This Request for Proposals (RFP) is issued by the Texas Parks and Wildlife Department (TPWD) Purchasing and Contracting division for helicopter bighorn sheep and aoudad sheep aerial survey services and external load work throughout the Trans-Pecos region of Texas. TPWD seeks to award multiple contracts on an as-needed basis for low-level aerial surveys in mountainous terrain at altitudes of 3,000 to 7,000 feet above sea level, aerial gunning services for exotic ungulates and predators, and long-lining services for habitat improvement projects such as water guzzler construction and maintenance. Survey operations are scheduled for October through November for bighorn sheep surveys and April through May for lamb assessment flights, with approximately two to eight daylight flying hours per day and no more than six hours of actual survey time. The RFP was issued on May 20, 2026, with questions due by May 27, 2026 at 2:00 PM Central Time and proposals due by June 3, 2026 at 2:00 PM Central Time. The initial contract term runs from the date of award through August 31, 2027, with renewal options for up to three additional one-year periods, contingent on mutual written agreement and fund availability. Aircraft inspection by TPWD personnel will occur prior to award, and the successful contractor will be contacted at least seven days prior to the start of survey operations to coordinate planned work activity.
Pricing shall be quoted on a per-flight-hour basis for low population density areas (average of three or fewer animals captured per hour) or on a flexible billable rate for areas with mixed population densities, subject to TPWD Project Manager approval. Ferry time from the pilot's home base to the project base of operations and return, as well as ground support expenses, are not billable to TPWD; however, refueling time during survey operations and ferry time between project base relocations are included in the hourly rate. The contractor must provide all aircraft (turbine helicopters such as Hughes 500E, Hughes MD 500E, MD 530F, Bell 206, or Robinson R66), pilots, personnel, equipment, fuel, and consumables necessary for successful operations. Minimum qualifications require five years of experience in helicopter survey services for desert bighorn, aoudad, mule deer, or elk in mountainous terrain, FAA Part 135 certification for survey and gunning projects and Part 133 certification for external load work, pilot commercial license with current medical certificate and minimum 1,000 hours of wildlife-oriented flight time including five years of desert bighorn sheep or similar species survey experience, and comprehensive insurance including $1,000,000 aircraft general liability, $100,000 per person aircraft passenger liability, and workers' compensation at statutory limits. No VetHUB subcontracting plan is required under this solicitation. Evaluation criteria are weighted as follows: compensation and fees (15 percent), technical proposal (15 percent), qualifications and experience (35 percent), and pilot expertise and key personnel safety records (35 percent).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_514403_1780326221729_802-26-74010 DBS Aerial Surveys Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Texas Parks and Wildlife Department Purchasing and Contracting C-1
4200 Smith School Road Austin, Texas 78744
REQUEST FOR PROPOSALS
RFP No. 802-26-74010
Helicopter Bighorn Sheep/Aoudad Services
NIGP Class/Item: 905-10; 905-28
RFP Issue Date: 05/20/2026 Questions Due: 05/27/2026; 2:00 PM C.T.
Proposal Due Date: 06/03/2026; 2:00 PM C.T.
Purchaser: Jennifer M. Robinson, CTCD, CTCM
512.960.7483 Purchasing.BidBox@tpwd.texas.gov
ATTENTION: It is the responsibility of interested parties to periodically check the Electronic State Business Daily (ESBD) website for updates to this solicitation prior to submitting a response. The Respondent’s failure to periodically check the ESBD will in no way release the selected contractor from “addenda or additional information” resulting in additional cost to meet the requirements of the RFP.
mailto:Purchasing.BidBox@tpwd.texas.gov
RFP No. 802-26-74010 Page 2 of 54
Table of Contents
SECTION I – GENERAL INFORMATION AND STATEMENT OF WORK
1. Introduction
2. Background
3. Solicitation Method and Intent
4. Contract Term
5. Qualifications and Experience
6. Aircraft and Pilot Requirements
7. Scope of Work and Specifications
8. Contractor Requirements
9. PERFORMANCE MEASURES
10. TPWD Responsibilities
11. Adding New Products/Services to Contract After Award
12. Modifications of Contract Terms and/or Amendments
13. Insurance
14. Subcontracting
15. VetHUB Subcontracting Plan
16. Travel
17. Contract Administration
18. Invoicing and Payment
SECTION II – PROPOSAL REQUIREMENTS
1. Schedule of Events
2. Inquiries
3. Proposal Content
RFP No. 802-26-74010 Page 3 of 54
4. Proposal Submission
5. Delivery of Proposals
6. Evaluation and Award
SECTION III – GENERAL TERMS AND CONDITIONS
EXHIBIT A – EXECUTION OF PROPOSAL
EXHIBIT B – BIGHORN/AOUDAD PRICING SHEET (TURBINE HELICOPTER)
EXHIBIT C – COMPANY PROFILE
EXHIBIT D – KEY PERSONNEL
EXHIBIT E – PAST PROJECTS WITH CORRESPONDING REFERENCES
EXHIBIT F – EQUIPMENT LIST
EXHIBIT G – CERTIFICATE(S)/LICENSE(S)
EXHIBIT H – SAFETY RECORDS
EXHIBIT I – TECHNICAL PROPOSAL
EXHIBIT J – RESPONSE SUBMISSION CHECKLIST
ATTACHMENT 1 – AIRCRAFT SAFETY BRIEFING CHECKLIST
RFP No. 802-26-74010 Page 4 of 54
SECTION I – GENERAL INFORMATION AND STATEMENT OF WORK
1. INTRODUCTION
1.1 Texas Parks and Wildlife Department (TPWD) is soliciting bids to establish blanket contract(s) for statewide Desert Bighorn Sheep and/or Aoudad Sheep Aerial Survey in the state of Texas as well as external load work for special projects. TPWD intends to award multiple Contracts to ensure availability within the varying terrain and geographical locations. Services will be performed on an “as-needed” basis in accordance with the scope of work and terms and conditions as set forth herein.
Contractor(s) shall provide all aircraft, pilots and personnel, equipment, consumables to include fuel, and any other need necessary or incidental to complete successful survey operations.
2. BACKGROUND
2.1. Trans-Pecos region of Texas currently supports 11 free-ranging populations of desert bighorn sheep, which occur within the Baylor, Beach, Sierra Diablo, Carrizo, 9 Point Mesa, Capote Peak, Eagle and Van Horn mountains, and the Texas Parks and Wildlife Department’s (TPWD) Black Gap and Elephant Mountain Wildlife Management Areas (WMAs) and Big Bend Ranch State Park (Bofecillos Mountains).
Wildlife managers have recognized the need for systematic surveys to determine desert sheep numbers and trends for many years. During the 1950s many techniques were introduced to derive bighorn sheep population estimates, but most survey methods were unreliable. Desert bighorn sheep surveys improved through time as technology advanced. Research conducted by state game agencies in Arizona and Nevada indicated that late summer helicopter surveys were the best method for obtaining desert bighorn sheep population data. August/September helicopter surveys consistently produced greater total observations, reliable sex and age ratios, and better correlation of fall lambs to annual recruitment. However, because of safety concerns, annual surveys have shifted to an October/November timeframe with additional lamb assessment flights conducted in March/April to operate in cooler temperatures.
Systematic desert bighorn sheep aerial population surveys did not occur in Texas until August 1990. In more recent years, new technology (e.g., CyberTracker, ruggedized Android tablets, etc.) has been incorporated into helicopter surveys to supplement survey efforts and help calculate population estimates.
2.2. Helicopter services are needed from October to November to conduct low-level desert bighorn sheep surveys in the Trans-Pecos Region of Texas and from April to May for lamb assessment flights.
2.3. Aerial gunning services are needed to lethally remove exotic ungulates, predators, feral animals and other species when deemed necessary as part of the restoration and management of native species.
2.4. Long-lining (slinging) services are needed as part of ongoing habitat improvement projects, such as water guzzler construction, maintenance and repair, site inspections, etc.
3. SOLICITATION METHOD AND INTENT
3.1 The Request for Proposal (RFP) solicitation method allows qualified respondents to submit a written proposal addressing pricing, qualifications, experience, location, availability, approach, and other factors
RFP No. 802-26-74010 Page 5 of 54 that will be employed to ensure successful accomplishment of the requirements set forth herein. TPWD will review, compare, and evaluate responses based on the criteria and weights identified in this RFP.
3.2 It is TPWD’s intent to award multiple contracts for Desert Bighorn Sheep Surveys throughout the Trans- Pecos region of Texas on “as needed” basis. It is TPWD’s sole discretion to determine best value and best interest to the State.
3.3 Contractor Selection for Individual Projects: After award of Contract(s), TPWD will identify individual projects as they become available and issue a Scope of Work detailing the work to be performed, the service schedule, and the service location for each project, and request quotes from awarded Contractors. TPWD will select a Contractor that is determined to provide the best value and having capability and capacity to provide service(s) to the agency for each project. A purchase order will be issued to include a scope of work, the work schedule, and the geographical location.
4. CONTRACT TERM
4.1 INITIAL CONTRACT TERM: The contract shall commence on Date of Award and continue through August 31, 2027, unless sooner terminated under the terms of the contract.
4.2 RENEWAL OPTION: Contract may be renewed for up to three (3) additional one (1) year periods, provided both parties agree in writing prior to contract expiration date, based on funds availability and vendor performance. Any extensions shall be in accordance with the original terms and conditions plus any approved changes. If renewal options are exercised, TPWD will provide a new timeline and delivery schedule to the vendor.
4.3 CONTRACT EXTENSIONS: In the event that the contract(s), if any, resulting from the award of this RFP shall terminate or be likely to terminate prior to the making of an award for a new contract for the identified products and/or services, TPWD may, with the written consent of the awarded supplier(s), extend the contract for a period of time as may be necessary to permit TPWD continued supply of the identified products and/or services (not to exceed twelve month extension period). Any extensions shall be under the same terms and conditions, plus any approved changes.
4.4 TERMINATION: The contract shall terminate upon full performance of all requirements contained in the contract, unless otherwise extended or renewed, as provided in accordance with the contract terms and conditions.
4.5 AMENDMENTS: The contract may be amended in writing with the mutual consent of the parties by the issuance of a contract amendment document. Any amendments shall be within the original scope of services outlined herein.
4.6 QUANTITIES: Quantities listed are projected order quantities. TPWD reserves the right to increase or decrease quantities prior to award depending on bid results and budget constraints. Unless this RFP states otherwise, the resulting contract award does not guarantee volume or a commitment of funds.
TPWD will only pay for actual goods or services performed.
4.7 BILLABLE RATE: Depending on population densities of targeted wildlife species, a flexible billable rate may apply. Billable rate to be determined as needed per the scope of services and all overages for fuel surcharges. Contractor is responsible for all other costs associated with the successful completion of the work contained herein. Billable rate options follow:
4.7.1 Per flight hour – in areas with low population densities (average of 3 or less animals captured per hour) price will be on a per flight hour basis.
4.7.2 Flexible Billable Rate – in cases when high/medium and low population density are both encountered during the same project, the billable rate can be adjusted to fit the corresponding density. The billing rate will be evaluated and approved by TPWD Project Manager.
RFP No. 802-26-74010 Page 6 of 54
4.7.3 Flight or ferry time for the following will not be paid:
4.7.3.1 From the Pilot’s home base to the starting work area or any ground support expenses.
4.7.3.2 From the ending work area and the pilot’s home base.
4.8. GLOSSARY:
4.8.1 BAFO: Best and Final Offer
4.8.1 Business Day(s) – Monday through Friday, except State and National holidays per the Texas State Auditor’s website at: https://hr.sao.texas.gov/Holidays/
4.8.1 Calendar Day(s) – Monday through Sundays, including holidays and weekends
4.8.2 CPA – Comptroller of Public Accounts
4.8.2 CFR: Code of Federal Regulations
4.8.3 FAA: Federal Aviation Administration
4.8.4 FAR: Federal Aviation Regulation
4.8.5 GPS: Global Positioning Satellite
4.8.6 RFP: Request for Proposal
4.8.7 SIR: Self-Insured Retention
4.8.8 TPWD: Texas Parks and Wildlife Department
4.8.8 Vendor – A potential provider of goods or services to the State
5. QUALIFICATIONS AND EXPERIENCE
5.1 MINIMUM QUALIFICATIONS AND EXPERIENCE: Respondent (and awarded contractor) shall meet the following minimum qualifications:
5.1.1 Contractor shall be engaged in the business of performing helicopter survey services of desert bighorn, aoudad, mule deer, elk, or a combination thereof, and experienced in flying mountainous terrain at altitudes ranging from 3,000 to 7,000 feet above sea level for a minimum of five (5) years within the past five (5) years. Recent start-up businesses do not meet the requirements of this solicitation. A start-up business is defined as a new company that has no previous operations history or expertise in the relevant business and is not affiliated with a company that has that history of expertise.
5.1.2. Contractor shall have available the necessary qualified personnel, skills, qualifications, organization, facilities, aircraft, and equipment to fulfill all requirements under this RFP and any resulting contract. Contractor shall provide safety record and references from other state and federal game agencies, landowners, ranch managers, etc., in performing safe and effective low-level, high altitude, and mountainous terrain aerial operations.
5.1.3. Pilot must have a minimum of 1,000 hours conducting low level mountainous flying for each specific project scope and appropriate aircraft.
5.1.4 Contractor shall comply with all Federal Aviation Administration (FAA) rules and regulations with respect to aircraft inspections and safety maintenance as required in a certified FAA Air Taxi https://hr.sao.texas.gov/Holidays/
RFP No. 802-26-74010 Page 7 of 54
Operation. The contracting business must possess an FAA Commuter or On Demand Operator Certificate (14 Code of Federal Regulations (CFR) Part 135 Certificate, Air Carrier and Operator Certification) for survey and gunning projects and Part 133 Certificate for external load work.
The business must adhere to all standards of safety and aircraft maintenance required by these certificates. Respondent shall supply copies of this documentation that is current and valid throughout the entire contract period on Exhibit G – Certificate(s)/License(s).
5.1.6 Contractor shall be in good financial standing. TPWD reserves the right to request a copy of the respondent’s audited or un-audited financial statement.
6. AIRCRAFT AND PILOT REQUIREMENTS
6.1 AIRCRAFT REQUIREMENTS: Respondent shall use aircraft that meet the following minimum requirements:
6.1.1 Contractor shall be responsible for providing aircraft for low level flying, netting, and transporting animals designated by TPWD personnel. Aircraft shall be a turbine helicopter such as Hughes 500E, Hughes MD 500E, Hughes MD 530F, Bell 206, Robinson R66, or TPWD approved helicopter in TPWD’s determination for desert bighorn sheep and aoudad surveys.
6.1.2 All aircraft provided under the contractor must meet FAA regulations and standards as stipulated in Federal Aviation Regulation (FAR), Part 135. During the entire contract period, aircraft must be maintained per the maintenance requirements of FAR, Part 135.
6.1.3 A global positioning system (GPS) is required to load project areas into the aircraft’s GPS.
6.1.4 An operable radio for FAA communication is required as well as an emergency locator transmitter.
6.1.5 Aircraft is subject to inspection by TPWD personnel prior to awarding any resulting contract(s) from this RFP.
6.2 PILOT REQUIREMENTS:
6.2.1 Pilot must have a valid FAA Commercial Pilot License with current medical certificate and must be approved under an Operator Air Carrier Certificate under FAR, Part 135 , and must maintain valid certifications and licenses throughout the entire contract period, up to and including any renewals exercised. Appropriate documentation is requested on Exhibit G – Certificate(s)/License(s). and all FAA requirements can be found at https://www.faa.gov/licenses_certificates/airline_certification/135_certification/general_info.
6.2.2 Pilot must have a minimum of 1,000 hours of flight time conducting wildlife-oriented work, and specifically at least (5) years of experience in performing desert bighorn sheep, aoudad, mule deer, or elk surveys.
6.3 SUPPORTING DOCUMENTATION: Respondent shall complete and submit Exhibit C – Company Profile, Exhibit D – Key Personnel, Exhibit E – Past Projects with Corresponding References, Exhibit F
– Equipment List, Exhibit G – Certificate(s)/License(s), and Exhibit H – Safety Records with proposal to provide documentation to support the above qualifications. (Ref: Section II, Subsection 3.3.).
7. SCOPE OF WORK AND SPECIFICATIONS
7.1 Contractor shall perform low-level aerial surveys for Desert Bighorn Sheep and/or Aoudad Sheep in the Trans-Pecos but may include the Panhandle region as deemed necessary, as determined necessary by https://www.faa.gov/licenses_certificates/airline_certification/135_certification/general_info
RFP No. 802-26-74010 Page 8 of 54
TPWD, the TPWD observers shall perform limited opportunistic aerial gunning of exotic ungulates and other animals in accordance with the following specifications.
7.2 For the purpose of contract administration, the base operations for the survey (TPWD Home Base) are Van Horn, TX, Big Bend Ranch State Park (BBRSP), and Black Gap Wildlife Management Area (WMA). The quoted hourly rate for flying time applies ONLY to those hours flown while conducting the survey and associated aerial services (i.e. refueling, aerial gunning, water development maintenance, long-lining, and survey home base relocations), and only hours flown while conducting the survey and associated services are billable. Flight or ferry time between the pilot’s home base and project base of operations and any ground support expenses will not be paid by TPWD. Flight or ferry time for refueling during survey operations and flight or ferry time between TPWD project base relocation shall be included in hourly quote. Contractor shall be responsible for having enough fuel each day at the flight departure site (Van Horn, Big Bend Ranch SP, Black Gap WMA and other locations) to ensure at least six (6) hours of flying time in the survey area.
7.3 Survey flights in Presidio and Brewster counties will originate and terminate at either Big Bend Ranch State Park or Black Gap WMA, respectively. Survey flights in Culberson and Hudspeth counties will originate and terminate at Van Horn, TX. Survey flights in other counties will originate at locations agreeable to pilot and TPWD observer.
7.4 Desert Bighorn sheep surveys are conducted in the four-county area in mountainous terrain of West Texas. Contractor shall be capable of sustained controlled low-level flight at altitudes ranging from 3,000 to 7,000 feet above sea level with air temperatures ≤104°F. Two (2) observers from TPWD will accompany the pilot on all survey flights. Flights in other counties shall be made by taking total counts over pre-designated areas within those counties.
7.5 Aerial survey shall require approximately two (2) to six (8) daylight flying hours per day, with no more than 6 hours conducting actual survey, not counting ferry or refueling time. Daily surveys can either be divided into morning and afternoon flights, or 1 continuous 6-hr survey flight with intermittent fuel/lunch breaks in remote areas.
7.6 Survey is subject to change and flight may be rescheduled due to adverse weather conditions or unsuitability for visual observations at the survey area by TPWD. In the event that inclement weather precludes flying, flight will be rescheduled for the earliest practical time by oral agreement between pilot and TPWD observer.
7.7 Aerial gunning activities will be performed in conjunction with desert bighorn survey efforts.
7.8 Remote landings for retrieval of radio telemetry collars, or to perform repairs on wildlife water catchments, to include long-lining, will be required.
7.9 Initial Desert Bighorn Sheep aerial survey shall be completed no later than August 31, 2026.
7.10 Work Schedule: TPWD will contact selected contractor upon Notice of Award to coordinate project start time with all services for the initial project. A Contractor’s ability to meet this project schedule may be a factor in determining award. Work can be conducted outside of traditional TPWD work hours, which are Monday through Friday between 8:00 AM C.T. to 5:00 PM C.T.
7.11 Successful contractor will be contacted at least seven (7) days prior to the start of survey to coordinate planned work activity.
8. CONTRACTOR REQUIREMENTS
8.1 Contractor agrees to conduct all its services under the awarded contract by and through appropriate communications with TPWD. No work, installation, or other services shall be undertaken by Contractor
RFP No. 802-26-74010 Page 9 of 54 except with the prior written authorization by TPWD. Contractor understands and agrees that work, installation, or other service performed without prior written authorization of TPWD is work outside the scope of this contract and shall be performed exclusively at Contractor’s risk.
8.2 Contractor shall provide service in accordance with requirements specified herein and the resulting contract(s) and adhere to the TPWD Terms and Conditions.
8.3 Contractor shall provide all labor, materials, and equipment necessary to meet requirements of the specified services throughout the term of the contract.
8.4 Contractor is responsible for all costs incurred in the performance of the contract.
8.5 Contractor shall comply with all laws, ordinances, statutes, and regulations pertaining to the services requested herein, and shall obtain such permits, licenses or other authorizations as may be required.
8.6 Contractor shall take precautions necessary to protect person or property against injury or damage and be responsible for such injury or damage.
8.7 Contractor shall not subcontract any portion of the services to be performed under this contract without prior approval from authorized TPWD representative.
8.8 Contractor will be required to adhere to certain confidentiality restrictions, which may include but are not limited to a prohibition on photography or any form of recording while performing services on private property.
8.9 Contractor must provide maintenance records such as proof of 100-hour inspections, annual inspection records, or check ride certifications upon request.
8.10 Contractor shall follow relevant safety rules and conduct the work in a safe manner.
8.11 Contractor shall be responsible for providing aircraft for low level flying and slinging. Aircraft shall be Hughes 500E, MD 500E, MD 530F, Robinson R66, helicopter(s), or equivalent in TPWD’s determination for desert bighorn/aoudad projects. All aircraft provided under the contractor must meet FAA regulations and standards as stipulated in FAR, Part 135 for survey/gunning projects and Part 133 for external load work. During the entire contract period, aircraft must be maintained per the maintenance requirements of FAR, Part 135.
8.13 Contractor shall provide fuel for survey/gunning and external load operations. Contractor shall provide fuel trailer/truck and driver for fueling operations. Refer to Section I Subsection 10.4 Remote Fueling Capabilities.
9. PERFORMANCE MEASURES
9.1 Contractor will be responsible for the performance of any contractual obligations that may result from an award based on this RFP for the initial project and future projects and shall not be relieved due to non-performance of any or all subcontractor(s). By submitting a proposal, the Respondent commits to providing the goods and services required in the RFP. Successful Respondent(s) will be required to abide by TPWD policies, procedures, standards, and guidelines relevant to the execution of this contract.
9.2 TPWD will monitor vendor performance. Vendor performance will be reported in the Vendor Performance Tracking System (VPTS). Failure to provide services and/or products in accordance with the requirements specified herein, and the resulting Contract and adherence to the TPWD Terms and Conditions may be considered by TPWD as unsatisfactory performance by the Contractor. An
RFP No. 802-26-74010 Page 10 of 54 unsatisfactory performance will result in a negative vendor performance report, cancellation of the contract, or both.
9.3 TPWD will measure and evaluate the Contractor’s and/or subcontractor’s performance under the contract. If the Contractor or subcontractor does not meet any standards for deliverables and/or performance incentives (if applicable), TPWD may impose remedies if the Contractor or subcontractor(s) fails to meet their responsibilities as outlined in the RFP and the terms and conditions of the contract. All services and deliverables under the contract shall be provided at an acceptable quality level and in a manner consistent with acceptable industry standards, customs, and practices. In the event TPWD deems that the Contractor’s performance does not meet an acceptable quality level of service and deliverables, TPWD may seek or negotiate remedies with the Contractor. Remedies shall include negative vendor performance report, corrective action plans, and withholding of payments due to poor performance and contract non-compliance.
10. TPWD RESPONSIBILITIES
10.1 TPWD will designate a Project Manager upon contract award.
10.2 TPWD will furnish no material, labor, equipment, or facilities unless otherwise provided for in this contract.
10.3 SCHEDULE MODIFICATIONS: TPWD will attempt to provide at least five (5) days’ notice of any necessary modification to the schedule.
10.4 REMOTE FUELING CAPABILITIES:
10.4.1 Bighorn Sheep: TPWD will provide the fuel trailer/truck and driver for remote fueling locations under base operations. However, TPWD would like to keep the option open for the contractor to provide these additional services should circumstances arise where TPWD is unable to provide them.
10.5 CANCELLATION OF SCHEDULED SERVICE: TPWD reserves the right to cancel survey/gunning operations or external load projects, if necessary, due to inclement weather, illness, or unforeseen circumstances, and will provide as much notice as possible to contractor.
11. ADDING NEW PRODUCTS/SERVICES TO CONTRACT AFTER AWARD
TWPD reserves the right, in the best interest of the state and in its sole judgment and discretion, to formally request the awarded Contractor to quote proposed additional products/services of the same general scope and category of the original solicitation. Contractor shall submit official quote to TPWD as instructed, and all prices are subject to negotiation for a Best and Final Offer (“BAFO”). TPWD may accept and amend the awarded contract or reject any or all proposals and may issue a separate solicitation for the products/services after rejecting some or all of the RFPs. The products/services covered under this provision shall conform to the specifications as outlined in the request.
12. MODIFICATIONS OF CONTRACT TERMS AND/OR AMENDMENTS
12.1 The terms and conditions of the Contract shall govern all transactions under the Contract.
12.2 The Contract may only be modified or amended upon mutual written agreement of Texas Parks and Wildlife Purchaser(s) and the Contractor. Verbal changes are not allowed.
12.3 Terms and conditions that do not conflict with the Contract and are acceptable to the Contractor(s) may be added in a Purchase Order and given effect. No additional term or condition added in a Purchase
RFP No. 802-26-74010 Page 11 of 54
Order can conflict with or diminish a term or condition of the Contract. In the event of a conflict between Purchase Order and the Contract, the Contract term shall control.
13. INSURANCE
13.1 Contractor shall procure and maintain during the entire period of their performance under this contract the following minimum insurance.
Type of Insurance Each Occurrence/Aggregate Workers Compensation STATUTORY LIMITS Employer's Liability Bodily Injury by Accident Bodily Injury by Disease Bodily Injury by Disease
$1,000,000 Ea. Accident $1,000,000 Ea. Employee $1,000,000 Policy Limit
Commercial General Liability General Aggregate Applies Per Project
$1,000,000 Each Occurrence $2,000,000 Aggregate
$50,000 Damage to Premises Rented to You $2,000,000 Products Completed Operations $1,000,000 Personal & Advertising Liability
Aircraft General Liability Single Limit Bodily Injury & Property Damage $1,000,000 Each Occurrence
Aircraft Passenger Liability $100,000 per Person $400,000 Each Occurrence
Medical Expenses $5,000 Per Person and $20,000 Each Occurrence
Automobile Liability All Owned, Hired and Non-Owned Vehicles $500,000 Combined Single Limit
13.2 Policy shall waive the insurer’s right of recovery or subrogation against TPWD or The State of Texas.
Policy must be primary with respect to coverage provided for TPWD and the State of Texas. Policy in excess of the self-insured retention (SIR) amount must be clearly identified. Policy must be non-contributory with other coverage or self-insurance available to TPWD or The State of Texas.
13.3 All required liability policies:
13.3.1 Except Pollution & Professional, must be written on an “Occurrence Form.” Neither “Modified Occurrence” nor “Claims Made” policies are acceptable, and the Contractor will be in contractual default if Contractor’s insurance is “Modified Occurrence” or “Claims Made.”
13.3.2 Must cover cross-suits between insureds.
13.3.3 Must contain a “severability of interests” provision.
13.4 Policies must include the following clauses, as applicable:
13.4.1 This insurance shall not be canceled, materially changed, or non-renewed except after thirty
(30) days written notice has been given to TPWD.
RFP No. 802-26-74010 Page 12 of 54
13.4.2 It is agreed that Contractor’s insurance shall be deemed primary and non-contributory with respect to any insurance or self-insurance carried by TPWD for liability arising out of operations under the Contract with the Owner.
13.4.3 TPWD, its officials, directors, employees, representatives, and volunteers are added as additional insureds as respects operations and activities of, or on behalf of the named insured performed under Contract with TPWD. The additional insured status must cover completed operations as well. This is not applicable to workers’ compensation policies.
13.4.4 All policies shall contain a waiver of subrogation.
13.5 Policy must contain an additional insured endorsement: The State of Texas, acting through Texas Parks and Wildlife Department and its officers and employees, is listed as an additional insured and loss payee.
13.6 The required coverage is to be with companies licensed in the state of Texas, with an “A” rating from A.M. Best, and authorized to provide the corresponding coverage.
13.7 Prior to the commencement of the job and not later than ten (10) days following award, the Contractor shall furnish to TPWD, for approval, a certificate of insurance as proof that the required insurance is in full force and effect. The certificate of insurance shall be sent to: Jennifer M. Robinson / Purchasing & Contracting, Texas Parks & Wildlife Department, 4200 Smith School Road, Austin, Texas 78744; or may be faxed to 512-389-4677 or emailed to Purchasing.BidBox@tpwd.texas.gov.
14. SUBCONTRACTING
Refer to Section III – General Terms and Conditions, Paragraph 56 – Subcontractors.
15. VetHUB SUBCONTRACTING PLAN
TPWD has determined that VetHUB Subcontracting Opportunities are NOT probable under this contract, therefore there is no VetHUB Subcontracting Plan requirement.
16. TRAVEL
All travel and per diem for the Contractor shall be included in the unit price. TPWD will not be responsible for Contractor’s travel expenses.
17. CONTRACT ADMINISTRATION
17.1 TPWD will maintain on-going review and status of Contractor’s progress toward completion of services and will certify whether contractor’s billings are for the work completed. Payment(s) will not be made until all work has been reviewed and accepted by TPWD.
17.2 Administration of the contract is a joint responsibility of TPWD Wildlife Division and the TPWD Purchasing & Contracting Section. TPWD purchasing staff will be responsible for administering the contractual business relationship with the contractor. Upon issuance of contract, TPWD will designate an individual who will serve as the contract manager and point-of-contact between the agency and the contractor. The contract manager does not have any express or implied authority to vary the terms of the contract, amend the contract in any way or waive strict performance of the terms or conditions of the contract. This individual’s contract management and contract administration responsibilities include, but are not limited to:
RFP No. 802-26-74010 Page 13 of 54
17.2.1 Monitoring the contractor’s progress and performance and ensuring services conform to established specification requirements.
17.2.2 Managing the financial aspects of the contract including approval of payments.
17.2.3 Meeting with the contractor to schedule service, and as needed to review progress, discuss problems, and consider necessary action.
17.2.4 Identifying a breach of contract by assessing the difference between contract performance and non-performance.
17.2.5 Other areas as identified by the State of Texas Procurement and Contract Management Guide, latest edition.
18. INVOICING AND PAYMENT
The following procedures apply to invoicing and payment in addition to those listed in Section III General Terms and Conditions, Paragraph 9 Invoicing and Payment:
18.1 CONTRACTOR TO SUBMIT INVOICE(S) TO: Texas Parks & Wildlife, Accounts Payable, 4200 Smith School Road, Austin, Texas 78744.
18.2 INVOICES MUST SHOW:
18.2.1 Name of Contractor exactly as shown on the contract, Texas Payee Identification Number (PIN), and correct "Remit to" address;
18.2.2 Name of receiving entity;
18.2.3 Contract/purchase order number;
18.2.4 Description, quantity, unit of measure, unit price, extended price of each item;
18.2.5 Total price;
18.2.6 Discount, if applicable, extended and deducted to arrive at a NET TOTAL for invoice;
18.2.7 Attach supporting documentation, if required.
18.3 PAYMENT:
18.3.1 The contractor will be paid for the services performed as invoiced. If another payment mechanism is agreed to by the parties, then contractor will be paid in accordance with the agreement approved by the parties.
18.3.2 Under no circumstances shall TPWD be obligated to make any payment (whether a progress payment or final payment) to Contractor if any of the following conditions exist:
18.3.2.1 Contractor is in breach of this contract;
18.3.2.2 Any portion of a payment is for services that were not performed in accordance with this contract provided, however, payment shall be made for those services which were performed in accordance with this contract;
18.3.2.3 Contractor has failed to make payments promptly to consultants or other third parties
RFP No. 802-26-74010 Page 14 of 54 used in connection with services for which TPWD has made payment to Contractor;
18.3.2.4 If TPWD, in good faith, determines that the balance of the unpaid fees is not sufficient to complete the services in accordance with this contract; or if Contractor has failed to achieve the level of performance necessary to maintain the project schedule. No deductions shall be made from Contractor’s compensation on account of liquidated damages or other sums withheld from payments to other contractors or on account of the cost of changes in the Work other than those for which Contractor may be liable.
18.3.3 Payment normally will be made to the Contractor within 30 days after receipt of a properly prepared invoice or the receipt of and the acceptance of services ordered, whichever is later.
State agencies are required by state law to pay properly submitted invoices within 30 days, or the Contractor may charge a late payment fee established by law.
18.3.4 Payments for services purchased with state appropriated funds will be made through state warrants issued by the Comptroller of Public Accounts. Payments by qualified ordering entities will be made through the entity’s local payment system.
18.3.5 Electronic payment may be available through some ordering entities. Contact Accounts Payable at 512-389-4833 for additional information.
RFP No. 802-26-74010 Page 15 of 54
SECTION II – PROPOSAL REQUIREMENTS
1. SCHEDULE OF EVENTS
TPWD intends to proceed according to the following schedule. These dates represent a tentative schedule of events. TPWD reserves the right to change the dates in the schedule of events above upon written notification to prospective Respondents through a posting on the Electronic State Business Daily as an Addendum.
Event Date/Time RFP Issue Date: May 20, 2026 Questions Due: May 27, 2026; 2:00 P.M. C.T.
Proposal Due Date: June 03 2026; 2:00 P.M. C.T.
2. INQUIRIES
2.1. CONTACT: All requests, questions, or other communications about this Solicitation shall be made in writing to TPWD’s Purchasing Department, addressed to the following person:
Jennifer M. Robinson, Purchaser Phone: 512-960-7483 Texas Parks and Wildlife Department 4200 Smith School Road, Austin, Texas 78744 purchasing.bidbox@tpwd.texas.gov
2.2. CLARIFICATIONS: TPWD will allow written requests for clarification of this Solicitation. Questions may be faxed or e-mailed to the point-of-contact listed in Section II, Subsection 2.1. Questions should be submitted in the following format: a) Reference the Solicitation number; b) Reference the Section number, Page number, Paragraph number, and Text of passage being questioned; and c) Question.
2.3. DEADLINE FOR SUBMISSION OF QUESTIONS: To provide TPWD with sufficient time to adequately prepare responses to vendor inquiries, all questions must be submitted by the deadline specified in Section II, Subsection 1.
2.4. ANSWERS TO QUESTIONS: The target date for answering questions is within three business days after deadline for questions. Official answers will be posted as an addendum to this solicitation, on the Electronic State Business Daily at http://www.txsmartbuy.com/esbd. Respondent names will be removed from questions in the responses released. TPWD reserves the right to amend answers prior to the proposal submission deadline. If respondents do not have Internet access, copies may be obtained through the point of contact listed above. Note: It is the responsibility of interested parties to periodically check ESBD website for updates to the procurement prior to submitting a proposal. Respondent’s failure to periodically check the Electronic State Business Daily (ESBD) will in no way release the selected vendor from “addenda or additional information” resulting in additional costs to meet the RFP requirements.
2.5. PROHIBITED COMMUNICATIONS: Upon issuance of this solicitation, TPWD, its representative(s), or partners will not answer questions or otherwise discuss the contents of this Solicitation with any potential Respondent or their representative(s), except for the written inquires described in Section II, Subsection 2.2 above. Attempts to ask questions by phone or in person will not be allowed or recognized as valid. Failure to observe this restriction may disqualify respondent. Respondent shall rely only on written statements issued through or by TPWD’s purchasing staff. This restriction does not preclude discussions between affected parties for the purposes of conducting business unrelated to this solicitation.
3. PROPOSAL CONTENT
mailto:purchasing.bidbox@tpwd.texas.gov http://www.txsmartbuy.com/esbd
RFP No. 802-26-74010 Page 16 of 54
Below is a summary of required and requested information. Proposals submitted without this information will be evaluated accordingly. TWPD reserves the right, in its sole judgment and discretion, to waive minor technicalities and errors in the best interest of the state.
3.1. GENERAL RESPONSE FORMAT: EMAIL SUBMITTALS ARE PREFERRED FOR THIS
SOLICITATION in accordance with Section II, Subsection 5, however, if hardcopy submitted, Respondents shall submit one (1) original proposal signed (marked Original).
3.2. REQUIRED RESPONSE CONTENT:
Respondent MUST include the following documentation in their response submission. Failure to submit with response will result in disqualification of the proposal.
3.2.1. Exhibit A – Execution of Proposal: Respondent must submit original signed, dated, and completed Exhibit A - Execution of Proposal.
3.2.2. Exhibit B – Pricing Sheet: Include completed Exhibit B – Pricing Sheet. Pricing should not be included in the submitted copies.
3.3. ADDITIONAL RESPONSE CONTENT:
Respondent must include the following additional documentation in their response submission, or within one business day of TPWD request. Failure to submit this additional documentation by TPWD designated deadline will result in disqualification of the proposal.
3.3.1. Exhibit C – Company Profile: Include completed Exhibit C (or reasonable facsimile).
3.3.2. Exhibit D – Key Personnel: Include completed Exhibit D (or a reasonable facsimile, or resumes)
3.3.3. Exhibit E – Past Projects with Corresponding References: Include completed Exhibit E (or reasonable facsimile).
3.3.4. Exhibit F – Equipment List: Include completed Exhibit F (or a reasonable facsimile).
3.3.5. Exhibit G – Certificate(s)/License(s): Include completed Exhibit G (or a reasonable facsimile).
3.3.6. Exhibit H – Safety Records: Include completed Exhibit H (or a reasonable facsimile).
3.3.7. Exhibit I – Technical Proposal: Include Technical Proposal – tabbed Exhibit I including numbered responses corresponding to each of the items listed in Exhibit I.
3.3.8. Addenda: Respondent shall acknowledge receipt of any addendums generated as part of this solicitation. The respondents should include the signed and dated addendum(s) with their response submission.
4. PROPOSAL SUBMISSION
4.1. EMAIL SUBMITTALS ARE PREFERRED FOR THIS SOLICITATION in accordance with Section II Subsection 5.1.
4.2. All proposals shall be received and time stamped by TPWD prior to 2:00 PM Central Time (C.T.) on the date specified in Section II, Subsection 1 and the place specified in Section II, Subsection 5. Late proposals will not be considered under any circumstance and will be returned unopened.
RFP No. 802-26-74010 Page 17 of 54
4.3. If submitting proposal via mail or delivery, proposals should be placed in a sealed envelope/package and correctly identified with RFP number, submittal deadline/opening date and time. It is the Respondent’s responsibility to appropriately mark and deliver the proposal to TPWD by the specified date.
4.4. Receipt of all addenda to this RFP should be acknowledged by returning a signed copy of each addendum to the response.
4.5. Respondents to this RFP are responsible for all costs of proposal preparation.
4.6. Proposals by mail or delivery shall be submitted to TPWD Headquarters, Purchasing & Contracting, as noted in Section II, Subsection 5 below. Proposals by email shall be submitted to purchasing.bidbox@tpwd.texas.gov.
4.7. Telephone and facsimile proposals are NOT an acceptable response to an RFP. All submitted proposals become the property of TPWD after the RFP submittal due date/ deadline. Responses submitted shall constitute an offer for a period of ninety (90) days or until selection is made by TPWD, whichever is earlier.
4.8. When Proposals are opened, only the names of the Respondents who submitted proposals will be read.
Prices and terms will not be divulged until after contract award.
5. DELIVERY OF PROPOSALS
EMAIL SUBMITTALS ARE PREFERRED FOR THIS SOLICITATION. If hard copies are submitted, Respondent shall submit to TPWD by one of the following methods:
6. EVALUATION AND AWARD
6.1. A contract will be awarded to the responsible respondent(s) who submits the proposal determined to be the best value to the State and who meets all requirements included in this RFP.
6.2. Cash discounts offered by the respondent will NOT be a factor in proposal evaluation.
6.3. Proposals may be withdrawn by written notice at any time prior to the solicitation closing due date and time but must be honored from the time of closing until the stated offer expires. Notification via email to the purchaser’s name identified in Section II, Subsection 2 above, will be acceptable as a written notice for withdrawal. No proposals will be returned after award.
6.4. STEP 1 – ADMINISTRATIVE REVIEW BY PURCHASING: Only a complete response with the listed required submittal documents will be considered. Failure to meet the minimum qualifications and submit the required documents will result in a response being declared non-responsive. Proposals that do not conform to the instructions included in this RFP may be rejected by TPWD. TPWD reserves the right to reject any or all proposals and to waive informalities and minor irregularities in proposals received. No proposal received in TPWD Purchasing and Contracting Section after the exact date and time specified as the deadline for responses will be considered.
U.S. Postal Service Overnight/Express Mail Hand Deliver
Texas Parks and Wildlife Dept.
Purchasing & Contracting C-1 4200 Smith School Road Austin, TX 78744
TPWD – Mail Room Attn: Purchasing & Contracting C-1 4200 Smith School Road Austin, TX 78744 Hours – 8:00 AM C.T. to 5:00 PM C.T.
TPWD – 1st Floor Security Desk Attn: Purchasing & Contracting C-1 4200 Smith School Road Austin, TX 78744 Hours – 8:00 AM C.T. to 5:00 PM C.T.
NOTE: Proposals must be date stamped in Purchasing & Contracting prior to the due date and time.
mailto:purchasing.bidbox@tpwd.texas.gov
RFP No. 802-26-74010 Page 18 of 54
6.5. STEP 2 – INITIAL EVALUATION: A TPWD evaluation committee will evaluate and score each response based on established criteria. Respondents shall not contact members of the evaluation team.
Responses will be evaluated according to the respondent’s ability to best satisfy TPWD requirements.
Respondent’s submission is evaluated and scored on a weighted system to determine the best value as follows:
Evaluation Criteria Weight Compensation and Fees – Exhibit B - Pricing Sheet 15% Technical Proposal – Exhibit I - Technical Proposal 15% Qualifications, Experience, References, Capability, Facility, Equipment, Etc.
Exhibit C – Company Profile, Exhibit E – Past Projects with Corresponding References, Exhibit F – Equipment List, Exhibit G – Certificate(s)/License(s)
35%
Expertise and ability of pilot and key personnel. Safety and effectiveness of wildlife survey operations. Exhibit D – Key Personnel, Exhibit H – Safety Records 35%
Total: 100%
6.6. STEP 3 – SHORT LIST: At TPWD’s sole discretion, a short-list may be developed. Then, TPWD may check references and/or inspect respondent’s facility/equipment.
6.6.1. References may include past performance evaluations. References will be scored on a pass/fail basis. Any negative responses received may be grounds for disqualification of the proposal.
6.6.2. Facility and/or equipment may be inspected to verify ability to successfully complete the project.
Inspection will be scored on a pass/fail basis. Failure may be grounds for disqualification of the proposal.
6.7. STEP 4 - BEST AND FINAL OFFER (BAFO): The evaluation committee will determine if discussions and/or Best and Final Offers are necessary. Award of a contract may be made without discussions or Best and Final Offers, if in the best interest of the state.
6.7.1. Discussions: The evaluation committee may determine that discussions are necessary to clarify or verify a written proposal.
6.7.2. BAFO: A request for a Best and Final Offer is at the sole discretion of TPWD and will be requested in writing. If requested, respondent(s) shall submit a final price and any added value.
If more than one respondent reaches this level, the negotiated terms, references, BAFO and added values will be considered in the award. TPWD will make the final determination on the best value.
6.7.3. The evaluation committee will evaluate the finalists and make a recommendation for award.
6.8. AWARD: TPWD reserves the right to award a contract to a single contractor, or award to more than one contractor, whichever provides the best value to TPWD in performance of this service. TPWD will be the sole judge of best value. (Refer to Section II, Subsection 6.5 for Best Value criteria.)
RFP No. 802-26-74010 Page 19 of 54
SECTION III – GENERAL TERMS AND CONDITIONS
GENERAL TERMS AND CONDITIONS – FEDERALLY FUNDED PROJECTS
OCTOBER 2025
(ITEMS BELOW APPLY TO AND BECOME A PART OF THE CONTRACT)
Any Contract awarded as a result of this solicitation will contain the General Terms and Conditions listed below in this Section. Subcontractors are also obliged to comply with these provisions.
1. DEFINITIONS: As used throughout this solicitation, the following terms have the meaning set forth below.
All other terms have the meaning set forth in Webster’s II New College Dictionary.
1.1. Bidder: An individual or entity that submits a bid. The term includes anyone acting on behalf of the individual or entity that submits a bid, such as an agent, employee and representative. See Respondent.
1.2. Contractor: The individual, corporation, company, partnership, firm, or organization that has to furnish the materials and has to perform the work as stated in the solicitation.
1.3. ESBD: The Electronic State Business Daily, which is available online at http://www.txsmartbuy.gov/esbd .
1.4. Gov’t Code: The Texas Government Code.
1.5. Owner: Texas Parks and Wildlife Department, an agency of the State of Texas.
1.6. Party/Parties: Either the TPWD and Respondent separately or collectively.
1.7. Respondent: Any person or Vendor who submits a Bid/Proposal/Offer in response to this solicitation.
1.8. Services: Includes the use of labor, materials, facilities, equipment, and any other need that is necessary or incidental to the successful completion of the Contract.
1.9. Subcontractor: Any supplier, distributor, Contractor, person, or firm furnishing to the Contractor, materials or services necessary or incidental to the performance of the Contract between TPWD and Contractor.
1.10. TAC: The Texas Administrative Code, which is the publication for administrative rules.
1.11. Texas Identification Number: A unique 11-digit number assigned by the Texas Comptroller of Public Accounts. When a Payee first contracts with a state agency, that Payee must provide either a federal Employer Identification Number (EIN) or a Social Security number (SSN). The Texas Identification Number (TIN) is based on this number. (Note: If Respondent does not have a TIN, or does not know their TIN, they may list their EIN or SSN on the “Texas Identification Number” line of the Vendor Information Block of their RFP, RFO, IFB or RFQ response.)
1.12. TPWD: Texas Parks and Wildlife Department acting on behalf of the State of Texas.
2. SPECIFICATIONS:
2.1. The goods/services provided shall be in accordance with the purchase specifications herein. TPWD will decide the answers to all questions that may arise as to the interpretation of the specifications and the quality, or acceptability of goods/services provided. TPWD will decide the rate of progress of the work and the acceptable fulfillment of the goods/service on the part of the Contractor.
2.2. Catalogs, brand names or manufacturer's references are descriptive only, and indicate type and quality desired. Bids/Proposals on brands of like nature and quality will be considered unless advertised under Texas Gov't Code §2155.067. If the Respondent is offering brands other than the references, response should show manufacturer, brand or trade name, and other description of product offered. If Respondent is offering brand(s) other than brand(s) specified, illustrations and complete description of product offered are requested to be made part of the bid. Failure to take http://www.txsmartbuy.gov/esbd
RFP No. 802-26-74010 Page 20 of 54 exception to specifications or reference data will require Respondent to furnish specified brand names, numbers, etc.
2.3. Unless otherwise specified, items shall be new and unused and of current production.
2.4. Samples, when requested, must be furnished free…