This is an Addendum 2 to a Request for Qualifications (RFQ) issued by the University of Texas at Arlington Office of Facilities Management for Geotechnical and Construction Material Testing Services under Bid Invitation Number FM2026-004. The bid opening is scheduled for March 12, 2026, at 2:00 PM CDT. The addendum provides clarifications to the original solicitation documents, addressing questions regarding submission requirements for organizational charts, exhibits, Section 3.11 execution requirements, and personnel information. Respondents are required to submit all components of Section 3.11, while Exhibits 1 and 2 are provided for reference only and need not be submitted. The organizational chart should display workflow and all proposed consultants for task orders, and Section 3.3.1 information will be supplemented through Sections 3.3.2 through 3.3.5. Form 1295 is not required with the qualifications submission but will be necessary upon contract execution following selection.

Respondents unable to fulfill all parts of the scope of work must clearly identify which services they can provide and which services they would subcontract. A current contract holder exists for this service, posted on the TXSmartBuy site under FM2022-002. The lead contract specialist for inquiries is Nohemi Sanchez, reachable at (817) 272-4995. Bidders must acknowledge receipt of this addendum by signing and returning one copy of the notice or by noting receipt on the Bid Submittal Form. All other terms and conditions of the original solicitation documents remain unchanged and in full force and effect.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF FACILITIES MANAGEMENT

Box 19228 • 1225 W Mitchell Street • Wetsel Building, Suite 205 • Arlington, Texas 76019-0198

T 817-272-3571 • uta.edu/campus-ops/facilities

DATE: March 2, 2026 PAGE 1 of 1

BID INVITATION NUMBER: FM2026-004 Geotechnical and Construction Material Testing Services

BID OPENING DATE & TIME: March 12, 2026, at 2:00 PM CDT

CLARIFICATIONS:

Q: On Section 3.11 Execution of Offer: Can you please clarify whether that line is intended solely as a formatting separator or whether respondents are required to fill in that line with our authorized representative’s name and signature?

A: Please submit all of 3.11 section.

Q: On Section 5 Exhibits, can you please clarify whether we are required to submit Exhibits 1 and 2 as part of our Qualifications package? If these Exhibits are required to be submitted, please advise where they should be placed within the submission.

A: Exhibits 1 & 2 are for reference only and do not need to be submitted.

Q: On Section 3.1.4 Team Graphic, can you please confirm whether this should be a high-level organizational chart showing the Prime Firm at the top with Subconsultants branching out beneath it, or if another format is preferred?

A: Yes, that will work if it shows the workflow of the team and each consultant proposed for task orders.

Q: On Section 3.3.1 asks for a description, “in graphic and written form,” of project assignments and lines of authority and communication for principals and each consultant. Should this also be provided in an organizational chart that identifies the proposed personnel, their roles and responsibilities, and their reporting and communication structure?

ADDENDUM 2

OFFICE OF FACILITIES MANAGEMENT

Box 19198 • 701 South Nedderman Drive • University Administration Building, Suite 421 • Arlington, Texas 76019-0198

T 817-272-2584 • uta.edu/advancement *optional* *optional*

A: The organizational chart is different as the criteria required in section 3.3.1 will require the inclusion of the required information in sections 3.3.2, 3.3.3, 3.3.4, and 3.3.5.

Q: Can you please confirm whether Form 1295 is required with our Qualifications submission, or if it will only be required at the time of the contract execution once a selection has been made?

A: Form 1295 is only required at the time of contract execution once selection is made.

Q: Can you please disclose which firm(s) or individual(s) currently holds this contract?

A: There is a current firm that holds this contract, which is posted at the link below on TXSmartBuy site, https://www.txsmartbuy.gov/esbd/FM2022-002

Q: Do respondents need to fulfill all parts of the scope of work, or can they address only the services we are able to provide?

A: If unable to fulfill all parts of the scope please clearly list the services you can provide and the service you would subcontract.

Nohemi Sanchez Lead Contract Specialist (817) 272-4995

This addendum forms a part of the contract documents and modifies the original solicitation documents.

Acknowledge receipt of this Addendum in the space provided on the Bid Submittal Form, or by returning one (1) signed copy of this notice.

Make all changes identified above to the solicitation documents. All other terms and conditions in the solicitation documents remain unchanged and in full force and effect.

SIGNED: _______________________________________________________

COMPANY NAME: _______________________________________________

ADDENDUM 2

https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.txsmartbuy.gov%2Fesbd%2FFM2022-002&data=05%7C02%7Cnohemi.sanchez%40uta.edu%7C58b3b0a8f78144b4409008de786e4528%7C5cdc5b43d7be4caa8173729e3b0a62d9%7C0%7C0%7C639080612153638912%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=lgZ90Ql9TVnSstwZz%2B8d9cgFcBCezGFUNzi2dTjBiSk%3D&reserved=0

File details come from the government source that posted it. Updated .