About this file

This Addendum #1 document issued by the Hays County Purchasing Office provides clarifications and responses to bidder questions regarding Invitation for Bid (IFB) 2026-B08 for the removal and replacement of hot mix asphalt on Campo del Sol Parkway in Sunfield, Texas. The project requires milling six inches of existing pavement and replacing it with four inches of TXDOT Type B hot mix asphalt and a two-inch overlay of TXDOT Type D Superpave hot mix covering approximately 5,410 square yards. The mandatory pre-bid meeting was held on May 27, 2026, with written questions due by May 28, 2026, at 5:00 p.m. Central Time. Sealed proposals must be submitted by June 8, 2026, at 10:00 a.m., either electronically through BidNet Direct with hard copy delivery within 24 hours or manually with one original and one digital copy. The anticipated contract award date is July 2026, with all paving operations required to be completed by September 25, 2026. The project location includes a school zone, which may require adjusted work hours established during the pre-construction meeting.

Key clarifications in the addendum address material specifications, including PG 64-22 binder for both Type B and Type D Superpave mixes, acceptable RAP (reclaimed asphalt pavement) allowances of 20-25 percent for Type B and 15 percent for Type D, and tack coat application rates between 0.04 and 0.14 gallons residual per square yard based on surface conditions. Work hours are established as 7:00 a.m. to 7:00 p.m., with roads requiring B Mix placement each night to maintain driveability without road closures. Bidders must include all project costs on a turn-key basis, including material supply, removal and hauling of milled materials, and testing. Striping is excluded from this bid and will be handled under a separate contract (IFB 2025-B12). Acknowledgment of receipt of this addendum must be signed and returned with proposals; failure to do so may result in the proposal being deemed non-responsive. The Hays County Purchasing Office's new address is 1901 Dutton Drive, Suite E, San Marcos, Texas 78666, and the procurement email is purchasing.bids@hayscountytx.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

IFB 2026-B08 Sunfield, Campo del Sol Parkway – Remove and Replace Hot Mix

HAYS COUNTY PURCHASING OFFICE

Stephanie Hunt, CPPB, Purchasing Agent

1901 Dutton Drive, Suite E San Marcos, Texas 78666

512-393-2267 ● purchasing.bids@hayscountytx.gov

June 1, 2026

Please find attached Addendum #1 to IFB 2026-B08 Sunfield, Campo del Sol Parkway – Remove and Replace Hot Mix. All questions were answered by Hays County staff.

Attached to Addendum 1:

• Questions & Answers

• Pre-Bid Meeting Sign-In Sheet

Acknowledgement of receipt of this addendum must be signed and returned with your proposal. Failure to submit this acknowledged addendum with your submission may result in the proposal being deemed non-responsive and removed from consideration.

Signature

Company Name Date mailto:purchasing.bids@hayscountytx.gov

Questions & Answers

Questions:

1. What binder should be used on this project?

• For the PG Binders for the Type B and the Type D Superpave, PG 64-22 is good for both mixes.

2. Will there be a material transfer device (shuttle buggy)?

• A shuttle buggy is not required, but preferred.

3. What is the acceptable amount of RAP (reclaimed asphalt pavement)?

• For Type B, 20% to 25% is acceptable.

• For Type D Superpave, 15% is acceptable.

4. Are we required to pay for testing?

• Yes, testing is part of the contract.

5. What are the work hours?

• 7:00 AM – 7:00 PM.

• Some jobs may require different working hours but those will be established by the

County during the pre-con meeting.

• This project location does have a school zone, so adjusted hours may be necessary to accommodate.

6. On all jobs are you wanting B Mix down each night/day?

• Yes, the roads need to be drivable overnight as there will not be road closures.

7. What are the expectations for manholes?

• Try to match what is already there (Guadalupe-Blanco River Authority).

• The County Transportation Department has been tasked with the maintenance/repairs of manholes in the project area.

• The County will adjust the expectations as needed prior to the NTP being issued.

8. What type of D Mix overlay should be used?

• Superpave for all D Mix overlays.

9. Do any of the projects have ride quality testing on them?

• No.

10. Does the County want the removed road materials?

• No, all milling is to be removed and hauled off by the vendor.

11. Jacobs Well Curve – Vendor Eligibility A few months ago we submitted a bid for the Jacobs Well Curve project, but our proposal was not accepted. We are now an approved TxDOT vendor and would like to confirm that we are eligible to bid this project and that our proposal will be considered.

• This project is not in conjunction with TxDOT, therefore vendors do not need to be pre-qualified by TxDOT.

12. Striping Scope We did not see striping items included in the bid documents. Will pavement markings be issued under a separate contract, or should we anticipate an upcoming addendum?

• The County is currently under contract for roadway striping services, pursuant to IFB 2025-B12 Roadway Striping.

13. RAP Allowance in Surface Mixes Please confirm whether RAP is permitted in the SP TY-D PG 70-22 surface mix and the TY-B PG 64-22 mix per TxDOT specifications for these projects.

• See Question 3.

14. Prime or Tack Coat Requirements Is tack required on all milled areas prior to placement of

TY-B? If so, please provide the required application rate per SY.

• Yes, the exact residual rate per project will be based on surface conditions. Application rate can be adjusted between .04 and .14 Gal residual per SY.

15. Working Hours What are the allowable working hours for each project, including any restrictions related to school zones, noise ordinances, or local traffic control requirements?

• See Question 5.

16. Disposition of Millings Will the millings become county property, and if so, please provide the designated stockpile location. If not, please confirm that the millings become the property of the contractor.

• See Question 10.

17. Temporary Tabs Are temporary tabs required on the TY-B lift and again on the final surface course upon completion?

• Temporary reflective tabs are not required for this project.

18. The above project, and the other six projects advertised for letting on June 8th, are described in the scope for the contractor to handle all the removal, trucking, and installation, but they do not mention supplying the materials. Will the County be supplying the materials?

• No, per Section E. Attachment A: IFB 2026-B08 Bid Form, “Pricing per square yard should include a turn-key install and include all costs of the project.”

• Your bid should be all inclusive.

19. Please provide the PG Oil Type required for the Type B HMAC and Type D Superpave.

• See Question 1.

20. Hi, I am writing to request the PREBID SIGN IN sheet and/or the PLANHOLDER's LIST for the referenced project.

• Please see the attached pre-bid meeting sign-in sheet.

• We do not download the Planholder list prior to the bid closing as it can change by the second.

21. Are Message Board 7-day advance notices required on each project?

• Yes

22. We’re reporting on several projects from Hays County where the docs show Hays County

Purchasing office as being located at 1901 Dutton Dr., Suite E, San Marcos, TX 78666, but our system has the same address that appears on the County website: 712 S. Stagecoach Trail Ste 1012, San Marcos, TX 78666. Could you please tell me which address is correct?

• The address in the solicitation is our new address effective next week.

23. We’ve also been seeing two different Purchasing emails appear on projects such as purchasing@hayscountytx.gov and the most recent one purchasing.bids@hayscountytx.gov”.

Can you also please verify which is the correct one to use?

mailto:purchasing@hayscountytx.gov mailto:purchasing.bids@hayscountytx.gov

• Purchasing.bids@hayscountytx.gov is the new formal procurement email, however the email identified in the procurement document is the one that should be utilized for any communication related to the procurement.

mailto:Purchasing.bids@hayscountytx.gov

File details come from the government source that posted it. Updated .