This Scope of Work document outlines a comprehensive Regional Safe Streets for All (SS4A) Action Plan and Implementation Program to be developed for the Concho Valley Council of Governments (CVCOG) through funding from the U.S. Department of Transportation. The project encompasses a 13-county service area in Texas (Coke, Concho, Crockett, Irion, Kimble, Mason, McCulloch, Menard, Reagan, Schleicher, Sterling, Sutton, and Tom Green counties) plus associated cities and towns. The contractor will develop an integrated safety action plan and sustainable regional roadway safety program through comprehensive safety assessments, community engagement, and identification of evidence-based safety strategies. Key deliverables include a regional high-injury network, interactive GIS safety dashboard, stakeholder engagement plan, safety countermeasure catalog, regional safety project pipeline with concept-level plans for a minimum of five priority projects, funding strategy with grant-ready information for ten projects, quick-build project opportunities, implementation framework, performance measurement system, and jurisdiction-specific safety action plans. The project includes a minimum of 14 public meetings (one regional kick-off and one meeting per county), at least six Regional Safety Work Group meetings, development of a public awareness campaign, and training for CVCOG and participating jurisdictions. The estimated project kickoff is February-March 2027, with public meetings scheduled July-December 2027, a draft report due February 29, 2028, and a final report due April 30, 2028. The Safety Action Plan is to be publicly available by June 28, 2028.

CVCOG anticipates a total project budget in the high-six-figure range, with proposers required to submit detailed cost proposals reflecting the level of effort, staffing, travel, public engagement, deliverables, and resources necessary for project completion. The contract period runs through May 2028 with monthly status update meetings with CVCOG. All deliverables must comply with ADA Title II and WCAG 2.1 Level AA digital accessibility standards and be provided in both user-friendly and editable formats. The contractor is required to structure work products to ensure long-term sustainability without reliance on proprietary systems or ongoing software licenses, as no continued grant funding is guaranteed following project completion. Any third-party software, subscriptions, or ongoing costs required for maintenance must be identified and justified by the contractor prior to implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Regional Safe Streets for All Action Plan and Implementation Program

1. BACKGROUND AND OBJECTIVES.

Concho Valley Council of Governments (CVCOG) has been awarded funding by the U.S.

Department of Transportation (USDOT) for the development of a comprehensive safety action plan through the Safe Streets and Roads for All (SS4A) program. The plan must align with USDOT’s zero-deaths vision and prioritize streets, trade corridors, and roads by conducting safety assessments, collecting and analyzing data on traffic patterns and crash hotspots, engaging local communities and private stakeholders, and identifying low-cost, high-impact strategies to improve safety. The CVCOG region includes Coke, Concho, Crockett, Irion, Kimble, Mason, McCulloch, Menard, Reagan, Schleicher, Sterling, Sutton, and Tom Green counties, as well as the cities and towns within them (the “Service Area”).

CVCOG is committed to ensuring roadway safety, especially in our rural coverage areas, to promote economic development, enhance quality of life, and protect the well-being of all who travel through the area. By prioritizing the safety of underserved communities, we can work to reduce roadway fatalities and injuries that disproportionately affect these populations. It is essential to recognize the importance of these activities and allocate resources accordingly to ensure all communities have the infrastructure and resources needed to prevent accidents and save lives.

CVCOG intends to engage a qualified and experienced Contractor (“Contractor”) to develop a comprehensive Regional Safe Streets for All (“SS4A”) Action Plan and establish a sustainable regional roadway safety program for participating local governments within the Service Area. The purpose of this project is to move beyond the preparation of a traditional planning document and establish a practical framework that local governments can use to identify, prioritize, fund, implement, and evaluate roadway safety improvements over time.

The resulting Action Plan should serve as a living implementation tool rather than a standalone study.

The Contractor shall work collaboratively with CVCOG, participating local governments, transportation agencies, public safety organizations, community stakeholders, and other relevant partners throughout the project. The Contractor shall emphasize practical implementation, local capacity building, measurable outcomes, and the long-term usability of project data, tools, and recommendations.

The final work product shall establish a regional safety program that can continue to be maintained by CVCOG and participating jurisdictions after completion of the Contractor's contract.

Additional Resources:

SS4A Grant Program: https://www.transportation.gov/grants/SS4A USDOT’s Zero Deaths and Safe System: https://highways.dot.gov/safety/zero-deaths Safe Streets and Roads for All Clearinghouse: https://www.ss4aclearinghouse.org/ https://www.transportation.gov/grants/SS4A https://highways.dot.gov/safety/zero-deaths https://www.ss4aclearinghouse.org/

2. CONTRACTOR RESPONSIBILITIES.

2.1. Project Management and Regional Coordination.

The Contractor shall provide overall project management and coordination necessary to successfully complete the project. At a minimum, the Contractor shall:

• Develop a detailed project schedule, work plan, communication protocol, and deliverable schedule.

• Provide regular progress updates to CVCOG through monthly recurring meetings

(virtual or in-person) through plan completion.

• Coordinate with relevant transportation, public safety, emergency response, planning, engineering, transit, education, and community organizations.

• Establish a process for documenting decisions, issues, responsibilities, and project progress.

• Coordinate work among Contractor team members and subcontractors.

• Identify potential schedule, data, stakeholder, or implementation issues and recommend corrective actions.

• Recommend an appropriate regional governance and coordination structure for maintaining roadway safety efforts following completion of the project.

2.2. Regional Safety Assessment and Data Analysis.

The Contractor shall conduct a comprehensive assessment of roadway safety conditions throughout the Service Area.

The assessment shall consider available crash, roadway, traffic, land use, demographic, transportation, and other relevant data. The Contractor shall identify patterns and contributing factors associated with fatal and serious injury crashes and other significant safety concerns. The assessment should consider, as applicable:

• Fatal and serious injury crashes;

• Pedestrian and bicycle crashes;

• Intersection-related crashes;

• Speed-related crashes;

• Rural roadway safety;

• School-area safety;

• Transit and pedestrian access;

• Older adults and other vulnerable road users;

• Roadway and intersection characteristics;

• Lighting and visibility;

• Traffic control and signage;

• Roadway geometry;

• Emergency response and post-crash considerations;

• Land use and development patterns; and

• Other regional or jurisdiction-specific safety concerns.

The Contractor shall develop a regional High-Injury Network and/or High-Risk Network, as supported by available data and appropriate methodology.

The Contractor shall document the methodology, assumptions, data sources, limitations, and criteria used to identify priority locations.

Regional Safety Dashboard The Contractor shall develop an interactive, user-friendly GIS/data tool or dashboard that allows CVCOG and participating jurisdictions to access and visualize relevant safety information.

At a minimum, the tool should allow users to view, as applicable:

• Crash locations and trends;

• High-risk locations and corridors;

• Priority intersections;

• Pedestrian and bicycle safety concerns;

• Recommended projects;

• Project status;

• Safety countermeasures; and

• Other information necessary to support ongoing regional safety planning.

The Contractor shall provide all necessary source data, GIS layers, metadata, documentation, and training necessary for CVCOG to maintain the tool following completion of the project.

2.3. Public and Stakeholder Engagement.

The Contractor shall develop and implement a meaningful stakeholder and community engagement process designed to identify local safety concerns, build support for recommended strategies, and establish local ownership of the Action Plan. Engagement shall include appropriate opportunities for:

• Local governments;

• Counties;

• TxDOT and other transportation agencies;

• Law enforcement;

• Fire and emergency medical services;

• School districts and educational institutions;

• Transit providers;

• Public health organizations;

• Planning and engineering professionals;

• Bicycle and pedestrian interests;

• Community organizations;

• Businesses and major employers; and

• Members of the public.

A. Public Meetings and Engagement.

i. At a minimum, the Contractor shall conduct one (1) hybrid (in-person and virtual) regional kick-off meeting and one (1) hybrid (in-person and virtual) public/stakeholder meeting in each of the thirteen (13) counties within the CVCOG Service Area resulting in a minimum total of fourteen (14) public meetings.

ii. The Contractor may coordinate meetings for multiple counties on consecutive days when practical and appropriate, provided that each county receives a dedicated opportunity for public and stakeholder participation and the approach does not diminish meaningful local engagement. The Contractor shall use reasonable efforts to schedule meetings at times that are accessible to working members of the public, including evening meetings when appropriate (generally after 5:00 p.m.).

iii. When practicable, the Contractor should utilize a central and reasonably accessible location within each county to encourage participation from communities throughout the county. CVCOG will assist in securing meeting facilities.

iv. The Contractor shall advertise each meeting throughout the county, including in each city and town within the county, to maximize public awareness and attendance.

v. The Contractor shall be responsible for meeting coordination, logistics, facilitation, and advertising, with CVCOG providing reasonable assistance with outreach and promotion.

vi. The Contractor shall document meeting attendance, feedback received, and key issues identified and incorporate relevant input into the project.

vii. The Contractor shall establish and maintain an accessible method for community members who are unable to attend a meeting to provide input, such as a dedicated project email address, online comment form, QR code, or similar mechanism. The Contractor shall make this opportunity available as part of its meeting outreach and shall document and consider feedback received through these methods in the development of the project.

viii. The Contractor shall use a combination of regional and local engagement methods appropriate for the participating communities.

ix. The engagement process should include opportunities for participants to identify specific locations, corridors, policies, and practices that create safety concerns.

B. Regional Safety Work Group.

The Contractor shall establish and facilitate a Regional Safety Work Group to provide ongoing coordination, local perspectives, and stakeholder input throughout development and implementation of the plan. The Work Group is intended to provide a representative forum for participating jurisdictions and regional partners to identify safety concerns, review project findings and recommendations, coordinate implementation priorities, and support long-term regional collaboration.

At a minimum, the Contractor shall seek representation from each participating city and county within the CVCOG Service Area, with each jurisdiction encouraged to designate one primary representative. Additional representatives should be considered from organizations and agencies with a significant role in roadway safety, as appropriate, including:

• CVCOG;

• TxDOT;

• Local public works, engineering, planning, or transportation staff;

• Law enforcement;

• Emergency medical services and fire departments;

• Transit providers;

• School districts or other educational institutions;

• Public health organizations;

• Regional transportation planning organizations, where applicable; and

• Other regional or community organizations identified by CVCOG and the

Contractor.

The Contractor shall recommend a practical membership structure that maintains broad regional representation while allowing the Work Group to remain functional and productive. The Contractor shall coordinate with CVCOG to identify appropriate representatives and establish the Work Group during the initial phase of the project.

The Contractor shall conduct at least six (6) Regional Safety Work Group meetings during the contract period. Meetings may be conducted virtually, or in a hybrid format. Meetings should be scheduled at key points in the project to allow the Work Group to review and provide input on major project components, including the regional safety assessment, identified safety priorities, proposed strategies and countermeasures, project pipeline, implementation framework, and final Action Plan.

The Contractor shall be responsible for meeting coordination, agendas, facilitation, presentations, meeting materials, and documentation. The Contractor shall maintain a record of Work Group participation, significant comments and recommendations, and how such input was considered in the project.

The Contractor shall also provide recommendations for maintaining the Regional Safety Work Group, or a similar regional coordination structure, following completion of the project to support continued collaboration, project implementation, funding coordination, and ongoing monitoring of regional roadway safety.

C. Public Awareness Campaign.

The Contractor shall develop and implement a public awareness campaign to increase awareness of the project, encourage public participation, and communicate project findings and opportunities for input. The campaign should utilize a variety of appropriate communication methods and may include project-branded PDFs, informational boards/posters, social media content, website content and recommendations, digital and printed flyers, handouts, presentations, graphics, email communications, press releases, or other outreach materials. CVCOG does not prescribe a minimum number or specific mix of public awareness activities;

proposers shall recommend an appropriate outreach strategy, including the anticipated frequency, types, and quantity of materials and activities necessary to effectively reach communities throughout the Service Area. The Contractor shall coordinate with CVCOG regarding the use and distribution of project materials and shall provide editable electronic versions of materials developed for the project.

D. Communications and Publicity.

The Contractor shall obtain prior approval from CVCOG before initiating communications with any elected official, judge, regional representative, public official, or other public figure on behalf of or in connection with the project. The Contractor shall also obtain CVCOG’s prior written approval before publishing, distributing, or publicly releasing any project-related materials, including news articles, press releases, flyers, social media content, public notices, or other promotional or informational materials.

E. Website Integration and Public Accessibility.

The Contractor shall assist CVCOG in developing recommendations and providing guidance for a dedicated, user-friendly webpage or website tab to house and present the final Regional Safety Action Plan. The webpage should provide a clean, organized, and accessible format that allows the public to easily navigate, understand, and access the plan, project information, supporting materials, and related resources. The Contractor shall coordinate with CVCOG staff to recommend appropriate content, layout, navigation, and functionality to support public awareness and long-term accessibility of the plan.

2.4. Safety Strategy and Countermeasure Development.

Based on the regional assessment and stakeholder input, the Contractor shall identify evidence-based strategies and countermeasures appropriate for the region.

Recommendations shall consider the differing needs of urban, suburban, rural, and small-community environments. The Contractor shall develop a Regional Safety Countermeasure Catalog that provides practical guidance regarding:

• Safety problem addressed;

• Appropriate application;

• General design considerations;

• Typical implementation considerations;

• Relative cost;

• Maintenance considerations;

• Potential funding sources; and

• Applicable implementation agencies.

The catalog should emphasize treatments that can realistically be implemented by local governments with varying levels of staff, funding, and technical resources.

2.5. Policy, Planning, and Process Review.

The Contractor shall review relevant local and regional policies, plans, standards, ordinances, and procedures that may affect roadway safety from all participating jurisdictions. The review may include:

• Comprehensive and transportation plans;

• Subdivision regulations;

• Development regulations;

• Street design standards;

• Capital improvement processes;

• Speed management policies;

• Traffic-calming policies;

• Sidewalk and pedestrian requirements;

• Community bicycle safety and use standards;

• School-zone practices;

• Transit-related design standards; and

• Other applicable policies or procedures.

The Contractor shall identify opportunities to incorporate safety into routine planning, development, engineering, and capital improvement decisions.

Recommended policy changes shall be presented in a practical format that identifies:

• Existing condition or policy;

• Identified safety issue;

• Recommended change;

• Responsible agency;

• Implementation considerations; and

• Priority or timeframe.

Where appropriate, the Contractor should provide model policy, ordinance, or procedural language that can be adapted by participating jurisdictions.

2.6. Regional Safety Project Pipeline.

A central component of the project shall be development of a Regional Safety Project Pipeline. The Contractor shall identify, evaluate, and prioritize specific safety projects based on documented safety needs, stakeholder input, feasibility, potential safety benefit, cost, funding opportunities, and implementation considerations. Projects may include, as appropriate:

• Intersection improvements;

• Pedestrian and bicycle improvements;

• Sidewalk and crossing improvements;

• Roadway redesign;

• Traffic calming;

• Speed management;

• Lighting;

• School-zone improvements;

• Transit access improvements;

• Rural roadway improvements;

• Access management; and

• Other safety improvements.

The Contractor shall develop project profiles for priority projects containing, at a minimum:

• Project description;

• Safety problem addressed;

• Location and map;

• Supporting crash or safety data;

• Recommended countermeasure;

• Conceptual improvement;

• Planning-level cost estimate;

• Potential funding sources;

• Responsible agency;

• Implementation considerations;

• Anticipated project timeframe;

• Project readiness;

• Key next steps; and

• Applicable performance measures.

The project pipeline shall be provided in a format that CVCOG can continue to update and use following completion of the project.

2.7. Concept-Level Project Development.

For a minimum of five (5) of the highest-priority projects identified through the planning process, the Contractor shall develop concept-level plans sufficient to allow a participating jurisdiction to advance the project toward funding, preliminary engineering, or further design. Concepts may include, as appropriate:

• Intersection layouts;

• Pedestrian crossing improvements;

• Road diets;

• Traffic-calming treatments;

• Roundabouts;

• Sidewalk or bicycle connections;

• School-zone improvements;

• Lighting improvements; and

• Other safety treatments.

Conceptual plans are not intended to constitute final engineering or construction documents unless specifically authorized.

The Contractor shall make reasonable efforts to distribute the identified high-priority projects selected for concept-level development throughout the 13-county region.

The Contractor shall identify significant design, right-of-way, environmental, utility, permitting, ownership, or other issues that may affect implementation.

2.8. Demonstration and Quick-Build Projects.

To demonstrate the practical application of the Action Plan, the Contractor shall provide a list of opportunities for low-cost, temporary, or quick-action safety improvements for each participating jurisdiction. Potential projects may include:

• Temporary pedestrian crossings;

• Traffic-calming treatments;

• Temporary curb extensions;

• Delineation improvements;

• School-zone treatments;

• Pedestrian visibility improvements;

• Community bicycle safety improvements; or

• Other appropriate safety demonstrations.

2.9. Funding and Grant Implementation Strategy.

The Contractor shall develop a regional funding strategy that identifies potential federal, state, local, and other funding opportunities applicable to identified safety projects. The Contractor shall:

• Identify appropriate funding programs;

• Evaluate general eligibility and funding considerations;

• Identify potential local match requirements;

• Identify project readiness requirements;

• Establish a funding strategy for priority projects;

• Identify opportunities to combine or sequence funding sources; and

• Develop a regional funding calendar or similar tool that CVCOG can maintain.

For a minimum of ten (10) identified high-priority projects, the Contractor shall develop grant-ready project information, including project narratives, safety justification, cost information, maps, performance measures, and other information that can be incorporated into future funding applications.

Where appropriate, the Contractor may assist CVCOG or participating jurisdictions with preparation of selected funding applications during the contract period.

2.10. Regional Safety Toolkit.

The Contractor shall develop a practical Regional Safe Streets Toolkit for use by CVCOG and participating jurisdictions following completion of the project. The Toolkit should provide accessible guidance for addressing common roadway safety issues and should include, as appropriate:

• Safety countermeasures;

• Typical applications;

• Planning-level cost information;

• Design considerations;

• Implementation considerations;

• Funding opportunities;

• Model policies and procedures;

• Project development resources; and

• Other templates or tools developed through the project.

The Toolkit should be designed for practical use by local government staff rather than as a technical planning document alone.

2.11. Implementation Framework and Regional Governance.

The Contractor shall develop a long-term implementation framework that establishes how the Action Plan will be maintained and advanced following completion of the project. The framework shall address:

• Roles and responsibilities of CVCOG and participating jurisdictions;

• Regional coordination;

• Project pipeline maintenance;

• Data updates;

• Funding opportunity tracking;

• Performance monitoring;

• Annual reporting;

• Stakeholder coordination;

• Action Plan updates; and

• Identification of future planning and implementation needs.

The Contractor shall recommend a sustainable regional structure, such as through the Regional Safety Work Group or similar mechanism, to support continued coordination after the Contractor's contract ends. The final document shall provide a recommended timeframe indicating when future updates or reviews of the plan should occur.

2.12. Performance Measurement and Annual Reporting.

The Contractor shall establish a practical performance measurement framework for monitoring implementation of the Action Plan. Measures should include both safety outcomes and implementation indicators. Potential measures include:

• Fatalities;

• Serious injuries;

• Fatal and serious injury crash trends;

• High-risk locations addressed;

• Safety projects completed;

• Safety projects funded;

• Miles of safety improvements implemented;

• Policy changes adopted;

• Grant applications submitted;

• Funding obtained;

• Demonstration projects completed; and

• Other appropriate measures.

The Contractor shall suggest baseline conditions, recommended targets where appropriate, data sources, reporting frequency, and responsible parties for execution of the plan, upon adoption by the CVCOG Executive Committee.

The Contractor shall also develop a template for an Annual Regional Safety Report that can be used to communicate progress and update the Action Plan.

2.13. Local Government Safety Action Plans.

As part of the overall plan, the Contractor shall prepare individual customized safety action plans for each participating jurisdiction. Each jurisdictional Safety Action Plan should identify, as applicable:

• Key safety issues;

• Priority locations;

• Recommended projects;

• Recommended policy or process changes;

• Potential funding sources;

• Quick-build opportunities;

• Project readiness;

• Immediate next steps; and

• Recommended implementation timeframe.

The intent is to provide each participating jurisdiction with a concise, actionable roadmap that can be used by elected officials, management, engineering, public works, planning, and other local staff.

2.14. Training and Knowledge Transfer.

The Contractor shall provide training and knowledge-transfer activities sufficient to enable CVCOG and participating jurisdictions to continue using the tools, data, and processes developed through the project. Training shall address, as appropriate:

• Use of the regional safety dashboard;

• Use and maintenance of the project pipeline;

• Safety data interpretation;

• Countermeasure selection;

• Project prioritization;

• Funding identification;

• Grant development;

• Use of the Regional Safety Toolkit; and

• Annual performance monitoring.

The Contractor shall provide training materials, user guides, templates, and other documentation necessary for continued use of the project products.

2.15. Final Regional Safe Streets Action Plan.

The Contractor shall prepare a final Regional Safe Streets for All Action Plan and Implementation Program incorporating the findings and recommendations developed throughout the project. The final Action Plan shall:

• Meet all applicable SS4A Action Plan requirements;

• Summarize regional safety conditions;

• Document the safety analysis methodology;

• Identify priority safety issues;

• Present stakeholder and community engagement findings;

• Identify recommended strategies and countermeasures;

• Document recommended policy and process changes;

• Establish the Regional Safety Project Pipeline;

• Identify priority implementation projects;

• Present funding and grant strategies;

• Establish performance measures;

• Define implementation responsibilities;

• Establish an ongoing governance and maintenance structure; and

• Provide a clear implementation schedule.

The final document shall be concise, accessible, visually engaging, and designed for use by local governments, elected officials, transportation agencies, and community stakeholders.

The final report shall not serve as the sole deliverable or repository for project information.

All underlying data, GIS files, project information, templates, tools, and other implementation resources shall be delivered separately in usable electronic formats.

2.16. Long-Term Sustainability.

The Contractor shall structure all work products and recommendations to support continued use by CVCOG and participating jurisdictions after completion of the contract.

The Contractor shall not rely on proprietary systems, software, data formats, or processes that prevent CVCOG from accessing, maintaining, updating, or transferring project information following completion of the project.

All data, GIS layers, models, templates, project information, methodologies, and other materials developed specifically for the project shall be provided to CVCOG in commonly accessible and editable formats.

The Contractor shall identify any third-party software, subscriptions, licenses, data sources, or other ongoing costs necessary to maintain project tools. CVCOG strongly prefers solutions that can be maintained without ongoing costs, as no continued grant funding is guaranteed for this project. Any proposed solution requiring ongoing costs must be clearly identified and justified by the Contractor prior to implementation.

The Contractor's final work shall establish a maintainable regional safety program and implementation pipeline, rather than simply documenting existing conditions or producing a static planning report.

3. DIGITAL ACCESSIBLITY REQUIREMENTS.

All final deliverables, including reports, plans, appendices, and supporting electronic documents intended for publication or distribution by CVCOG, shall comply with the applicable digital accessibility requirements of ADA Title II and WCAG 2.1 Level AA standards. The Contractor shall ensure that all submitted documents are accessible to individuals with disabilities and suitable for publication on CVCOG's website without requiring additional accessibility remediation by CVCOG.

4. DELIVERABLES.

At a minimum, the Contractor shall provide the following deliverables:

• Project Management Plan and Schedule;

• Regional Safety Data and Existing Conditions Assessment;

• Regional High-Injury/High-Risk Network;

• Regional Safety Dashboard and GIS Data;

• Stakeholder and Community Engagement Plan and Summary;

• Regional Safety Countermeasure Catalog;

• Policy, Plan, and Process Assessment;

• Regional Safety Project Pipeline;

• Priority Project Profiles and Concept-Level Plans;

• Quick-Build/Demonstration Project Plans and Evaluation;

• Regional Safety Funding and Grant Strategy;

• Regional Safety Toolkit;

• Regional Implementation and Governance Framework;

• Performance Measurement and Annual Reporting Framework;

• Jurisdiction-Specific Safety Action Kits;

• Training and Knowledge-Transfer Materials; and

• Final Regional Safe Streets for All Action Plan and Implementation Program.

All electronic deliverables shall be provided in both final user-friendly formats and, where applicable, editable/native formats.

5. BUDGET.

CVCOG anticipates a total project budget in the high-six-figure range for the services described in this Scope of Work. The stated budget is intended to provide proposers with a general understanding of the anticipated scale of the project; CVCOG is not establishing a fixed contract amount through this statement. Proposers shall submit a detailed cost proposal that reflects the level of effort, staffing, travel, public engagement, deliverables, and other resources necessary to successfully complete the project. Proposers are encouraged to identify any assumptions, exclusions, optional services, or recommended enhancements that may affect the proposed cost.

6. TIMELINE AND MILESTONES.

Description Timeline Estimated Project Kickoff February – March 2027 Estimated Public Meeting Dates July 2027 – December 2027 Estimated Safety Work Group Meetings July 2027 – December 2027 **Draft Report Due February 29, 2028 **Final Report Due April 30, 2028 CVCOG Executive Committee Review/Decision May 2028 Final Safety Action Plan Publicly Available June 28, 2028 Monthly Status Update Meetings w/ CVCOG Commencement – May 2028

** indicates firm date.

Participating Jurisdictions:

County List 1 Coke County, TX 2 Concho County, TX 3 Crockett County, TX 4 Irion County, TX 5 Kimble County, TX 6 Mason County, TX 7 McCulloch County, TX 8 Menard County, TX 9 Reagan County, TX 10 Schleicher County, TX 11 Sterling County, TX 12 Sutton County, TX 13 Tom Green County, TX

Community List 14 City of Bronte, TX

City of Robert Lee, TX 15 City of Eden, TX

City of Paint Rock, TX 16 Ozona, TX (Unincorporated) 17 City of Mertzon, TX 18 City of Junction, TX 19 City of Mason, TX 20 City of Brady, TX

City of Melvin, TX 21 City of Menard, TX 22 City of Big Lake, TX 23 City of Eldorado, TX 24 Sterling City, TX 25 City of Sonora, TX 26 City of San Angelo, TX

File details come from the government source that posted it. Updated .