About this file

This is a Scope of Work document for the Texas Juvenile Justice Department (TJJD) regarding electrical service installation at the Gainesville State School Facility. The project involves installing a complete electrical system to serve a new six-plex portable building, including setting a 40-foot utility pole with cross arms and primary ASCR cable, installing a 37.5 kVA transformer, adding primary fuse cutouts and lightning arrestors, constructing secondary risers with a 400-amp panel board and branch breakers, building a panel rack, and excavating trenches to run conduit and wire from the panel rack to six separate panels on the new building. All work must comply with the National Electrical Code and applicable state and local codes. The scope requires locating existing water and sewer lines prior to excavation.

The contractor must provide all materials, labor, and equipment including trenching equipment, excavators, bucket trucks, and digger trucks as part of the quoted price. No specific pricing terms, response dates, or contract duration are detailed in this scope of work document. The project requires a comprehensive quote that encompasses all aspects of the electrical installation work and associated equipment and labor costs.

View the file

Other files

File Type Posted
ESBD_549663_1786996845938_IFB GNS OIG ELC hook up.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TJJD is needing electrical service ran to a new 6 plex portable building being installed at the Gainesville State School Facility. The new electrical service will need to include the following.

1. Set a new 40 foot pole at front of the property. Install cross arms and primary ascr cable.

2. Set a 37.5 kva transformer

3. Install primary fuse cutout and lightning arrestor.

4. Build risers up the pole for secondary. Set a 400 amp panel board with branch breakers.

5. Build a panel rack.

6. Dig trenches from panel rack, lay conduit, pull wire, proper grounding per code, and terminate all connections to 6 different panels located on the new 6 plex building.

There is existing water and sewer lines that will need to be located.

All work shall meet all state and local codes per the NEC.

All material, labor, trencher, excavator, bucket truck, digger truck must be included in your quote.