ESBD_484485_1769032558276_Dwgs 04720002 Replace AHUs 11 Bldg.pdf

PDF 2 MB Posted

Attached to
Replace Air Handling Units
Solicitation number
IW237702
Issued by
Taylor County, Texas

About this file

This is an engineering drawing set prepared by the Texas Department of Criminal Justice (TDCJ) Facilities Division for the replacement of air handling units (AHUs) at Building 11 of Robertson Unit in Abilene, Texas. The project involves the removal and replacement of two existing air handling units (AHU 11-1 and AHU 11-2) located on the second floor of Building 11, with both units positioned behind louvers in the east and west mechanical rooms. The scope of work includes demolition of the existing AHUs and associated combustion air dampers, retention of the existing louvers and plenums if practical, installation of new replacement AHUs in the same locations as the existing units, and replacement of dampers with new units shipped with the new AHUs. The project is identified as MWR 04720002 and was prepared by Engineer Kevin Foran with a drawing date of April 23, 2021.

The drawing specifications note that louvers and plenums are to be reused if practical, and a crane is required to safely remove the existing units and position the new AHUs in place. The project specifications reference AHU direct replacement data sheet 90943 for additional technical requirements. Each AHU removal requires dismantling two 4-foot by 8-foot louvers, one 8-foot by 8-foot by 1-foot insulated plenum, and two 18-inch by 18-inch combustion air dampers. The site location for Robertson Unit is identified by GPS coordinates 32.55555 / -99.63333 near Abilene, Texas. Brand or manufacturer references in the specifications are descriptive only and indicate type and quality to be provided, with the approval of A/E-approved equivalents permitted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FO

A X

S E

A

T H

E S

HUNTSVILLE, TEXAS

ENGINEERING SERVICES

E

DRAWING INDEX

COVER SHEET

M1

T T

T

MECHANICAL PLAN & DEMO DETAILS

STATE-WIDE VIEW

REGIONAL VIEW

ROBERTSON

UNIT

REPLACE AIR HANDLING UNITS - 11 BLDG.

AREA VIEW

TYLER

HUNTSVILLE

AUSTIN

SAN ANTONIO

HOUSTON

DALLAS

LUBBOCK

AMARILLO

EL PASO

LAREDO

FT. WORTH

ABILENE, TEXAS

ROBERTSON UNIT

CORPUS CHRISTI

ABILENE

SITE LOCATION

GPS 32.55555 / -99.63333

ABILENE

FM 3522

FM

FM 3522

C R

09 C R

C R

JA

CK ROBERTS FWY

FM 3522

FM

FM 3522

C R

09 C R

C R

ROBERTSON

UNIT

MIDDLETON

UNIT

WORK SITE VIEW

N

SHEET 1/2

NN

THE TEXAS DEPARTMENT OF CRIMINAL JUSTICE

FACILITIES DIVISION

CONSTRUCTION

ROBERTSON UNIT

ABILENE, TEXAS

MWR 04720002

PROJECT LOCATIONS

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text o

AutoCAD SHX Text p

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AHU 11-2

BLOWER

HEATER

8' x 8' x 1' LINED PLENUM

(2) 58" x 21" OA DUCTS

(2) 4' x 8' L-1 LOUVERS

(2) 18" x 18" C.A. DAMPERS

TEXAS DEPARTMENT OF CRIMINAL JUSTICE

ENGINEERING SERVICES

ISSUE FOR: MWR:

M W

R

U N

IT

PR

O

JE

C

T N

AM

E:

ENGINEER:

DRAFTER:

DATE:

SCALE:

DESC:

ROBERTSON UNIT

REPLACE AIR HANDLING UNITS - 11 BLDG.

04720002

KEVIN FORAN

KF

SEE ABOVE

SHEET 2 of 2

MECHANICAL PLAN & DEMO DETAILS

M1

R O

BE

R

TS

O

N R

EP

LA

C E

AI

R

H

AN

D

LI

N G

U N

IT

S

- 1

BL

D

G

I1 CONSTRUCTION 04-23-2021

I2

I3

I4

I5

R1

R2

R3

R4

R5

ISSUE FOR: REVISIONS:DATE: DATE:

AHU 11-2

(INSTALLED BEHIND

LOUVERS ON 2ND FLOOR)

AHU 11-1

(INSTALLED BEHIND

LOUVERS ON 2ND FLOOR)

EAST

MECHANICAL

ROOM

2 - BLDG. 11 2ND FLOOR - PARTIAL FLOOR PLAN

WEST

MECHANICAL

ROOM

DEMO AHU11-2

AND OA DAMPER

REUSE LOUVERS

AND PLENUM

IF PRACTICAL

DEMO AHU 11-1

AND OA DAMPER

REUSE LOUVERS

AND PLENUM

IF PRACTICAL

BLDG. 11 NORTH WALL

4 - WEST MECHANICAL ROOM DETAIL3 - EAST MECHANICAL ROOM DETAIL

BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE

TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR

MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE THE LANGUAGE "OR

A/E APPROVED EQUAL". ANY BRAND OR MANUFACTURER MEETING SPECIFICATIONS

WILL BE CONSIDERED, IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL"

APPEARING IN CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.

5 - WEST MECHANICAL ROOM DETAIL

(EAST MECHANICAL ROOM IS SIMILAR)

1 - BLDG. 11 NORTH WALL

NOTES:

1. FOR EACH AIR HANDLING UNIT (AHU), REMOVE TWO 4' X 8'

LOUVERS, THE 8' X 8' X 1' INSULATED PLENUM, AND TWO

18" X 18" COMBUSTION AIR DAMPERS AS NEEDED TO

SAFELY REMOVE EXISTING AHU'S

2. THE LOUVERS AND PLENUM ARE TO BE REUSED IF

PRACTICAL.

3. THE DAMPERS ARE TO BE REPLACED WITH NEW DAMPERS

SHIPPED WITH THE NEW AHU.

4. USE CRANE TO SAFELY REMOVE EXISITING UNIT AND

LOCATE NEW AHU IN ITS PLACE.

5. INSTALL NEW AHU-11-1 AND AHU-11-2 IN SAME LOCATION

AS EXISTING.

6. SEE PROJECT SPECIFICATIONS FOR AHU DIRECT

REPLACEMENT DATA SHEET

90943

KEVIN FORAN

REEOR

P

DE

SAXETFOETATS

NIGNELANOISSEF

SNECIL

04/23/2021

AutoCAD SHX Text

AHU 11-2

AutoCAD SHX Text

AHU 11-1

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text J

AutoCAD SHX Text T

04720002 AHU-11-1 & -2 Cover
Sheets and Views
Cover 04720002
Dwgs 04720002 Replace AHUs 11 Bldg M1
Sheets and Views
M1

File details come from the government source that posted it. Updated .