This is Addendum No. 1 to Solicitation No. 802-27-77098 issued by the Texas Parks and Wildlife Department (TPWD) for Helicopter Mule Deer Surveys. The addendum provides clarifications to the original solicitation and modifies key specifications. The scope of work requires contractors to conduct 160 flight hours of mule deer aerial surveys, with 80 hours designated for the Panhandle region and 80 hours for the Trans-Pecos region, using a Robinson R-66 helicopter. The original estimate of 170 flight hours has been reduced to 160 hours. Contractors and the TPWD Project Manager must coordinate all planned work activities. The addendum removes previous exhibit price sheets for bighorn/aoudad captures and deer, elk, and pronghorn captures, replacing them with a single line item for the 160-hour mule deer survey contract.
The addendum significantly modifies insurance requirements, reducing Aircraft General Liability coverage from $10,000,000 to $1,000,000 per occurrence and reducing Aircraft Passenger Liability from $10,000,000 with no sublimit to $100,000 per person/$400,000 per occurrence. The document removes three contractor requirement sections (8.11, 8.12, and 8.13) that previously specified aircraft types, equipment provisions, and fuel responsibilities, consolidating contract obligations. Respondents must complete and return the addendum acknowledgment with their bid submissions; failure to do so results in disqualification. The State reserves the right to award on the basis of low line item bid, low total bid, or any combination deemed to provide best value, and may reject any bid items at its sole discretion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_538453_1784752900432_802-27-77098_Mule_Deer_Survey_7.22.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 01 Solicitation No. 802-27-77098 Page 1 of 3
Texas Parks and Wildlife Department 4200 Smith School Road
Austin, Texas 78744
ADDENDUM
Addendum Number: 1 Dated: July 22, 2026 Solicitation Number: 802-27-77098
Solicitation Title: Helicopter Mule Deer Surveys Purchaser: Vanessa Contreras, CTCD, CTCM
PURPOSE OF ADDENDUM: CLARIFICATIONS
Except as provided herein, all terms and conditions of the document referenced herein, remain unchanged and in full force and effect. The following are specifications to this solicitation. This Addendum may be attached to and form a part of the referenced solicitation document and any resulting awarded contract and may be considered in your response.
1. Section 7.1 Scope of Work and Specifications
7.1. The mule deer aerial survey shall require approximately four (4) to six (6) daylight flying hours for an estimated total of one hundred seventy (170) flight hours. Contractor and TPWD Project Manager will coordinate planned work activity.
NEW: 160 Flight Hours
2. Section 8. Contractor Requirements
Removal of Sections 8.11, 8.12 and 8.13
8.11 Contractor shall be responsible for providing aircraft for low level flying, netting, and transporting animals designated by TPWD personnel. Aircraft shall be Hughes 500E, MD 500E, MD 530F, Robinson R66, helicopter(s), or equivalent in TPWD’s determination for desert bighorn/aoudad sheep captures. A Robinson R44 Raven II, any helicopter approved for sheep captures or their equivalents shall be used for deer, elk, and pronghorn captures. All aircraft provided under the contractor must meet FAA regulations and standards as stipulated in FAR, Part 135.
During the entire contract period, aircraft must be maintained per the maintenance requirements of FAR, Part 135.
8.12 Contractor shall provide and maintain in safe working condition net gun and associated net gun accessories (e.g., net canisters, net weights, O-rings, etc.), long lines and all other relative equipment. TPWD will provide capture equipment such as nets, hobbles, blindfolds, and transport bags/slings.
8.13 Contractor shall provide fuel for capture operation. TPWD will provide fuel trailer/truck and driver for bighorn sheep captures. Contractor shall provide fuel trailer/truck and driver for all other captures. Refer to Section I Subsection 10.6 Remote Fueling Capabilities.
1. Section 13.1 Insurance
The following limits have been updated.
Aircraft General Liability Single Limit Bodily Injury & Property Damage $10,000,000 Each Occurrence NEW: 1,000,000 Each Occurrence
Aircraft Passenger Liability $10,000,000 with no sublimit NEW: $100,000 Per Person/ $400,000 Per Occurrence
2. Removal of Exhibit B’s Price Sheets described as:
• Exhibit B – BigHorn/aoudad price sheet (turbine helicopter)
• Exhibit B – deer, elk, and pronghorn price sheet (Robinson R44 Raven II)
NEW
Respondent (Company/Firm):
THIS EXHIBIT SHALL BE COMPLETED AND RETURNED WITH THE RESPONSE. FAILURE
TO RETURN THIS EXHIBIT WILL RESULT IN THE DISQUALIFICATION OF THE RESPONSE.
Respondent is to enter $0 (zero) if the item will be provided at no charge or if the price for that line item is included in price of another line item.
Quantities listed below are estimates only; for evaluation purposes. Cost evaluation will be based on a portion and not all of the prices requested. The State reserves the right to make an award on the basis of low line item bid, low total of line items, or in any other combination which provide the best value for the State and to reject any and all bid items in the sole discretion of the State.
Line Item Description Quantit y Unit Unit Price Extension
1.
Conduct 160 hours (80 hours in the Panhandle and 80 hours in the Trans-Pecos) of mule deer surveys with a Robinson R-66
160 Hour $ $
Respondents are to acknowledge receipt of this Addendum. Return a signed copy of this notice with your response submission.
I acknowledge receipt of this addendum.
Respondent’s Authorized Signature Date
Company Name
| 1. Section 7.1 Scope of Work and Specifications |
| 2. Section 8. Contractor Requirements |
| 1. Section 13.1 Insurance |
| The following limits have been updated. |
| Aircraft General Liability Single Limit Bodily Injury & Property Damage $10,000,000 Each Occurrence |
| Aircraft Passenger Liability $10,000,000 with no sublimit |
| Exhibit B – BigHorn/aoudad price sheet (turbine helicopter) |
| Exhibit B – deer, elk, and pronghorn price sheet (Robinson R44 Raven II) |
File details come from the government source that posted it. Updated .