ESBD_442698_1754321412611_25-094 RFP (CSP) Krenek Tap Rehabilitation - ESBD.pdf
PDF 272 KB Posted
- Attached to
- Krenek Tap Rehabilitation
- Solicitation number
- 25094
- Issued by
- Brazos County, Texas
About this file
This is a Request for Competitive Sealed Proposals (RFP No. 25-094) issued by the City of College Station, Texas for the Krenek Tap Rehabilitation project (Project No ST2101). The project involves constructing approximately one mile of roadway on Krenek Tap between Texas Avenue and the southbound frontage road for SH6, including removal and replacement of existing concrete pavement with a new concrete section featuring 10-foot shared use paths (SUP) on both sides. Additional work includes replacing approximately 2,000 linear feet of existing sanitary sewer via pipe burst, replacing storm water sewer, relocating 4 street light poles, installing fiber optic conduit along the corridor, and relocating traffic signal infrastructure at Texas Avenue. Proposals are due Thursday, August 28, 2025 at 2:00 p.m. CT, with substantial completion required within 365 calendar days. A non-mandatory pre-proposal meeting is scheduled for Wednesday, August 13, 2025 at 2:00 p.m. CT at City Hall, and the deadline for written questions is Wednesday, August 20, 2025 at 2:00 p.m. CT.
The project requires expertise in road construction/repair, concrete pavement placement, utility construction, traffic control, traffic signal installation, fiber optic conduit installation, and erosion control. All roadway and utility construction must comply with B/CS United 2020 Standard Details and Specifications. Contractors must provide a 5% bid security and coordinate bi-weekly progress meetings with City of College Station project management, inspectors, and Binkley and Barfield throughout construction. Work hours are restricted to 8:00 AM to 5:00 PM, and the contractor is responsible for traffic control, Storm Water Pollution Prevention Plan (SWPPP) implementation, utility locates, material storage coordination, and maintaining drainage features during construction. Proposals may be submitted electronically through the Brazos Valley e-Marketplace or as hardcopy originals to the City's Purchasing Division.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR
COMPETITIVE SEALED PROPOSALS
AND
CONTRACT DOCUMENTS
RFP NO. 25-094
THURSDAY, AUGUST 28, 2025 @ 2:00 P.M. CT
City of College Station, Texas Purchasing Division – City Hall
1101 Texas Avenue College Station, Texas 77840 www.cstx.gov http://www.cstx.gov/
INSTRUCTION TO OFFERORS
1.0 ADVERTISEMENT
Sealed competitive proposals addressed to the City of College Station, Texas will be received for:
Krenek Tap Rehabilitation RFP Number 25-094 Project No ST2101 until 2:00 p.m. CT, Thursday, August 28, 2025, after which time all qualified proposals will be opened via Teams meeting and summary prices will be read aloud. Proposals received after the specified submission deadline will not be accepted.
LOCATION AND DESCRIPTION OF PROJECT
Project Description: The project involves the construction of approximately one mile on Krenek Tap between Texas Ave and the southbound frontage road for SH6. The existing concrete will be removed and replaced with a new concrete section that will include a 10-foot SUP on both sides of the road. Construction will also replace approximately 2,000 linear feet of existing sanity sewer via pipe burst, replace existing storm water sewer, relocation of 4 street light poles, fiber optic conduit the length of the corridor, and relocation of some traffic signal infrastructure at Texas Ave.
All proposals shall follow the format provided by the City of College Station. The City is seeking a construction company with quality experience in road and utility reconstruction.
Statement of Work:
• Removal of existing pavement, base, and utilities.
• Subgrade preparation and construction of concrete pavement.
• Construction of water/waste water line and storm sewer.
• Traffic Signal and Camera installation.
• Contractor shall coordinate all work, inspections, and approvals with the City of College
Station.
• Contractor shall coordinate with residents for removals and access.
• Contractor shall not disrupt solid waste collection or postal services.
• Project shall comply with the United States Occupational Safety & Health Administration regulations.
• Methods & Means of construction shall be compliant with all applicable Federal, State, and Local regulations. This includes obtaining all necessary permits and inspections.
• Contractor to adhere to City of College Station construction administration procedures.
• Maintain and submit all project records such as record drawings, project manuals, and warranties for approval by the City of College Station.
The above list is intended to enhance the statement of work and is not intended to limit the respondent’s description of the project’s process or services provided.
This project shall require expertise in the following construction areas:
• Road Construction/Repair
• Placement of Concrete for Pavement
• Signage and Pavement Markings
• Utility Construction
• Traffic Control
• Traffic Signal Installation
• Fiber optic conduit installation
• Erosion Control
Construction Progress Meetings: The contractor is expected to orchestrate on-site project meetings with the COCS PM, COCS Inspector, and Binkley and Barfield on a bi-weekly basis throughout construction. All unusually found conditions shall result in a meeting called to review the conditions and design.
Project Specifications: All roadway and utility (storm) construction shall be in accordance with B/CS United 2020 Standard Details and Specifications.
Project Schedule: This construction must achieve substantial completion within 365 calendar days. All work shall be performed after 8:00 AM and before 5 PM.
Traffic Control: The contractor is responsible for traffic control during Construction. See Traffic Control Plans included in the bid set.
Project Parking, Equipment, and Material Storage: The Contractor's equipment and materials may be stored in closed drive lanes as designated in the Traffic Control Plan. Private automobiles should be parked away from the site and the work force brought in. The Contractor may obtain additional offsite parking and storage area(s). Written permission from the property owner(s) allowing the use of such areas will be required to be submitted prior to the use of such areas. Any areas damaged by the parking, equipment, or material storage, etc. shall be repaired to “as good or better” condition including re-grading and revegetation as required. These repairs are the expense of the contractor.
The contractor shall call for locates and re-fresh the locates as required by the utility companies.
ALL locate tickets shall be submitted to the COCS project manager.
Erosion Control: The Contractor is responsible for providing and implementing the Storm Water Pollution Prevention Plan (SWPPP) and submitting the “Notice of Intent” (NOI) and “Notice of Termination” (NOT) applications to comply with the terms and conditions of the General Texas Pollutant Discharge Elimination System (TPDES, TCEQ Construction General Permit No. TXR 150000.) Additional requirements and links for these forms are provided in the B/CS specification 106, Erosion and Sediment Control. See sheets 153-161 for initial SWPPP. This shall be modified by the contractor as necessary.
Submittals: The Contractor shall submit to the City's Project Manager for review and approval all items required in the specification plus the following items prior to beginning work:
• Work Plan indicating sequence and schedule
• Material Storage Location(s)
• Subcontractors to be used if applicable (Nursery, Landscaping, Irrigation, etc.
• Erosion Control Plan & NOI
• Concrete Mix Design and Materials
• Other submittals as required by BCS United Specifications.
The contractor shall designate long lead time items at the time of submittal. The contractor shall assume fourteen (14) calendars days review time for all submittals. Please note that fourteen days does not mean that the submittal will be deemed compliant.
Differing Site Conditions: Existing site conditions shall be determined through a combination of the improvement plans and visual evidence in the field. Surface facilities such as valves or linear patches shall be considered sufficient evidence that an underground facility exists in that location. The Contractor shall pothole and physically verify the location and depths of all underground utilities and structures prior to work in that area of the project. Damage to structures or facilities shown on the improvement plans, marked in the field, or surmised from visual evidence shall be the sole responsibility of the Contractor. Relocation of or damage to structures or facilities which have been found in the field to conflict with the proposed improvements and could have been surmised from the plans or visual evidence in the field shall be performed by the Contractor at no extra expense as they are considered subsidiary to the item of work being performed.
Protection of Existing Facilities and Structures: It shall be the sole responsibility of the Contractor to protect all existing facilities from damage caused by or arising out of the work. The Contractor shall utilize such methods as he deems necessary to progress with the work without causing damage to facilities or structures both above and below ground.
Methods employed by the Contractor which, in the opinion of the City's Representative, are causing or will cause damage to existing structures or facilities will be modified or terminated upon written notice of such damage to the Contractor by the City's Representative, with no delay or damage charges payable to the Contractor for compliance with this section.
Before submitting a Bid, each Bidder will be responsible to make or obtain such explorations, tests and data concerning physical conditions (surface, subsurface, and underground facilities) at or contiguous to the site, or otherwise which may affect cost, progress, performance or furnishing of the Work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the terms and conditions of the Bidding Documents.
The contractor shall maintain all drainage features during construction. Any drainage ditch or structure disturbed during construction shall be restored to the satisfaction of the owning authority.
All work shall follow the NPDES requirements. All costs associated with maintaining drainage should be subsidiary to appropriate SWPPP item.
A Pre-Proposal Meeting will be held at 2:00 p.m. CT Wednesday, August 13, 2025. At City Hall, 3rd floor Fiscal Services, Conference Room 1. This meeting is not mandatory attendance is highly recommended.
Questions and inquiries about this RFP should be submitted in writing via the Q&A feature available through the Brazos Valley e-Marketplace (“Bidding System”). The deadline for submitting written requests for clarification is Wednesday, August 20, 2025, at 2:00 p.m. CT.
Solicitation documents are available for download from the Bidding System. To download solicitation documents, upload proposals and to submit questions online, vendors must be registered with the Bidding System. To register online, please visit the Bidding System and click on Supplier Registration.
The City will accept electronic proposals or hardcopy (original) proposals. Proposals received after the specified submission deadline will not be accepted.
• Electronic: To submit electronically, a single PDF of the proposal package and a single PDF of the 5% bid bond (see Section 14.0 Security) must be uploaded to the Bidding System under the RFP’s Response Attachments tab. Confirm these files are uploaded prior to clicking Submit Response. A Help file is available to Offerors regarding online submissions by clicking on the Help link located at the upper right side of the Bidding System screen. *Please note that the City of College Station is not responsible for high internet traffic/demand at or near the time the response packages are due and that firms submitting their response package during peak traffic times risk their submittal not being received by the due date and time.
• Hardcopy (Original): Hand-delivered proposal packages shall be submitted to the Purchasing Division in a sealed envelope marked with the RFP number, project title, and the name/address of the Offeror. Proposals delivered to the Purchasing Division via US Mail or other delivery system shall be in a sealed envelope within the mailing/shipping envelope with “PROPOSAL ENCLOSED” noted on the face of the mailing/shipping envelope. Proposal packages shall include one (1) unbound original proposal, one (1) electronic copy (PDF) of the proposal on a USB drive, a 5% bid security (see Section 14.0 Security) and other documents as required. Delivery methods:
Hand-deliver, Mail or Ship to:
City of College Station – Purchasing Division 1101 Texas Avenue (3rd floor) College Station, Texas 77840
***Five (5) percent bid security is required***
END OF ADVERTISEMENT