHEET NAME

CVR COVER SHEET

S-000 GENERAL NOTES

S-100 WEST STANDS FRAMING PLAN - SOFFIT REPAIRS

S-101 EAST STANDS FRAMING PLAN - SOFFIT REPAIRS

S-102 WEST STANDS FRAMING PLAN - TOP

S-103 EAST STANDS FRAMING PLAN - TOP

S-104 PRESS BOX LOWER LEVEL ROOF FRAMING PLAN

S-300 TYPICAL DETAILS

S-301 TYPICAL DETAILS

PROJECT LOCATION

N

SITE PLAN

4400 S MARTIN LUTHER KING JR PKWY, BEAUMONT, TX 77705

ISSUE FOR CONSTRUCTION RA 2026.11.06

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issued/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Stantec Architecture, Inc.

1100 Louisiana Street, Suite One

Houston, Texas 77002, Tel: 713 871 8484 • www.stantec.com

Walter P Moore and Associates, Inc.

1301 McKinney Street, Suite 1100 Houston, TX 77010 TBPE Firm Registration No. 1856 713.630.7300

11/06/2026

/4 /2

:1

:4

P M

4400 S Martin Luther King Jr Pkwy

Beaumont, TX 77705

GENERAL NOTES

Lamar University

LAMAR UNIVERSITY, FOOTBALL STADIUM

REPAIRS

234601127

S-000

PART I - DESIGN CRITERIA

A. GENERAL BUILDING CODE

1. THE CONSTRUCTION DOCUMENTS ARE BASED ON THE REQUIREMENTS OF THE

INTERNATIONAL EXISTING BUILDING CODE 2021 AS AMEDED BY THE CITY OF BEUMONT,

TEXAS. DOCUMENTS ARE BASED UPON REPAIRS OF THE EXISTING STRUCTURE.

B. DEAD LOADS

1. SELF WEIGHT OF THE STRUCTURE.

C. LIVE LOADS

1. 60 PSF - STADIUMS AND ARENAS WITH FIXED SEATS (FASTENED TO THE FLOOR)

D. WIND LOADS

1. DRAWIINGS HEREIN ARE FOR THE REPAIRS OF AN EXISTING STRUCTURE. NO CHANGES TO

THE LATERAL SYSTEM ARE REQUIRED IN ACCORDANCE WITH IEBC 2021

PART II - SHORING

A. GENERAL

1. SHORING DESIGN IN THESE DRAWINGS IS AN INTERIM, TEMPORARY MEASURE

TO PROVIDE SUPPLEMENTAL GRAVITY SUPPORT TO THE AREA AFFECTED BY THE

DAMAGED MEMBERS.

2. THESE DRAWINGS INDICATE SHORING PERFORMANCE REQUIREMENTS FOR

STRUCTURAL REPAIRS AT LAMAR STADIUM AND LOCATION OF SHORING WITHIN

FACILITY. THE DETAILS SHOWN IN THE DRAWINGS ARE CONCEPTUAL IN NATURE TO

INDICATE THE INTENDED MEANS OF SUPPORTING THE INDICATED MEMBERS BY THE

SHORES. THE FINAL DESIGN OF THE SHORING TO MEET THESE REQUIREMENTS SHALL

BE RESPONSIBILITY OF THE SHORING CONTRACTOR AND SHALL BE PERFORMED BY A

PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE PROJECT IS

LOCATED.

3. THE SHORING CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND DESIGN

CALCULATIONS OF THE SHORING TO THE ENGINEER FOR REVIEW AND APPROVAL

BEFORE EXECUTING THE INSTALLATION. THE SHOP DRAWINGS AND CALCULATIONS

SHALL BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE

STATE WHERE THE PROJECT IS LOCATED. SHOP DRAWINGS SHALL INCLUDE THE

FOLLOWING ELEMENTS:

a. SHORING POSTS.

b. DETAILS OF ATTACHMENT OF SHORING POSTS TO SUPPORTING

STRUCTURAL MEMBERS.

c. DETAILS OF SHORING POST BASE PLATES.

B. DESIGN CRITERIA

1. SHORING SHALL BE DESIGN FOR A TOTAL SERVICE (UNFACTORED) DEAD LOAD

OF 12 PSF AND SERVICE (UNFACTORED) LIVE LOAD OF 20 PSF WHERE SHORING DETAILING

IS NOT PROVIDED. PROVIDE A MINIMUM SAFETY FACTOR OF 2.0 FOR SHORING DESIGN.

REFER TO DRAWINGS FOR REQUIRED RATED CAPACITIES OF INDIVIDUAL SHORING

ELEMENTS.

2. CONSTRUCTION LOADS (EQUIPMENT, MATERIALS, AND WORKERS) ON THE WORK

AREA SHALL NOT EXCEED 12 PSF.

3. THE AREA BEING SHORED SHALL NOT BE OPEN TO THE PUBLIC DURING

CONSTRUCTION ACTIVITIES.

4. THE REQUIRED RATED CAPACITY OF THE SHORING INDICATED IN THE DRAWINGS SHALL

CONSIDER THE HEIGHT OF THE SHORING UNDER THE MEMBERS BEING SHORED WHEN THE

SHORES ARE EXTENDED IN PLACE.

C. INSTALLATION OF SHORING

1. SHORING SHALL BE PUT IN PLACE PRIOR TO PERFORMING THE REPAIRS

INDICATED IN THE DRAWINGS. SHORING SHALL REMAIN IN PLACE DURING REPAIRS

AND SHALL NOT BE REMOVED UNTIL ALL REPAIRS HAVE BEEN COMPLETED.

2. SHORES SHALL BE INSTALLED SNUG TIGHT ONLY AGAINST THE MEMBER BEING

SHORED. DO NOT RELIEVE LOAD FROM THE EXISTING STRUCTURE.

3. ALL SHORING MUST BE INSTALLED VERTICALLY PLUMB. PROVIDE BRACING

BETWEEN ADJACENT SHORE POSTS/LEGS AS REQUIRED FOR STABILITY. INSTALL

SHORING BRACING PER MANUFACTURER’S SPECIFICATIONS.

4. SHORING SHALL BE LOCATED UNDER THE MEMBERS SHOWN IN THE DRAWINGS

AND POSITIONED SO THAT THE LOAD IS TRANSFERRED DIRECTLY TO THE

SUPPORTING STRUCTURAL MEMBERS INDICATED IN THE DRAWINGS. CONTACT

ENGINEER IF A SHORING CANNOT BE PROVIDED AT A LOCATION INDICATED IN THE

DRAWINGS. IF SUPPORTING MEMBERS ARE PART OF THE FOUNDATION, CONTRACTOR

SHALL FIELD VERIFY THE LOCATION OF THE SUPPORTING FOUNDATION ELEMENTS.

5. SHORING POSTS/LEGS SHALL BE PROVIDED WITH BASE PLATES SO THAT THE

LOAD IS UNIFORMLY DISTRIBUTED OVER AN AREA OF 10 SQUARE FOOT SECTION OF

THE FLOOR SLAB.

6. PROVIDE APPROPRIATE ANCHORAGE AT THE TOP AND BOTTOM OF SHORING

ELEMENTS TO PREVENT OVERTURNING OR TIPPING OVER OF SHORING.

7. IT IS THE CONTRACTOR’S RESPONSIBILITY TO PROTECT EXPOSED

STRUCTURAL FINISHED SURFACES (FLOOR, OVERHEAD SLAB, BEAMS, COLUMNS,

WALLS, ETC.) DURING INSTALLATION OF SHORING.

8. SHORING LAYOUT SHALL MEET SAFETY AND OPERATION REQUIREMENTS OF THE

OWNER.

9. SHORING DETAILS SHOWN IN DRAWINGS ARE CONCEPTUAL ONLY. ACTUAL

SHORING MEMBERS AND CONNECTIONS MAY VARY DEPENDING ON THE SHORING

MANUFACTURER’S PROPRIETARY SYSTEM AVAILABLE.

10. SHORING SHALL BE INSTALLED IN STRICT ACCORDANCE WITH

MANUFACTURER’S SPECIFICATIONS.

PART III - NON-DESTRUCTIVE EVALUATION

A. ITEMS EMBEDDED IN CONCRETE STRUCTURES

1. ITEMS EMBEDDED IN CONCRETE STRUCTURES SHALL NOT BE DAMAGED DURING

REPAIR WORK OR INSTALLATION OF NEW MEMBERS REQUIRING POST-INSTALLED

ANCHORS. EMBEDDED ITEMS MAY INCLUDE MILD REINFORCEMENT, PRESTRESSING

REINFORCEMENT, DOWELS, EMBEDDED CONNECTIONS, ELECTRICAL CONDUITS,

PLUMBING, ETC.

2. ITEMS EMBEDDED IN CONCRETE SHALL BE LOCATED BY NON-DESTRUCTIVE

EVALUATION PRIOR TO PERFORMING ANY WORK. CONTRACTOR SHALL MARK ON THE

STRUCTURE THE LOCATION OF EMBEDDED ITEMS AND PROVIDE A REPORT TO THE

ENGINEER.

3. ENGINEER MAY REQUIRE A PARTICULAR NON-DESTRUCTIVE EVALUATION

METHOD FOR THE LOCATION OF EMBEDDED ITEMS.

PART IV - SELECTIVE DEMOLITION

A. RESPONSIBILITY OF THE CONTRACTOR FOR STABILITY OF THE STRUCTURE DURING

DECONSTRUCTION / DEMOLITION

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL REQUIRED

BRACING DURING DEMOLITION TO MAINTAIN THE STABILITY AND SAFETY OF ALL

STRUCTURAL ELEMENTS DURING THE DEMOLITION PROCESS. CONTRACTOR SHALL

ENGAGE A PROFESSIONAL ENGINEER TO SURVEY CONDITION OF BUILDING TO

DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL

DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF STRUCTURE OR ADJACENT

STRUCTURES DURING SELECTIVE DEMOLITION OPERATIONS.

B. DEFINITIONS

1. REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY

DISPOSE OF THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR

REMOVED AND REINSTALLED.

2. REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND

DELIVER THEM TO OWNER READY FOR REUSE. OWNER TO IDENTIFY ITEMS TO BE

REUSED OR SALVAGED.

3. EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO

BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED

AND SALVAGED, OR REMOVED AND REINSTALLED.

C. MATERIAL OWNERSHIP

1. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, SALVAGED, OR

OTHERWISE INDICATED TO REMAIN OWNER’S PROPERTY, DEMOLISHED MATERIALS

SHALL BECOME CONTRACTOR’S PROPERTY AND SHALL BE REMOVED FROM PROJECT

SITE. THE MATERIALS REMOVED SHALL BE DISPOSED OF IN A PROPER AND LEGAL

MANNER PER FEDERAL/STATE OR LOCAL ORDINANCES.

D. QUALITY ASSURANCE

1. DEMOLITION FIRM QUALIFICATIONS: AN EXPERIENCED FIRM THAT HAS

SPECIALIZED IN DEMOLITION WORK SIMILAR IN MATERIAL AND EXTENT TO THAT

INDICATED FOR THIS PROJECT.

2. PROFESSIONAL QUALIFICATIONS OF ENGINEER ENGAGED BY CONTRACTOR:

CURRENT REGISTRATION IN THE STATE WHERE THE PROJECT IS LOCATED.

PART IV - SELECTIVE DEMOLITION (CONTINUED)

4. PHOTO DOCUMENTATION OF EXISTING CONDITIONS OF THE BUILDING AND

ADJOINING PROPERTIES SHALL BE PERFORMED BY CONTRACTOR PRIOR TO

DEMOLITION. PHOTOS SHALL BE SUBMITTED TO OWNER AND ENGINEER OF RECORD.

5. PRE-DEMOLITION CONFERENCE: CONDUCT CONFERENCE AT PROJECT SITE TO

ADDRESS THE FOLLOWING:

a. INSPECT AND DISCUSS CONDITION OF CONSTRUCTION TO BE

SELECTIVELY DEMOLISHED.

b. REVIEW STRUCTURAL LOAD LIMITATIONS OF EXISTING STRUCTURE AS

APPROPRIATE FOR THE PROPOSED MEANS AND METHODS.

c. REVIEW AND FINALIZE SELECTIVE DEMOLITION SCHEDULE AND VERIFY

AVAILABILITY OF MATERIALS, DEMOLITION PERSONNEL, EQUIPMENT, AND

FACILITIES NEEDED TO MAKE PROGRESS AND AVOID DELAYS.

E. PROJECT CONDITIONS

1. CONDUCT SELECTIVE DEMOLITION SO OWNER’S OPERATIONS WILL NOT BE

DISRUPTED. PROVIDE NOT LESS THAN 72-HOUR NOTICE TO OWNER OF ACTIVITIES

THAT WILL AFFECT OWNER’S OPERATIONS.

2. MAINTAIN ACCESS TO EXISTING WALKWAYS, CORRIDORS, AND OTHER

ADJACENT OCCUPIED OR USED FACILITIES. DO NOT CLOSE OR OBSTRUCT WALKWAYS,

CORRIDORS, OR OTHER OCCUPIED OR USED FACILITIES WITHOUT WRITTEN

PERMISSION FROM AUTHORITIES HAVING JURISDICTION.

3. OWNER ASSUMES NO RESPONSIBILITY FOR CONDITION OF AREAS TO BE

SELECTIVELY DEMOLISHED.

a. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSE

WILL BE MAINTAINED BY OWNER AS FAR AS PRACTICAL.

b. BEFORE SELECTIVE DEMOLITION, OWNER WILL REMOVE ITEMS WITHIN

SPACE AS NEEDED.

4. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE

ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY ENGINEER AND OWNER.

THESE MATERIALS SHALL BE REMOVED AS DISPOSED AS APPROVED BY GOVERNING

AGENCY.

5. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE WILL NOT BE

PERMITTED.

6. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN

IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION

OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING

SELECTIVE DEMOLITION OPERATIONS.

7. PROTECT ADJACENT PAVING (ASPHALT OR CEMENT ROADWAYS, SEWERS,

ETC.), AND DRAINAGE DITCHES AS NEEDED.

8. ALL AREAS OUTSIDE OF DEMOLITION SCOPE ARE TO BE PROTECTED FROM

DAMAGE BY CONTRACTOR. RESTORE AREAS SUBJECT TO INCIDENTAL DAMAGE TO

THEIR PRE-DEMOLITION CONDITION.

F. UTILITY SERVICES

1. REFER TO DIVISION 01 SECTIONS REGARDING REQUIREMENTS FOR

MAINTAINING EXISTING UTILITIES IN SERVICE AND FOR INTERRUPTIONS OF

EXISTING UTILITIES.

G. PREPARATION

1. DANGEROUS MATERIALS: DRAIN, PURGE, OR OTHERWISE REMOVE, COLLECT,

AND DISPOSE OF CHEMICALS, GASES, EXPLOSIVES, ACIDS, FLAMMABLES, OR OTHER

DANGEROUS MATERIALS BEFORE PROCEEDING WITH SELECTIVE DEMOLITION

OPERATIONS.

a. PROTECT EXISTING SITE IMPROVEMENTS, APPURTENANCES, AND

LANDSCAPING TO REMAIN.

b. ERECT A PLAINLY VISIBLE FENCE AROUND DRIP LINE OF INDIVIDUAL

TREES OR AROUND PERIMETER DRIP LINE OF GROUPS OF TREES TO REMAIN.

2. CONTRACTOR TO MAINTAIN ACCESS TO EXITS AND EXIT STAIRS AT ALL

TIMES. FIRE ALARMS AND SMOKE DETECTION SYSTEM SHALL REMAIN OPERATIONAL

AT ALL TIMES. PROTECT SMOKE DETECTORS AS REQUIRED AND IN CONFORMANCE TO

LOCAL CODES AND LOCAL AUTHORITIES

3. TEMPORARY FACILITIES: PROVIDE TEMPORARY BARRICADES AND OTHER

PROTECTION REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT

BUILDINGS AND FACILITIES TO REMAIN.

a. PROVIDE PROTECTION TO ENSURE SAFE PASSAGE OF PEOPLE AROUND

SELECTIVE DEMOLITION AREA AND TO AND FROM OCCUPIED PORTIONS OF

ADJACENT FACILITIES.

4. CONTRACTOR TO PROVIDE ALL NECESSARY TRAFFIC CONTROL AND PEDESTRIAN

CONTROL MEASURES AS REQUIRED.

5. CONTRACTOR TO COORDINATE WITH OWNER IF ANY REMOVAL OF LANDSCAPE IS

REQUIRED

6. TEMPORARY PARTITIONS: ERECT AND MAINTAIN DUSTPROOF PARTITIONS AND

TEMPORARY ENCLOSURES TO LIMIT DUST AND DIRT MIGRATION AND TO SEPARATE

AREAS FROM FUMES AND NOISE.

7. TEMPORARY SHORING: PROVIDE AND MAINTAIN INTERIOR AND EXTERIOR

SHORING, BRACING, OR STRUCTURAL SUPPORT TO PRESERVE STABILITY AND TO

PREVENT UNEXPECTED OR UNCONTROLLED MOVEMENT OR COLLAPSE OF CONSTRUCTION

BEING DEMOLISHED. STRENGTHEN OR ADD TEMPORARY SUPPORTS WHEN REQUIRED

DURING PROGRESS OF SELECTIVE DEMOLITION.

H. POLLUTION CONTROLS

1. REFER TO DIVISION 01 SPECIFICATION SECTIONS FOR REQUIREMENTS ON

DUST CONTROL, DISPOSAL, AND CLEANING OF DEMOLISHED MATERIAL.

I. EXECUTION OF SELECTIVE DEMOLITION

1. GENERAL: DEMOLISH EXISTING CONSTRUCTION AS INDICATED. USE METHODS

REQUIRED TO COMPLETE THE WORK WITHIN LIMITATIONS OF GOVERNING

REGULATIONS AND AS FOLLOWS:

a. USE CUTTING METHODS LEAST LIKELY TO DAMAGE CONSTRUCTION TO

REMAIN OR ADJOINING CONSTRUCTION.

b. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF

FLAMMABLE MATERIALS. AT CONCEALED SPACES VERIFY CONDITION AND

CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OPERATIONS.

MAINTAIN FIRE WATCH AND PORTABLE FIRE-SUPPRESSION DEVICES DURING

FLAME-CUTTING OPERATIONS.

c. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.

d. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR

UNSUITABLE MATERIALS AND PROMPTLY DISPOSE OF OFF-SITE.

e. LOCATE SELECTIVE DEMOLITION EQUIPMENT AND REMOVE DEBRIS AND

MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS ON SUPPORTING WALLS,

SLABS, OR FRAMING.

f. DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY.

2. EXISTING FACILITIES: COMPLY WITH OWNER’S REQUIREMENTS FOR USING

AND PROTECTING OTHER BUILDING FACILITIES DURING SELECTIVE DEMOLITION

OPERATIONS.

3. REMOVED AND SALVAGED ITEMS: COMPLY WITH THE FOLLOWING:

a. CLEAN SALVAGED ITEMS.

b. STORE ITEMS IN A SECURE AREA UNTIL DELIVERY TO OWNER.

c. TRANSPORT ITEMS TO OWNER’S STORAGE AREA AS DESIGNATED BY

OWNER.

4. EXISTING ITEMS TO REMAIN: CONTRACTOR TO COORDINATE WITH OWNER

(PRIOR TO BEGINNING WORK) ON ITEMS THAT ARE TO REMAIN AND HENCE BE

PROTECTED DURING THE DEMOLITION PROCESS. WHEN PERMITTED BY OWNER, ITEMS

MAY BE REMOVED TO A SUITABLE AND/OR PROTECTED LOCATION.

5. CONCRETE SLABS-ON-GRADE: SAW-CUT PERIMETER OF AREA TO BE

DEMOLISHED, THEN BREAK UP AND REMOVE.

J. DISPOSAL OF DEMOLISHED MATERIALS

1. GENERAL: PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOW

DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.

2. BURNING: DO NOT BURN DEMOLISHED MATERIALS.

3. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF OWNER’S PROPERTY AND

LEGALLY DISPOSE OF THEM.

PART V - CONCRETE REPAIRS

A. CONCRETE REPAIR MATERIALS

1. ALL CONCRETE SHALL CONFORM TO THE REQUIREMENTS AS SPECIFIED IN

SPECIFICATION SECTION “CONCRETE REPAIR MATERIALS.”

B. HORIZONTAL CONSTRUCTION JOINTS IN CONCRETE POURS

1. THERE SHALL BE NO HORIZONTAL CONSTRUCTION JOINTS IN ANY CONCRETE

POURS UNLESS SHOWN ON THE DRAWINGS. THE ENGINEER SHALL APPROVE ALL

DEVIATIONS OR ADDITIONAL JOINTS IN WRITING.

C. REINFORCING STEEL

1. ALL REINFORCING STEEL SHALL BE ASTM A615 GRADE 60 UNLESS NOTED

OTHERWISE ON THE DRAWINGS OR IN THESE NOTES.

D. REINFORCING STEEL COVERAGE

1. REINFORCING STEEL COVERAGE SHOULD CONFORM TO THE REQUIREMENTS

SPECIFIED ON THE DRAWINGS. COVER SPECIFIED SHALL BE CONSIDERED MINIMUM,

HOWEVER EXISTING REINFORCEMENT MAY HAVE A SMALLER COVER THAN SPECIFIED

IN DRAWING DETAILS. CONCRETE PATCHES CAN BE BUILT UP TO PROVIDE THE

REQUIRED COVER AS LONG AS THE PATCH APPEARANCE IS ACCEPTABLE TO OWNER

AND IT DOES NOT REPRESENT A TRIPPING HAZARD TO PEDESTRIANS OR A BUMP TO

VEHICLES. COVER IN STRUCTURAL MEMBERS NOT SPECIFIED IN THE DETAILS SHALL

CONFORM TO THE REQUIREMENTS OF ACI 318 UNLESS SPECIFIED OTHERWISE ON THE

DRAWINGS.

PART VI - STRUCTURAL STEEL

A. ALL STRUCTURAL STEEL SHALL CONFORM TO THE REQUIREMENTS AS SPECIFIED IN

SPECIFICATION SECTION “STEEL FIELD RE-COATING”.

PART VII - SPECIAL INSPECTIONS

A. STATEMENT OF SPECIAL INSPECTIONS

1. SPECIAL INSPECTION IS REQUIRED FOR THE ITEMS LISTED BELOW. REFER

TO GENERAL NOTES PART “STRUCTURAL TESTING AND INSPECTIONS” FOR TYPE AND

EXTENT OF EACH SPECIAL INSPECTION AND TEST. GENERAL NOTES PART

“STRUCTURAL TESTING AND INSPECTIONS” ALSO INDICATES WHETHER CONTINUOUS

OR PERIODIC INSPECTION IS REQUIRED FOR THE ITEMS LISTED ABOVE ADDITIONAL

INFORMATION.

B. THE OWNER’S TESTING AGENCY SHALL PROVIDE SPECIAL INSPECTION SERVICES

IN ACCORDANCE WITH THE REFERENCED BUILDING CODE FOR THE FOLLOWING ITEMS.

1. STEEL CONSTRUCTION:

a. STRUCTURAL STEEL AND BOLTING

b. ALL FIELD WELDING

c. WELDING OF STRUCTURAL STEEL

2. CONCRETE CONSTRUCTION:

a. CONCRETE/GROUTING MATERIALS AND PLACEMENT.

b. POST-INSTALLED ANCHORS

c. REINFORCING STEEL PLACING

PART VIII - SUBMITTALS

A. SUBMITTAL LIST AND SCHEDULE

1. THE CONTRACTOR SHALL PREPARE A DETAILED LIST AND SCHEDULE OF ALL

SUBMITTAL ITEMS TO BE SENT TO THE STRUCTURAL ENGINEER PRIOR TO THE START

OF CONSTRUCTION. THIS LIST SHALL BE UPDATED AND REVISED AND KEPT CURRENT

AS THE JOB PROGRESSES. THE SUBMITTAL LIST SHALL BE ORGANIZED AS SHOWN

BELOW:

a. SHOP DRAWINGS

b. DESIGN CALCULATIONS

c. PRODUCT TECHNICAL DATA

d. PRODUCT MSDS/SDS

e. CERTIFICATES, REPORTS, AND OTHER LITERATURE

B. SUBMITTALS TO BE PROVIDED TO STRUCTURAL ENGINEER

1. PRODUCT SUBMITTALS: IN ADDITION TO THE SUBMITTALS REQUIRED BY THE

PROJECT SPECIFICATIONS, THE FOLLOWING SUBMITTALS SHALL BE PROVIDED:

a. CONCRETE REPAIR MATERIALS.

b. BOLTS, RODS, NUTS, WASHERS AND ASSOCIATED COMPONENTS.

c. EXPANSION JOINT SYSTEM.

d. JOINT SEALANTS (HORIZONTAL, VERTICAL, AND COVE).

e. STRUCTURAL STEEL

2. DEFERRED SUBMITTALS:

a. THE FOLLOWING ITEMS ARE CONSIDERED DEFERRED SUBMITTALS BY THE

REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE:

1) SHORING (S&S, REC)

NOTES:

(S&S) ITEMS MARKED THUS SHALL HAVE THE SHOP DRAWINGS AND

DELEGATED DESIGN SUBMITTALS (INCLUDING CALCULATIONS) SEALED PER

THE PROJECT SPECIFICATIONS BY AN ENGINEER REGISTERED IN THE

STATE WHERE THE PROJECT IS LOCATED.

(REC)ITEMS MARKED THUS SHALL BE SUBMITTED TO ENGINEER FOR

RECORD ONLY AND WILL NOT HAVE THE ENGINEER’S SHOP DRAWING STAMP

AFFIXED.

b. DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO

THE REGISTERED DESIGN PROFESSIONAL AND SHALL BE FORWARDED TO THE

BUILDING OFFICIAL.

c. DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE

DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING

OFFICIAL.

3. SUBMITTAL REQUIREMENTS:

a. ALL SHOP DRAWINGS MUST BE REVIEWED AND ELECTRONICALLY STAMPED

BY THE CONTRACTOR PRIOR TO SUBMITTAL.

b. CONTRACTOR SHALL PROVIDE THE SUBMITTAL IN ELECTRONIC PORTABLE

DOCUMENT FORMAT (PDF) PER THE SPECIFICATIONS.

c. THE OMISSION FROM THE SHOP DRAWINGS OF ANY MATERIALS REQUIRED

BY THE CONTRACT DOCUMENTS TO BE FURNISHED SHALL NOT RELIEVE THE

CONTRACTOR OF THE RESPONSIBILITY OF FURNISHING AND INSTALLING SUCH

MATERIALS, REGARDLESS OF WHETHER THE SHOP DRAWINGS HAVE BEEN

REVIEWED AND APPROVED.

C. REPRODUCTION

1. THE USE OF ELECTRONIC FILES OR REPRODUCTIONS OF THESE CONTRACT

DOCUMENTS BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR, OR

MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS SIGNIFIES

THEIR ACCEPTANCE OF ALL INFORMATION SHOWN HEREON AS CORRECT, AND

OBLIGATES THEMSELVES TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO

ANY ERRORS THAT MAY OCCUR HEREON.

PART IX - MISCELLANEOUS

A. CONTRACT DOCUMENTS

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL CONTRACT

DOCUMENTS AND LATEST ADDENDA AND TO SUBMIT SUCH DOCUMENTS TO ALL

SUBCONTRACTORS AND MATERIAL SUPPLIERS PRIOR TO THE SUBMITTAL OF SHOP

DRAWINGS, FABRICATION OF ANY STRUCTURAL MEMBERS, AND ERECTION IN THE

FIELD.

2. CONTRACTOR SHALL FULLY AND PROPERLY IMPLEMENT THE ENGINEERING

CONTROLS, WORK PRACTICES, AND RESPIRATORY PROTECTION AGAINST TOXIC AND

HAZARDOUS SUBSTANCES INCLUDING RESPIRABLE CRYSTALLINE SILICA ACCORDING

TO OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, OSHA 1926.1153. WALTER

P MOORE DOES NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE

CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR

SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, NOR SHALL

WALTER P MOORE BE RESPONSIBLE FOR THE CONTRACTOR’S FAILURE TO PERFORM

THE WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.

3. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE

REPAIRED STRUCTURE, AND, EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT

INDICATE THE METHOD OR MEANS OF CONSTRUCTION. THE CONTRACTOR SHALL

SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL

CONSTRUCTION MEANS, METHODS, PROCEDURES, TECHNIQUES, AND SEQUENCE.

4. REFER TO DRAWINGS OF EXISTING FACILITY (OTHER THAN REPAIR

DRAWINGS) FOR COMPLETE INFORMATION INCLUDING: EXPANSION JOINT SYSTEMS,

PREVIOUS REPAIRS PERFORMED IN THE FACILITY, PRESENCE OF POST-TENSIONING,

LOCATION AND SIZE OF STRUCTURAL MEMBERS (BEAMS, COLUMNS, WALLS, ETC.),

SLAB THICKNESS, AND OTHER INFORMATION RELEVANT TO THE PROJECT.

5. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR SPECIFIED ON THE

DRAWINGS OR IN THE SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE

SAME CHARACTER AS SHOWN OR SPECIFIED IN SIMILAR CONDITIONS.

B. EXISTING CONDITIONS

1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF THE

EXISTING BUILDING AT THE JOB SITE AND REPORT ANY DISCREPANCIES FROM

ASSUMED CONDITIONS SHOWN ON THE DRAWINGS TO ENGINEER PRIOR TO THE

FABRICATION AND ERECTION OF ANY MEMBERS. EXISTING DIMENSIONS SHOWN ON

THE DRAWINGS ARE FOR GENERAL REFERENCE ONLY AND SHOULD NOT BE USED FOR

FINAL CONSTRUCTION OR DETAILING.

PART IX - MISCELLANEOUS (CONTINUED)

C. RESPONSIBILITY OF THE CONTRACTOR FOR STABILITY OF THE STRUCTURE DURING

CONSTRUCTION

1. REPAIRS OF STRUCTURAL ELEMENTS OF THE PROJECT HAVE BEEN DESIGNED

BY THE STRUCTURAL ENGINEER TO RESIST THE REQUIRED CODE VERTICAL AND

LATERAL FORCES THAT COULD OCCUR IN THE FINAL REPAIRED STRUCTURE ONLY.

THE ABILITY OF THE STRUCTURAL FRAME TO RESIST THE REQUIRED CODE FORCES

DERIVES FROM THE COMPLETE INSTALLATION OF THE REPAIRS. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL REQUIRED BRACING DURING

CONSTRUCTION TO MAINTAIN THE STABILITY AND SAFETY OF ALL STRUCTURAL

ELEMENTS DURING THE CONSTRUCTION PROCESS UNTIL THE REPAIR WORK IS

COMPLETELY INSTALLED AND ALL DESIGNATED CONCRETE ELEMENTS (IF ANY) HAVE

REACHED A MINIMUM OF 75% OF THEIR DESIGN STRENGTH.

D. RESPONSIBILITY OF THE CONTRACTOR FOR CONSTRUCTION LOADS

1. THE REPAIRS HAVE BEEN DESIGNED FOR THE LOADS IDENTIFIED WITHIN

THESE DRAWINGS THAT ARE ANTICIPATED TO BE APPLIED TO THE STRUCTURE WORK

IS COMPLETED. THE CONTRACTOR SHALL NOT OVERLOAD THE STRUCTURE DURING

CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING THE

ADEQUACY OF THE STRUCTURE TO SUPPORT ANY APPLIED CONSTRUCTION LOADS,

INCLUDING THOSE DUE TO CONSTRUCTION VEHICLES OR EQUIPMENT, MATERIAL

HANDLING OR STORAGE, SHORING OR RESHORING, OR ANY OTHER CONSTRUCTION

ACTIVITY. THE CONTRACTOR SHALL SUBMIT CALCULATIONS SIGNED AND SEALED BY

AN ENGINEER LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED VERIFYING

THE ADEQUACY OF THE STRUCTURE FOR ANY PROPOSED CONSTRUCTION LOADS THAT

ARE IN EXCESS OF THE DESIGN LOADS STATED IN THE RECORD DRAWINGS. THE

STRUCTURAL ENGINEER IS NOT RESPONSIBLE TO DESIGN OR CHECK THE STRUCTURE

FOR LOADS APPLIED TO THE STRUCTURE FOR ANY CONSTRUCTION ACTIVITY.

E. CONTRACTOR SUBSTITUTIONS

1. ANY MATERIALS OR PRODUCTS SUBMITTED FOR APPROVAL THAT ARE

DIFFERENT FROM THE MATERIAL OR PRODUCTS SPECIFIED IN THE STRUCTURAL

CONTRACT DOCUMENTS WILL BE CONSIDERED FOR APPROVAL ONLY IF THE FOLLOWING

CRITERIA ARE SATISFIED:

a. A COST SAVINGS TO THE OWNER IS DOCUMENTED AND SUBMITTED WITH

THE REQUEST.

b. THE MATERIAL OR PRODUCT HAS BEEN APPROVED BY THE

INTERNATIONAL CODE COUNCIL (ICC) AND THE ICC REPORT IS SUBMITTED

WITH THE REQUEST.

1) THE ICC ESR THAT IS SUBMITTED MUST REFERENCE THE BUILDING

CODE UNDER WHICH THE PROJECT IS PERMITTED.

2) ICC REPORTS THAT HAVE BEEN DISCONTINUED AT THE TIME OF

PRODUCT INSTALLATION WILL NOT BE ACCEPTED.

2. SUBMITTALS NOT SATISFYING THE ABOVE CRITERIA WILL NOT BE

CONSIDERED.

F. THE STRUCTURAL ENGINEER’S ROLE DURING CONSTRUCTION

1. THE ENGINEER SHALL NOT HAVE CONTROL NOR CHARGE OF, AND SHALL NOT

BE RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,

OR PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH

THE WORK, FOR THE ACTS OR OMISSION OF THE CONTRACTOR, SUBCONTRACTOR, OR

ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY

OF THEM TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

2. PERIODIC SITE OBSERVATION BY FIELD REPRESENTATIVES OF WALTER P.

MOORE AND ASSOCIATES IS SOLELY FOR THE PURPOSE OF BECOMING GENERALLY

FAMILIAR WITH THE PROGRESS AND QUALITY OF THE WORK COMPLETED AND

DETERMINING, IN GENERAL, IF THE WORK OBSERVED IS BEING PERFORMED IN A

MANNER INDICATING THAT THE WORK, WHEN FULLY COMPLETED, WILL BE IN

ACCORDANCE WITH THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION

SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY

OR QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE

OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.

G. MAINTENANCE STATEMENT

1. ALL STRUCTURES REQUIRE PERIODIC MAINTENANCE TO EXTEND LIFESPAN AND

TO ENSURE STRUCTURAL INTEGRITY FROM EXPOSURE TO THE ENVIRONMENT. A

PLANNED PROGRAM OF MAINTENANCE SHALL BE ESTABLISHED BY THE BUILDING

OWNER. THIS PROGRAM SHALL INCLUDE ITEMS SUCH AS BUT NOT LIMITED TO

PAINTING OF STRUCTURAL STEEL, PROTECTIVE COATING FOR CONCRETE,

REPLACEMENT OF FAILED SEALANTS, CAULKED JOINTS, EXPANSION JOINTS,

CONTROL JOINTS, REPAIR OF SPALLS AND CRACKS IN CONCRETE, AND PRESSURE

WASHING OF EXPOSED STRUCTURAL ELEMENTS EXPOSED TO A HUMID ENVIRONMENT.

H. CONSTRUCTION SAFEGUARDS

1. CONSTRUCTION SAFEGUARDS GOVERNING SAFETY DURING CONSTRUCTION, THE

PROTECTION OF ADJACENT PUBLIC AND PRIVATE PROPERTIES, PROTECTION OF

BUILDING OCCUPANTS, AND PROTECTION OF PEOPLE ADJACENT TO THE

CONSTRUCTION AREA SHALL BE PER REQUIREMENTS OF THE BUILDING CODE AS

ADOPTED BY THE AUTHORITY HAVING JURISDICTION OVER THE LOCATION OF THE

WORK.

GENERAL STRUCTURAL NOTES

PART X - DRAWING INTERPRETATION

A. DRAWING VIEWS LABELED AS “TYPICAL”

1. PARTIAL PLANS, ELEVATIONS, SECTIONS, DETAILS, OR SCHEDULES LABELED

WITH “TYPICAL” AT THE BEGINNING OF THEIR TITLE SHALL APPLY TO ALL

SITUATIONS OCCURRING ON THE PROJECT THAT ARE THE SAME OR SIMILAR TO

THOSE SPECIFICALLY SHOWN. THE APPLICABILITY OF THE CONTENT OF THESE

VIEWS TO LOCATIONS ON THE PLAN CAN BE DETERMINED FROM THE TITLE OF THE

VIEWS. SUCH VIEWS SHALL APPLY WHETHER OR NOT THEY ARE KEYED IN AT EACH

LOCATION. DECISIONS REGARDING APPLICABILITY OF THESE “TYPICAL” VIEWS

SHALL BE DETERMINED BY THE STRUCTURAL ENGINEER.

B. STRUCTURAL ABBREVIATIONS, SYMBOLS, AND NOTATIONS

@ AT

& AND

# NUMBER

Ø ROUND, DIAMETER

' FT

" IN.

(E) EXISTING

(N) NEW

ACI AMERICAN CONCRETE INSTITUTE

AISC AMERICAN INSTITUTE FOR STEEL CONTRUCTION

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

BLDG BUILDING

BOT BOTTOM

CJ CONTROL JOINT

COL COLUMN

CONC CONCRETE

DN DOWN

EA EACH

ELEV ELEVATION

EJ EXPANSION JOINT

EW EACH WAY

EXIST EXISTING

F’C SPECIFIED CONCRETE COMPRESSIVE STRENGTH

FT FT

FV FIELD VERIFY

FY YIELD STRENGTH

FU ULTIMATE STRENGTH

GEN GENERAL

HORZ HORIZONTAL

ICRI INTERNATIONAL CONCRETE REPAIR INSTITUTE

IN INCH

INFO INFORMATION

KIPS 1000 POUNDS FORCE

KSI KIPS PER SQUARE IN.

LBF POUNDS FORCE

MAX MAXIMUM

MIN MINIMUM

MISC MISCELLANEOUS

MSD MATERIAL SAFETY DATA

MSDS MATERIAL SAFETY DATA SHEET

NTS NOT TO SCALE

OC ON CENTER

PLF POUNDS PER LINER FOOT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE IN.

QTY QUANTITY

REINF REINFORCEMENT

REQD REQUIRED

SHT SHEET

SIM SIMILAR

SPA SPACING

STD STANDARD

TI TASK ITEM

TOC TOP OF CONCRETE

TOS TOP OF STEEL, TOP OF SLAB

TYP TYPICAL

VERT VERTICAL

WT WEIGHT

C. STRUCTURAL SYMBOLS

1. TASK ITEMS ARE INDICATED BY:

3. REGULATORY REQUIREMENTS: COMPLY WITH GOVERNING OWNER, LOCAL,

STATE, FEDERAL, AND EPA NOTIFICATIONS AND REGULATIONS BEFORE BEGINNING

SELECTIVE DECONSTRUCTION / DEMOLITION. COMPLY WITH HAULING AND DISPOSAL

REGULATIONS OF AUTHORITIES HAVING JURISDICTION.

A

B

123456789101112131415

333'-5" (FV)

12'-1 15/16" (FV) 15'-0 9/16" (FV) 8'-6" (FV)

27'-2 1/2" (FV) 65'-1" (FV) 148'-10" (FV) PRESS BOX 65'-1" (FV) 27'-2 1/2" (FV)

21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 23'-6 9/16" (FV) 12'-1 15/16" (FV)

8'-6" (FV) 15'-0 9/16" (FV)

/8

(F V

/8

(F

V

/8

(F

V

/2

(F

V

8'-6" (FV)

(F

V

W

A L

L

F V

(F

V

(F

V

(F V

(F

V

(F

V

(F

V

/2

(F

V

R O

W S

(F

V

(F

V

(F

V

/2

(F V

W

A L

L

8'-6 7/8" (FV) 139'-6" (FV) 139'-6" (FV)

74'-5 1/2" (FV) 10'-11" (FV) 63'-6 1/2" (FV)

1.0 5.0

5.0 1.0

1.0

5.0

5.0

1.05.0

1.0

1.0

5.0

2.0A

1.0 4.0

6.5

1.0

5.0

5.0

1.0

5.0

5.0

1.0

1.0

6.5

5.0

5.0 5.0 5.0

2.0B

5.0

5.0

1.0

8/S-301

1.0 1.0

1.0

9.0 5.0 3.0

5.0

1.0

5.0

6.5

S-300

S-300

S-300

TYP

TYP

TYP

NOTE:

1. TAG NUMBER REPRESENT THE TASK ITEM CORRESPONDING TO A REPAIR DETAIL PROCEDURE, SEE BELOW FOR TABLE:

S-301

TASK ITEM

1.0

2.0A

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

7/S-301

4/S-300

5/S-300

9/S-300

8/S-300

10/S-300

12/S-300

14/S-300

3/S-301

ACTION/DETAILED INFORMATION

2/S-300

6.5 17/S-300

(F V

(F

V

R O

W S

(F

V

' 1

(F V

(F V

(F

V

(F V

(F

V

(F

V

R O

W S

(F V

(F

V

(F V

(F

V

R O

W A

(F V

(F

V

(F V

(F V

/1

(F

V

(F

V

(F

V

(F

V

W

A L

L

F V

REFER TO S-104

FOR PRESSBOX

EXPANDED PLAN

S-301

TYPICAL SHORING AT

CANILEVER AREA, REFER

TO

LOAD TABLE - 2 ON 15/S301

FOR SHORING LOADS

AND LOCATIONS

POINT 3

POINT 4

/1

(F

V

2.0B 8/S-301

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issued/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Stantec Architecture, Inc.

1100 Louisiana Street, Suite One

Houston, Texas 77002, Tel: 713 871 8484 • www.stantec.com

Walter P Moore and Associates, Inc.

1301 McKinney Street, Suite 1100 Houston, TX 77010 TBPE Firm Registration No. 1856 713.630.7300

11/06/2026

/4 /2

:1

:4

P M

3/32" = 1'-0"

4400 S Martin Luther King Jr Pkwy

Beaumont, TX 77705

WEST STANDS FRAMING PLAN - SOFFIT

REPAIRS

Lamar University

LAMAR UNIVERSITY, FOOTBALL STADIUM

REPAIRS

234601127

S-100

NO SCALE1

WEST STANDS FRAMING PLAN - SOFFIT REPAIRS

N

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

(F V

(F

V

333'-5" (FV)

12'-1 15/16" (FV)15'-0 9/16" (FV)8'-6" (FV)

27'-2 1/2" (FV)279'-0" (FV)27'-2 1/2" (FV)

21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)23'-6 9/16" (FV)12'-1 15/16" (FV)

8'-6" (FV)15'-0 9/16" (FV)

/8

(F V

/8

(F

V

/8

(F

V

/2

(F

V

1'-11 7/16" (FV)

13'-1 1/8" (FV)8'-6" (FV)

(F

V

(F

V

W

A L

L

F V

(F

V

(F

V

(F V

(F

V

(F V

8'-6 7/8" (FV) 84'-10 1/2" (FV) 1" (FV) 54'-6 1/2" (FV) 54'-6 1/2" (FV) 1" (FV) 84'-10 1/2" (FV) 8'-6 7/8" (FV)

296'-1 3/4" (FV)

5.0

1.0

5.0

5.0

1.0

5.0

1.0

5.0

6.5

1.0 1.0

5.0

5.0 3.0

1.0

6.5

5.0

1.0

5.0 5.0

1.0

5.0

1.0 10.0

1.0

5.0

5.0

1.0

10.0

1.0

1.0

1.0

1.0

1.01.0

5.0

S-300

TYP

S-300

TYP

NOTE:

1. TAG NUMBER REPRESENT THE TASK ITEM CORRESPONDING TO A REPAIR DETAIL PROCEDURE, SEE BELOW FOR TABLE:

TASK ITEM

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

7/S-301

4/S-300

5/S-300

9/S-300

8/S-300

10/S-300

12/S-300

14/S-300

3/S-301

ACTION/DETAILED INFORMATION

2/S-300

6.5 17/S-300

(F

V

(F

V

(F

V

(F

V

W

A L

L B

E L

O W

F

V

(F V

(F

V

R O

W S

(F

V

(F

V

(F

V

R O

W S

(F

V

(F

V

(F V

(F

V

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issued/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Stantec Architecture, Inc.

1100 Louisiana Street, Suite One

Houston, Texas 77002, Tel: 713 871 8484 • www.stantec.com

Walter P Moore and Associates, Inc.

1301 McKinney Street, Suite 1100 Houston, TX 77010 TBPE Firm Registration No. 1856 713.630.7300

11/06/2026

/4 /2

:1

:4

P M

3/32" = 1'-0"

4400 S Martin Luther King Jr Pkwy

Beaumont, TX 77705

EAST STANDS FRAMING PLAN - SOFFIT

REPAIRS

Lamar University

LAMAR UNIVERSITY, FOOTBALL STADIUM

REPAIRS

234601127

S-101

NO SCALE1

EAST STANDS FRAMING PLAN - SOFFIT REPAIRSN

C

D

E

F

123456789101112131415

333'-5" (FV)

12'-1 15/16" (FV) 15'-0 9/16" (FV) 8'-6" (FV)

27'-2 1/2" (FV) 65'-1" (FV) 148'-10" (FV) PRESS BOX 65'-1" (FV) 27'-2 1/2" (FV)

21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 21'-10" (FV) 23'-6 9/16" (FV) 12'-1 15/16" (FV)

8'-6" (FV) 15'-0 9/16" (FV)

8'-6 7/8" (FV) 139'-6" (FV) 139'-6" (FV)

74'-5 1/2" (FV) 10'-11" (FV) 63'-6 1/2" (FV)

3.0

6.0 7.0 5.0

6.0

3.0

6.0

4.0

9.03.0 3.0

3.0

3.0

3.0 3.0

3.0

3.0

3.0

3.03.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

5.0

3.0

5.0

3.0

3.0 5.0 3.03.0

NOTE:

1. TAG NUMBER REPRESENT THE TASK ITEM CORRESPONDING TO A REPAIR DETAIL PROCEDURE, SEE BELOW FOR TABLE:

TASK ITEM

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

7/S-301

4/S-300

5/S-300

9/S-300

8/S-300

10/S-300

12/S-300

14/S-300

3/S-301

ACTION/DETAILED INFORMATION

2/S-300

6.5 17/S-300

(F V

(F

V

R O

W S

(F V

(F

V

(F V

(F

V

(F

V

(F

V

(F

V

(F

V

(F

V

(F V

R O

W A

(F

V

/2

(F

V

(F

V

(F

V

(F

V

(F V

(F V

F V

(F

V

(F

V

W

A L

L

F V

(F V

(F

V

R O

W S

(F V

(F

V

(F

V

(F

V

(F

V

(F

V

W

A L

L

F V

S-300

TYP

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issued/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Stantec Architecture, Inc.

1100 Louisiana Street, Suite One

Houston, Texas 77002, Tel: 713 871 8484 • www.stantec.com

Walter P Moore and Associates, Inc.

1301 McKinney Street, Suite 1100 Houston, TX 77010 TBPE Firm Registration No. 1856 713.630.7300

11/06/2026

/4 /2

:1

:4

P M

3/32" = 1'-0"

4400 S Martin Luther King Jr Pkwy

Beaumont, TX 77705

WEST STANDS FRAMING PLAN - TOP

Lamar University

LAMAR UNIVERSITY, FOOTBALL STADIUM

REPAIRS

234601127

S-102

NO SCALE1

WEST STANDS FRAMING PLAN - TOP

N

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

333'-5" (FV)

12'-1 15/16" (FV)15'-0 9/16" (FV)8'-6" (FV)

27'-2 1/2" (FV)279'-0" (FV)27'-2 1/2" (FV)

21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)21'-10" (FV)23'-6 9/16" (FV)12'-1 15/16" (FV)

8'-6" (FV)15'-0 9/16" (FV)

8'-6 7/8" (FV) 84'-10 1/2" (FV) 1" (FV) 54'-6 1/2" (FV) 54'-6 1/2" (FV) 1" (FV) 84'-10 1/2" (FV) 8'-6 7/8" (FV)

296'-1 3/4" (FV)

3.0

3.0

9.0

3.0 3.0 3.0 3.0

3.0

3.0

3.0

3.0

3.0

3.0 3.0

3.0

3.0

3.0

9.0

3.0

5.0

NOTE:

1. TAG NUMBER REPRESENT THE TASK ITEM CORRESPONDING TO A REPAIR DETAIL PROCEDURE, SEE BELOW FOR TABLE:

TASK ITEM

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

7/S-301

4/S-300

5/S-300

9/S-300

8/S-300

10/S-300

12/S-300

14/S-300

3/S-301

ACTION/DETAILED INFORMATION

2/S-300

6.5 17/S-300

(F

V

(F

V

(F

V

(F

V

(F V

(F

V

R O

W S

(F

V

(F

V

(F

V

R A

W S

(F

V

(F

V

(F V

(F

V

6.0 6.0

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issued/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Stantec Architecture, Inc.

1100 Louisiana Street, Suite One

Houston, Texas 77002, Tel: 713 871 8484 • www.stantec.com

Walter P Moore and Associates, Inc.

1301 McKinney Street, Suite 1100 Houston, TX 77010 TBPE Firm Registration No. 1856 713.630.7300

11/06/2026

/4 /2

:1

:5

P M

3/32" = 1'-0"

4400 S Martin Luther King Jr Pkwy

Beaumont, TX 77705

EAST STANDS FRAMING PLAN - TOP

Lamar University

LAMAR UNIVERSITY, FOOTBALL STADIUM

REPAIRS

234601127

S-103

NO SCALE1

EAST STANDS FRAMING PLAN - TOPN

10'-11" 10'-3" 10'-0" 10'-0" 10'-0" 15'-0" 15'-0" 15'-0" 10'-0" 20'-0" 10'-3" 10'-11"

/2

149'-0"

/2

4'-0"

8.0 SHORING POST, REF

GENERAL NOTES

/2

/2

NOTE:

1. TAG NUMBER REPRESENT THE TASK ITEM CORRESPONDING TO A REPAIR DETAIL PROCEDURE, SEE BELOW FOR TABLE:

TASK ITEM

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0 9.0

10.0

7/S-301

4/S-300

5/S-300

9/S-300

8/S-300

10/S-300

12/S-300 14/S-300

3/S-301

ACTION/DETAILED INFORMATION

2/S-300

6.5 17/S-300

EXISTING STEEL

FRAMING, TYP

EXISTING

CONCRETE

COLUMN,TYP

CONTRACTOR TO

REFER TO AISC

5TH EDITION FOR

DIMENSIONS OF

EXISTING BEAMS

EXISTING 8B13

EXISTING 8B13 EXISTING 8B13 EXISTING 8B13 EXISTING 8B13 EXISTING 8B13

EXISTING 8B13

EXISTING 8B13

EXISTING 8B13EXISTING 8B13 EXISTING 8WF17 EXISTING 8WF17 EXISTING 8WF17

EXISTING 8WF17EXISTING 8WF17EXISTING 8WF17

C

.4

EXISTING 8B13

EXISTING 8B13 EXISTING 8B13

EXISTING 8B13 EXISTING 8B13 EXISTING 8B13

EXISTING WF31

EXISTING 8B13

EXISTING 8B13

The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.

The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.

Copyright Reserved

ORIGINAL SHEET - ARCH E1

Title

Client/Project

Client/Project Logo

Issued/Revision By Appd YYYY.MM.DD

A

5 4 3 2 1

B

C

D

E

Revision

Project No. Scale

Drawing No.

Issue Status

Stantec Architecture, Inc.

1100 Louisiana Street, Suite One

Houston, Texas 77002, Tel: 713 871 8484 • www.stantec.com

Walter P Moore and Associates, Inc.

1301 McKinney Street, Suite 1100 Houston, TX 77010 TBPE Firm Registration No. 1856 713.630.7300

11/06/2026

/4 /2

:1

:5

P M

3/16" = 1'-0"

4400 S Martin Luther King Jr Pkwy

Beaumont, TX 77705

PRESS BOX LOWER LEVEL ROOF

FRAMING PLAN

Lamar University

LAMAR UNIVERSITY, FOOTBALL STADIUM

REPAIRS

234601127

S-104

N

NO SCALE1

PRESS BOX LOWER LEVEL ROOF FRAMING PLAN

CANTILEVERCANTILEVER

B B

A A

A

A

A A

ROUGHEN EXISTING

CONCRETE SURFACE

TO CSP 6. REFER TO

SPECIFICATIONS

REMOVE AND REPLACE

CONCRETE WITHIN

SHADED SECTION

SHOWN (TYP.)

CORNER PROFILE TO MATCH

EXISTING CONDITION

REMOVAL LIMITS (TYP.)

GRIND, CHIP, OR SAW CUT

AROUND PATCH PERIMETER

TO AT LEAST 1/2" BEYOND THE

SPALL/DELAMINATION OR UP

TO SOUND CONCRETE. INITIAL

GRINDING OR SAW CUTTING

SHALL BE PERPENDICULAR TO

SURFACE (TYP.)

REINFORCEMENT

LOCATIONS

APPROXIMATE (TYP.)

PROVIDE AUGMENTATION

IF REQUIRED. SEE 2/S-301

& 3/S-301

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING, GRINDING

OR SAW CUTTING FOR SPALL/DELAMINATION REPAIR.

2. REFER TO SECTION "SURFACE PREPARATION FOR PATCHING" FOR CLEANING AND

COATING ALL EXPOSED REINFORCEMENT.

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT WHERE

REQUIRED AS SPECIFIED IN SECTION "SURFACE PREPARATION FOR PATCHING."

4. WHERE DIMENSION "A" SHOWN IN DETAIL IS 4" OR LESS, THEN REPAIR ENTIRE WIDTH

OF BEAM.

A

M A

X

VARIES VARIES

FIELD VERIFY

WIDTH OF

EXISTING BEAM

M A

X V

A R

IE

S

VARIES

SEE (NOTE 4) BELOW

SPALL OR

DELAMINATION

(TYP.)

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING, GRINDING

OR SAW CUTTING FOR SPALL/DELAMINATION REPAIR.

2. REFER TO SECTION "SURFACE PREPARATION FOR PATCHING" FOR CLEANING AND

COATING ALL EXPOSED REINFORCEMENT.

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT WHERE

REQUIRED AS SPECIFIED IN SECTION "SURFACE PREPARATION FOR PATCHING."

4. PROVIDE SHORING AS SPECIFIED BY ENGINEER PRIOR TO COMMENCEMENT OF

ANY CONCRETE REMOVAL WORK.

5. NEW PATCH SHALL MATCH EXISTING FINISH.

REMOVE AND REPLACE

CONCRETE WITHIN SHADED

SECTION SHOWN

CHIP, GRIND OR SAW CUT AROUND

PATCH PERIMETER FOR AT LEAST

1/2" BEYOND THE

SPALL/DELAMINATION OR UP TO

SOUND CONCRETE. INITIAL

GRINDING OR SAW CUTTING SHALL

BE PERPENDICULAR TO SURFACE

FACE OF WALL

REINFORCEMENT LOCATIONS

APPROXIMATE (TYP.)

PROVIDE AUGMENTATION IF

REQUIRED. SEE 2/S-301

SPALL OR

DELAMINATION (TYP.)

REMOVAL LIMITS, ROUGHEN

EXISTING CONCRETE SURFACE

TO CSP 6. REFER TO

SPECIFICATIONS

INSTALL

PATCH FLUSH

WITH WALL

PAINT AS

REQUIRED

DO NOT OVERCUT CORNERS

SPALL OR DELAMINATION

REMOVAL LIMITS

EXISTING REINFORCEMENT

WALL ELEVATION

SECTION A-A

V A

R

IE

S

2" MAX

SPALL OR

DELAMINATION

EXISTING REINF APPROX.

LOCATIONS (TYP.)

APPROXIMATE EXTENT OF

HORIZONTAL AND VERTICAL

REMOVAL LIMITS

ELEVATION

V A

R

IE

S

NOTES:

1. PROTECT EXISTING REINFORCEMENT FROM DAMAGE DURING CHIPPING, GRINDING

OR SAW CUTTING FOR SPALL/DELAMINATION REPAIR.

2. REFER TO SECTION "SURFACE PREPARATION FOR PATCHING" FOR CLEANING AND

COATING ALL EXPOSED REINFORCEMENT.

3. PROVIDE 3/4" CLEARANCE AROUND ALL EXPOSED REINFORCEMENT WHERE

REQUIRED AS SPECIFIED IN SECTION…

This is the start of the file's text. The full file is on GovTribe.