ESBD_450617_1756489402550_576XXSD001 ESBD Attachment 5.docx

DOCX document 44 KB Posted

Attached to
Request for Proposals for Statewide Environmental Documentation and Technical Services
Solicitation number
601CT0000005603
Issued by
Texas

About this file

I apologize, but I cannot provide a summary because no actual file content was included in your message. The text you shared only contains metadata about a file (GovTribe ID and filename) but does not include the actual document contents. To analyze the file, I would need the full text or detailed information from the document itself. Could you please upload or paste the complete file contents?

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR ATTACHMENTS 3-6

1.Attachments provided in ESBD/Bonfire must be used when submitting a response to RFP.
2.All positions shall exhibit knowledge pertaining to TxDOT standards specific to this RFP.
3.The table provided for each project and the response for each question shall not exceed two pages in length, in 12-point Arial, Franklin Gothic Book, Tahoma, or Helvetica Font. All fields in all tables must be completed.

ATTACHMENT 5

LEAD PUBLIC INVOLVEMENT SPECIALIST QUALIFICATIONS

INSTRUCTIONS:

1. Complete a form in the format below for the Lead Public Involvement Specialist Qualifications and Project Experience.

2. Lead Public Involvement Specialist’s experience must be within the last ten years.

3. A maximum of one per person can be proposed as the Lead Public Involvement Specialist.

4. The Lead Public Involvement Specialist submitted in the RFP shall be the Lead Public Involvement Specialist of the Contract.

5. The Lead Public Involvement Specialist must have one of the following: bachelor’s degree and six years of related public involvement experience or master’s degree and four years of related public involvement experience. Points will be based on the level of degree and years of experience.

6. The Lead Public Involvement Specialist must demonstrate successful management, through completion, of public outreach events for five transportation projects or non-transportation projects over the past ten years. At least two of the five public outreach events must be for transportation projects. At least two of the five public outreach events must be public hearings under 43 TAC Chapter 2 and 23 CFR §771.111(h). Planning and implementation of public meetings may be substituted for public hearings at a rate of two public meetings for one public hearing. Project descriptions must outline the type of outreach event, and the actions completed by the specialist that contributed to the successful completion of the outreach for the project.

7. Do not list more than the number of projects required to meet preferred qualifications.

NAME

Education (list two highest degrees):

Degree/Major
University
Date
Degree/Major
University
Date

Work Experience

[Insert description of relevant employment experience including employer/s, job title/s, employment dates, and project related job duties.]

PROJECT EXPERIENCE (repeat this section for each project)

Project Number for this submission 1:

Project Name:

Type of Public Outreach Event:

Transportation Related ☐ Yes ☐ No

Lead Public Involvement Specialist’s Job Title (during work on the project):

Project Location:

Project CSJ Number (if applicable):

Documentation Package Approval Date:

Project Client and Contact:

Project Description (outline the type of outreach event, and the actions completed by the specialist that contributed to the successful completion of the outreach for the project):

PROJECT EXPERIENCE (repeat this section for each project)

Project Number for this submission 2:

Project Name:

Type of Public Outreach Event:

Transportation Related ☐ Yes ☐ No

Lead Public Involvement Specialist’s Job Title (during work on the project):

Project Location:

Project CSJ Number (if applicable):

Documentation Package Approval Date:

Project Client and Contact:

Project Description (outline the type of outreach event, and the actions completed by the specialist that contributed to the successful completion of the outreach for the project):

PROJECT EXPERIENCE (repeat this section for each project)

Project Number for this submission 3:

Project Name:

Type of Public Outreach Event:

Transportation Related ☐ Yes ☐ No

Lead Public Involvement Specialist’s Job Title (during work on the project):

Project Location:

Project CSJ Number (if applicable):

Documentation Package Approval Date:

Project Client and Contact:

Project Description (outline the type of outreach event, and the actions completed by the specialist that contributed to the successful completion of the outreach for the project):

PROJECT EXPERIENCE (repeat this section for each project)

Project Number for this submission 4:

Project Name:

Type of Public Outreach Event:

Transportation Related ☐ Yes ☐ No

Lead Public Involvement Specialist’s Job Title (during work on the project):

Project Location:

Project CSJ Number (if applicable):

Documentation Package Approval Date:

Project Client and Contact:

Project Description (outline the type of outreach event, and the actions completed by the specialist that contributed to the successful completion of the outreach for the project):

PROJECT EXPERIENCE (repeat this section for each project)

Project Number for this submission 5:

Project Name:

Type of Public Outreach Event:

Transportation Related ☐ Yes ☐ No

Lead Public Involvement Specialist’s Job Title (during work on the project):

Project Location:

Project CSJ Number (if applicable):

Documentation Package Approval Date:

Project Client and Contact:

Project Description (outline the type of outreach event, and the actions completed by the specialist that contributed to the successful completion of the outreach for the project):

File details come from the government source that posted it. Updated .