About this file
This addendum modifies the procurement solicitation MR11005R for a Water Plant Control Update project issued by the Texas Parks and Wildlife Department Infrastructure Division for the Lake Corpus Christi State Park facility. The addendum extends the bid due date from December 11, 2025, to December 16, 2025, at 2:00 PM CT, with the public bid opening correspondingly rescheduled to December 16, 2025, at 3:00 PM CT. The project scope includes upgrading water plant control systems with specific technical modifications: replacement of existing water level gauges with ultrasound gauges featuring digital readout capability, integration of an air compressor into the new control panel, and replacement or repurposing of the existing Motor Control Center (MCC) to supply power to the new control panel rather than serving as the primary operational component.
The addendum addresses three critical questions submitted by bidders regarding equipment specifications and system integration. The owner's responses clarify that ultrasound gauges with digital readout are required in lieu of existing gauge styles, the air compressor must be wired directly into the new control panel rather than the MCC, and the MCC will function primarily as a power supply source unless bidders can propose alternative solutions. Bidders are required to acknowledge receipt of the addendum by physically or electronically signing and returning it with all other required submittals and bid documents via electronic mail. Contract Manager Anthony Habermann, CTCD, CTCM, oversees this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_465795_1763427936967_MR11005R_spc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Texas Parks and Wildlife Department Infrastructure Division
4200 Smith School Road Austin, Texas 78744
ADDENDUM
Addendum Number: 01 Dated: December 11, 2025
Solicitation Number: MR11005R
Solicitation Title: Water Plant Control Update
Due Date/Deadline: Revised December 16, 2025, at 2:00 PM CT
Contract Manager: Anthony Habermann, CTCD, CTCM
PURPOSE OF ADDENDUM: BID DUE DATE AMD PUBLIC BID OPENING DATE EXTENSIONS /
ANSWERS AND CLARIFICATIONS TO QUESTIONS SUBMITTED
Except as provided herein, all terms and conditions of the document referenced herein remain unchanged and in full force and effect. The following are official revisions, specifications and/or clarifications to this solicitation. This Addendum shall be attached to and form a part of the referenced solicitation document and any resulting awarded contract and must be considered in your response.
BID DUE DATE AND PUBLIC BID OPENING DATE EXTENSIONS
The bid’s due date is EXTENDED from December 11, 2025, to December 16, 2025, at 2:00 PM CT.
The Public Bid Opening is EXTENDED from December 11, 2025, to
December 16, 2025, at 3:00 PM CT.
OWNER’S WRITTEN RESPONSES TO BIDDER’S QUESTIONS
Q1: Water level gauges- Do you want the same gauges or a different style
A1: I would like to move to Ultrasound Gauges with digital readout
Q2: For the air compressor- Do we want it wired to the new control panel? The operator stated when we visited the site that it needed to be wired to the MCC. Please advise
A2: It needs to be wired into the New Control Panel
Q3: Reading the specs- I assume that the MCC will no longer be used other than to supply power to the new control panel correct? If yes this will answer my second question. Please advise.
A3: That would be my expectation unless you can show me a better option.
Respondents are to acknowledge receipt of this Addendum by physically or electronically signing this Addendum and returning it with the other required submittals and bid documents via electronic mail (email).