ESBD_489319_1771623179017_Addendum 3 EH 95862.pdf
PDF 2 MB Posted
- Attached to
- Elliott Hall Renovation
- Solicitation number
- 753-26-95862
- Issued by
- Texas
About this file
This file is Addendum No. 3 to a Request for Proposals (RFP) issued by Sam Houston State University in Huntsville, Texas for a General Contractor to complete the Elliott Hall Renovation project (RFP No. 753-26-95862). The addendum, prepared by Chuck Jones, Director of Facilities Planning and Construction, was issued on February 20, 2026, and replaces Sections 6.2 through 6.2.4 of the original RFP regarding the Respondent's Pricing and Delivery Proposal. The addendum includes revised drawings from Kirksey/Jones DBR and establishes a construction milestone schedule requiring respondents to execute the General Contractor Agreement by April 6, 2026, receive Notice to Proceed for material procurement by April 13, 2026, commence onsite construction by May 18, 2026, achieve Substantial Completion by June 9, 2027, and reach Final Completion by July 8, 2027. The original RFP was posted on February 11, 2026.
Respondents must provide pricing for both a Base Proposal Cost and an Alternate Cost that includes removal of demolition and new construction work at the Garden Level, as well as removal of the elevator and related systems at the Garden Level and Level 1. All pricing shall be submitted in both written and figure form, with the written amount governing in case of discrepancy. Respondents must acknowledge receipt of all addenda issued for the RFP, including Addendum Nos. 1 through 5. The construction contract will be governed by the Uniform General Conditions for Construction Contracts (UGC) as prepared by Sam Houston State University, with the final Project timeline to be developed and validated with the Owner following contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(i) (ii)
REQUEST FOR PROPOSALS
FOR
GENERAL CONTRACTOR
FOR
SAM HOUSTON STATE UNIVERSITY
HUNTSVILLE, TEXAS
Elliott Hall Renovation RFP No.:
753-26-95862
Notice To All Respondents:
The following is Addendum No. 3 to the Request for Proposals (RFP)
ESBD Posting No. 753-26-95862 which was posted on February 11, 2026
Prepared By:
Chuck Jones
Director, Facilities Planning and Construction Sam Houston State University
2424 S. Sam Houston Ave.
Addendum No. 3 Issued Februar y 20, 2026
I. Attachment:
a. Replacement of 6.2 Respondent’s Pricing and Delivery Proposal: The attached document replaces Sections 6.2 through 6.2.4, Respondent’s Pricing and Delivery Proposal, in their entirety. Respondents shall use the attached revised sections when preparing and submitting their proposal.
II. Addition of Technology Scope:
a. Please see the attached documents concerning the following:
i. Drawings from Kirksey / Jones DBR
-END OF ADDENDUM NO. 3 -
6.2 RESPONDENT’S PRICING AND DELIVERY PROPOSAL
RFP No.: 753-26-95862
Project Name: RFP for Competitive Sealed Proposals for Elliott Hall Renovation - 95862 at Sam Houston State University
From:
Respondent’s Name:
Mailing Address:
City,State,ZipCode:
Phone-Number:
To: Chuck Jones, Director, Facilities Planning & Construction Sam Houston State University 2424 Sam Houston Ave.
Huntsville, TX 77341
Having carefully examined the Uniform General Conditions for Construction Contracts (UGC), the sealed Plans and Specifications and addenda thereto, as prepared by Sam Houston State University, the Project Architect/Engineer on this Project, as well as the premises and all the conditions affecting the work, the undersigned proposes to furnish all labor, materials, and equipment necessary to achieve Substantial Completion of the work in accordance with the Contract Documents for the following sum (Amount shall be shown in both written and figure form. In case of discrepancy between the written amount and the figure, the written amount will govern):
6.2.1 BASE PROPOSAL COST:
DOLLARS
6.2.2 ALTERNATE COST:
Scope to include removal of all demolition and new construction work at the Garden Level as indicated in the Contract Documents, including associated civil, architectural, structural, and MEP systems, exterior patio paving, and canopy system. Remove the elevator and all related architectural, structural, electrical, and plumbing work at the Garden Level and Level 1.
______________________________________________________DOLLARS
6.2.3 CONSTRUCTION MILESTONE SCHEDULE: The undersigned agrees, if awarded the contract, to achieve Substantial Completion of the Work as defined in the UGC, the plans and specifications and addenda thereto.
4.2.3.1 Execute General Contractor Agreement ................................................ 04/06/2026
4.2.3.2 Notice to Proceed with procurement of material .................................... 04/13/2026
4.2.3.3 Onsite construction to start .................................................................... 05/18/2026
4.2.3.4 Substantial Completion .......................................................................... 06/09/2027
4.2.3.5 Final Completion ................................................................................... 07/08/2027
The above schedule of events represents a basic timeline for the Project. A final Project timeline will be developed with the Owner at a later time. The Owner can be expected to work with the highest-ranking Respondent to validate and improve on this initial schedule.
6.2.4 RFP ADDENDA: Receipt is hereby acknowledged of the following addenda issued for this RFP
- initial where applicable.
No. 1
No. 2 No. 3 No. 4 No. 5
20 February 2026
PROJECT Sam Houston State University – Elliot Hall Renovation, 2025185
ADDENDUM NO. 001
BID PACKAGE “02/10/2026 100% CONSTRUCTION DOCUMENTS”
NOTICE TO ALL BIDDERS
This Addendum forms a part of and/or modifies the Contract Documents dated 02 February 2026
LIST OF ITEMS INCLUDED IN ADDENDUM
This Addendum form consists of (7) pages and all attachments noted herein, including the following:
▪ See attached addendum from Jones DBR
END OF ADDENDUM FORM
addendum
Addendum 03
��/��/���0�
+**-1*23.145.
| 6748-9,. �:�:����;��'�������� | ���'� |
| �< | �� |
��A���"?�
A� �A=��� ��A���"?�
A�
�'�@'"���A���
B��CD(E��
FGHI.JKL MNHHG.,O5KJ.P.4Q-7+RR.,-9S14R4TU.6R+1.T7421*.VR447.
��W �
�0���
X�W �
FGHI.JOL MNHHG.,O5KK.P.4Q-7+RR.,-9S14R4TU.6R+1.R-Q-R.K.
��W �
X�W �
B�W �
��X$�A"���YB&�"�������A�"���A���"��
FGHI.JZL MNHHG.,O5KO.P.4Q-7+RR.,-9S14R4TU.6R+1.R-Q-R.O.
��W �
FGHI.J[L MNHHG.,O5KZ.P.4Q-7+RR.,-9S14R4TU.6R+1.R-Q-R.Z.
��W �
FGHI.J\L MNHHG.,Z5JK.P.,-9S14R4TU.-1R+7T-*.6R+1.
��W �
��X$�A"���YB&����A�"���A���"��
FGHI.J]L MNHHG.,]5JK.P.,-9S14R4TU.*-,+FRM.
��W �
%(B�̂&��BB%(B<Y�
R E
F
C R
C R
DC
DC
DC
CR
D2
48"AFF
D2
6"AC
D2
6"AC
G68
G75C
AP1 AP1
D2
48"AFF
D2
48"AFF
STATE OF TEXAS HUB FIRM
713.914.4333 p https://www.jonesdbr.com
TBPE Firm Registration No. 13002
1 2 4
D
1 2 4 53
C
B
A
D
C
B
A
NOT FOR REGULATORY APPROVAL,
PERMITTING, OR CONSTRUCTION
Select Architect
SHEET NUMBER
SHEET TITLE
KEY PLAN
PROJECT NAME
PROJECT ADDRESS
DATE ISSUE
KIRKSEY PROJECT NO.
These drawings have been prepared as one coordinated set of drawings and are complimentary. What is required by one drawing is required by all of the drawings, even if a detail or component part is not identified on every sheet. Any user’s reliance on a single or select few sheet(s) of the drawings without consideration for the information included in the entire set of drawings will be at the user’s sole risk and shall not form the basis for a request for additional compensation or time.
kirksey.com
6909 Portwest Drive
Houston Texas 77024
713 850 9600
Houston + Austin + Dallas
CK PG CB AM
JONESDBR Project # 2535.000
02/19/2026
/1
/2
:3
:0
P M
A u to d e s k D o c s /2
S
H S
U E lli o tt H a ll
R e n o v a ti o n /2
S
H S
U -E lli o tt
H a ll- R e n o
M E
P
.r v t
T2.10
OVERALL TECHNOLOGY
PLAN GROUND FLOOR
SAM HOUSTON STATE
UNIVERSITY - ELLIOT HALL
RENOVATION
1006 17TH ST. HUNTSVILLE,
TX 77340
2025185
Issue Date
© 2025 Kirksey
1/8" = 1'-0"
OVERALL TECHNOLOGY PLAN GROUND FLOOR
1 02/10/2026 ISSUE FOR CONSTRUCTION
2 02/19/2026 ADDENDUM 1
# TECHNOLOGY KEYED NOTES
1 DEVICE TO BE PRICED IN 'ALTERNATE 1.'
D WW
REF.
DN
A C
P
CR
T3.01
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
36"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
STATE OF TEXAS HUB FIRM
713.914.4333 p https://www.jonesdbr.com
TBPE Firm Registration No. 13002
1 2 4
D
1 2 4 53
C
B
A
D
C
B
A
NOT FOR REGULATORY APPROVAL,
PERMITTING, OR CONSTRUCTION
Select Architect
SHEET NUMBER
SHEET TITLE
KEY PLAN
PROJECT NAME
PROJECT ADDRESS
DATE ISSUE
KIRKSEY PROJECT NO.
These drawings have been prepared as one coordinated set of drawings and are complimentary. What is required by one drawing is required by all of the drawings, even if a detail or component part is not identified on every sheet. Any user’s reliance on a single or select few sheet(s) of the drawings without consideration for the information included in the entire set of drawings will be at the user’s sole risk and shall not form the basis for a request for additional compensation or time.
kirksey.com
6909 Portwest Drive
Houston Texas 77024
713 850 9600
Houston + Austin + Dallas
CK PG CB AM
JONESDBR Project # 2535.000
02/19/2026
/1
/2
:3
:1
P M
A u to d e s k D o c s /2
S
H S
U E lli o tt H a ll
R e n o v a ti o n /2
S
H S
U -E lli o tt
H a ll- R e n o
M E
P
.r v t
T2.11
OVERALL TECHNOLOGY
PLAN LEVEL 1
SAM HOUSTON STATE
UNIVERSITY - ELLIOT HALL
RENOVATION
1006 17TH ST. HUNTSVILLE,
TX 77340
2025185
Issue Date
© 2025 Kirksey
1/8" = 1'-0"
OVERALL TECHNOLOGY PLAN LEVEL 1
1 02/10/2026 ISSUE FOR CONSTRUCTION
2 02/19/2026 ADDENDUM 1
# TECHNOLOGY KEYED NOTES
1 DEVICE TO BE PRICED IN 'ALTERNATE 1.'
D
WW
D2
48"AFF
D2
48"AFFD2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
STATE OF TEXAS HUB FIRM
713.914.4333 p https://www.jonesdbr.com
TBPE Firm Registration No. 13002
1 2 4
D
1 2 4 53
C
B
A
D
C
B
A
NOT FOR REGULATORY APPROVAL,
PERMITTING, OR CONSTRUCTION
Select Architect
SHEET NUMBER
SHEET TITLE
KEY PLAN
PROJECT NAME
PROJECT ADDRESS
DATE ISSUE
KIRKSEY PROJECT NO.
These drawings have been prepared as one coordinated set of drawings and are complimentary. What is required by one drawing is required by all of the drawings, even if a detail or component part is not identified on every sheet. Any user’s reliance on a single or select few sheet(s) of the drawings without consideration for the information included in the entire set of drawings will be at the user’s sole risk and shall not form the basis for a request for additional compensation or time.
kirksey.com
6909 Portwest Drive
Houston Texas 77024
713 850 9600
Houston + Austin + Dallas
CK PG CB AM
JONESDBR Project # 2535.000
02/19/2026
/1
/2
:3
:2
P M
A u to d e s k D o c s /2
S
H S
U E lli o tt H a ll
R e n o v a ti o n /2
S
H S
U -E lli o tt
H a ll- R e n o
M E
P
.r v t
T2.12
OVERALL TECHNOLOGY
PLAN LEVEL 2
SAM HOUSTON STATE
UNIVERSITY - ELLIOT HALL
RENOVATION
1006 17TH ST. HUNTSVILLE,
TX 77340
2025185
Issue Date
© 2025 Kirksey
1/8" = 1'-0"
OVERALL TECHNOLOGY PLAN LEVEL 2
1 02/10/2026 ISSUE FOR CONSTRUCTION
2 02/19/2026 ADDENDUM 1
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
D2
48"AFF
STATE OF TEXAS HUB FIRM
713.914.4333 p https://www.jonesdbr.com
TBPE Firm Registration No. 13002
1 2 4
D
1 2 4 53
C
B
A
D
C
B
A
NOT FOR REGULATORY APPROVAL,
PERMITTING, OR CONSTRUCTION
Select Architect
SHEET NUMBER
SHEET TITLE
KEY PLAN
PROJECT NAME
PROJECT ADDRESS
DATE ISSUE
KIRKSEY PROJECT NO.
These drawings have been prepared as one coordinated set of drawings and are complimentary. What is required by one drawing is required by all of the drawings, even if a detail or component part is not identified on every sheet. Any user’s reliance on a single or select few sheet(s) of the drawings without consideration for the information included in the entire set of drawings will be at the user’s sole risk and shall not form the basis for a request for additional compensation or time.
kirksey.com
6909 Portwest Drive
Houston Texas 77024
713 850 9600
Houston + Austin + Dallas
CK PG CB AM
JONESDBR Project # 2535.000
02/19/2026
/1
/2
:3
:3
P M
A u to d e s k D o c s /2
S
H S
U E lli o tt H a ll
R e n o v a ti o n /2
S
H S
U -E lli o tt
H a ll- R e n o
M E
P
.r v t
T2.13
OVERALL TECHNOLOGY
PLAN LEVEL 3
SAM HOUSTON STATE
UNIVERSITY - ELLIOT HALL
RENOVATION
1006 17TH ST. HUNTSVILLE,
TX 77340
2025185
Issue Date
© 2025 Kirksey
1/8" = 1'-0"
OVERALL TECHNOLOGY PLAN LEVEL 3
STATE OF TEXAS HUB FIRM
713.914.4333 p https://www.jonesdbr.com
TBPE Firm Registration No. 13002
1 2 4
D
1 2 4 53
C
B
A
D
C
B
A
NOT FOR REGULATORY APPROVAL,
PERMITTING, OR CONSTRUCTION
Select Architect
SHEET NUMBER
SHEET TITLE
KEY PLAN
PROJECT NAME
PROJECT ADDRESS
DATE ISSUE
KIRKSEY PROJECT NO.
These drawings have been prepared as one coordinated set of drawings and are complimentary. What is required by one drawing is required by all of the drawings, even if a detail or component part is not identified on every sheet. Any user’s reliance on a single or select few sheet(s) of the drawings without consideration for the information included in the entire set of drawings will be at the user’s sole risk and shall not form the basis for a request for additional compensation or time.
kirksey.com
6909 Portwest Drive
Houston Texas 77024
713 850 9600
Houston + Austin + Dallas
CK PG CB AM
JONESDBR Project # 2535.000
02/19/2026
/1
/2
:3
:3
P M
A u to d e s k D o c s /2
S
H S
U E lli o tt H a ll
R e n o v a ti o n /2
S
H S
U -E lli o tt
H a ll- R e n o
M E
P
.r v t
T3.01
TECHNOLOGY ENLARGED
SAM HOUSTON STATE
UNIVERSITY - ELLIOT HALL
RENOVATION
1006 17TH ST. HUNTSVILLE,
TX 77340
2025185
Issue Date
© 2025 Kirksey
1/2" = 1'-0"
TECHNOLOGY PLAN LEVEL 1 - MDF
MORTISE LOCKSET
MULLION OR WALL
MOUNTED CARD READER
SINGLE GANG BACK BOX
FOR WALL MOUNTED
INSTALLATIONS
MULLION OR WALL
MOUNTED CARD READER
SINGLE GANG BACK BOX
FOR WALL MOUNTED
INSTALLATIONS
ELECTRIFIED
STRIKE
FINISH FLOOR
SINGLE DOOR ELEVATION DOUBLE DOOR ELEVATION
HID HIDHIDHID
3/4" CONDUIT
3/4" CONDUIT (IF READER
IS WALL MOUNTED)
18/2 COND. - LOCK POWER
22/6 COND. - READER (IF MULLION READER)22/6 COND. -
READER (IF MULLION
READER)
1/2" CONDUIT
DOOR CONTACT
1/2" CONDUIT
TRANSFER HINGE
1/2" CONDUIT
1/2" CONDUIT
DOOR CONTACT DOOR CONTACT
CEILING
1/2" CONDUIT
TRANSFER HINGE
MIER #BW104 JUNCTION BOX
1" CONDUIT STUBBING UP TO
MAIN CABLE PATH HEIGHT
MIER #BW104 JUNCTION BOX
1" CONDUIT STUBBING UP TO
MAIN CABLE PATH HEIGHT
WALL-MOUNTED CARD READER ELEVATION
FINISHED FLOOR
LAY-IN
FINISHED
CEILINGCEILING MOUNTED CAMERA
ERICO CADDY T-GRID BOX HANGER WITH
BOX. COORDINATE BOX REQUIREMENTS
WITH CAMERA MODEL. PROVIDE
EXTENSION BRACKETS AS REQUIRE.
CATEGORY 6A UTP
ROUTE TO THE MDF/IDF
10' SERVICE
LOOP
CABLE SUPPORT
LAY-IN CEILING-MOUNTED CAMERA
V2418FO
V2415DFO
18" A.F.F.
V2417DFO
V2444D-2AV2435DFO
WHEN REQ'D.
V2451H
V224D
WHEN REQ'D.
V2400D
CEILING
J
V2410DFO
E20008
*NOT TO SCALE
V2400 RACEWAY SYSTEM LAYOUT
STATE OF TEXAS HUB FIRM
713.914.4333 p https://www.jonesdbr.com
TBPE Firm Registration No. 13002
1 2 4
D
1 2 4 53
C
B
A
D
C
B
A
NOT FOR REGULATORY APPROVAL,
PERMITTING, OR CONSTRUCTION
Select Architect
SHEET NUMBER
SHEET TITLE
KEY PLAN
PROJECT NAME
PROJECT ADDRESS
DATE ISSUE
KIRKSEY PROJECT NO.
These drawings have been prepared as one coordinated set of drawings and are complimentary. What is required by one drawing is required by all of the drawings, even if a detail or component part is not identified on every sheet. Any user’s reliance on a single or select few sheet(s) of the drawings without consideration for the information included in the entire set of drawings will be at the user’s sole risk and shall not form the basis for a request for additional compensation or time.
kirksey.com
6909 Portwest Drive
Houston Texas 77024
713 850 9600
Houston + Austin + Dallas
CK PG CB AM
JONESDBR Project # 2535.000
02/19/2026
/1
/2
:3
:4
P M
A u to d e s k D o c s /2
S
H S
U E lli o tt H a ll
R e n o v a ti o n /2
S
H S
U -E lli o tt
H a ll- R e n o
M E
P
.r v t
T6.01
TECHNOLOGY DETAILS
SAM HOUSTON STATE
UNIVERSITY - ELLIOT HALL
RENOVATION
1006 17TH ST. HUNTSVILLE,
TX 77340
2025185
Issue Date
© 2025 Kirksey
| 20260220_Addendum 001 |
| Addendum 1 - Narrative |
| T2.10 |
| 2535 - SHSU-Elliott Hall-Reno - MEP25 |
| T2.10 - OVERALL TECHNOLOGY PLAN GROUND FLOOR |
| T2.11 |
| 2535 - SHSU-Elliott Hall-Reno - MEP25 |
| T2.11 - OVERALL TECHNOLOGY PLAN LEVEL 1 |
| T2.12 |
| 2535 - SHSU-Elliott Hall-Reno - MEP25 |
| T2.12 - OVERALL TECHNOLOGY PLAN LEVEL 2 |
| T2.13 |
| 2535 - SHSU-Elliott Hall-Reno - MEP25 |
| T2.13 - OVERALL TECHNOLOGY PLAN LEVEL 3 |
| T3.01 |
| 2535 - SHSU-Elliott Hall-Reno - MEP25 |
| T3.01 - TECHNOLOGY ENLARGED |
| T6.01 |
| 2535 - SHSU-Elliott Hall-Reno - MEP25 |
| T6.01 - TECHNOLOGY DETAILS |
| ADP70FE.tmp |
| (i) |
| (ii) |
| REQUEST FOR PROPOSALS |
| FOR |
| GENERAL CONTRACTOR |
| FOR |
| SAM HOUSTON STATE UNIVERSITY |
| Elliott Hall Renovation |
| RFP No.: |
| 753-26-95862 |
| ADPC207.tmp |
| 6.2 RESPONDENT’S PRICING AND DELIVERY PROPOSAL |
File details come from the government source that posted it. Updated .