ESBD_441413_1753896163223_Attachment H - RFP 0006050 Substitution Request Form.pdf
PDF 277 KB Posted
- Attached to
- RFP 0006050 TSBVI Playground Equipment, Surfacing, Shade Canopy9s0, and Outdoor Furniture
- Solicitation number
- 0006050
- Issued by
- Texas
About this file
The document is a Substitution Request Form for the Texas School for the Blind and Visually Impaired (TSBVI) Playground Equipment project, managed by the Texas Facilities Commission (TFC) with project number 24-054-2561. The project involves playground equipment, surfacing, shade canopies, and outdoor furniture, with McKinney York Architects, Inc. serving as the architectural firm. The form is specifically Section 012501 and dated April 5, 2025, providing a standardized template for contractors to request product substitutions during the construction process.
The form is designed to comprehensively document and evaluate proposed product substitutions, requiring detailed information about the original specified product and the proposed alternative. Key sections include physical characteristics comparison, performance attributes, warranty details, maintenance services, spare parts availability, code requirements, ADA compliance, and sustainable design features. The form also includes a contractor certification section where the proposer must affirm that the substitution is equal or superior to the original specification, will not adversely affect the project timeline or other trades, and provides complete cost and time impact information. The final sections are reserved for Architect/Engineer and Owner review and approval of the substitution request.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 012501 - SUBSTITUTION REQUEST FORM
SUBSTITUTION REQUEST FORM 012501 - 1
PROJECT INFORMATION
Project Name: A/E Project No.:
Address:
Substitution Req # Issue Date:
From:
Copies to:
SPECIFIED PRODUCT, MATERIAL, SYSTEM OR EQUIPMENT IN THE CONTRACT DOCUMENTS:
Specification Title: Section Number
Page#
Article/Paragraph:
Item Specified:
Drawing No./Detail: Drawing Issue Date:
PROPOSED SUBSTITUTION:
Model No: Product Age New 1-4 years old 5-10 years old 10+ years old
Manufacturer: Tel:
Address:
Installer: Tel:
Address:
REASON FOR NOT PROVIDING SPECIFIED ITEM:
Substitutions for Cause: Substitutions for Convenience:
Product is no longer available due to: Contractor Initiated
Strike/Lockout Mfr./Supplier Bankruptcy Owner Initiated
Regulatory Changes. Will reduce construction time by ____days
Changed Product Compatibility or Warranty Terms Will result in cost savings of $_____________.
Other: Other Advantage:
Attachments Included:
Drawings Product Data Samples
Test Reports Comparative Data Research & Evaluation Reports
LIST (2) SIMILAR INSTALLATIONS OF REQUESTED SUBSTITUTE:
Project: 1 Date Installed:
Address:
Owner Tel:
Project: 2 Date Installed:
Address:
Owner: Tel:
COMPARISONS OF THE SPECIFIED ITEM AND THE PROPOSED SUBSTITUTION:
TSBVI Playground Equipment General Requirements TFC Project Number: 24-054-2561
CD 100
April 5, 2025
McKinney York Architects, Inc.
2112-5
1100 W. 45th Street, Austin, Texas, 78756
Playground Equipment, Surfacing, Shade Canopy(s), and Outdoor Furniture Package for Texas School for the Blind and Visually Impaired
SUBSTITUTION REQUEST FORM 012501 - 2
PHYSICAL CHARACTERISTICS: Compare physical characteristics of proposed product:
Items: Specified Product: Proposed Product:
Supplier/Distributor:
Mfr./Rep:
Size:
Weight:
Appearance:
PERFORMANCE: Insert testing feature/attributes, test protocol and performance below:
Features/Attributes Test Protocol Specified Performance: Proposed Performance
WARRANTY: Proposed product offers the same warranty? Yes No; explain
MAINTENANCE SERVICE: Same day service available? Yes No; explain:
SPARE PARTS: Source/Location:
CODE REQUIREMENTS
Reference Testing Items: Specified Product: Proposed Product:
ADA COMPLIANCE: Yes No; explain:
SUSTAINABLE DESIGN
Features/Attributes: Specified Product: Proposed Product:
TSBVI Playground Equipment General Requirements TFC Project Number: 24-054-2561
CD 100
April 5, 2025
McKinney York Architects, Inc.
SUBSTITUTION REQUEST FORM 012501 - 3
CHANGE: Describe changes required in other elements of the Work to accommodate the proposed substitution, including work performed by the Owner and separate contractors:
IMPACT: Describe the impact the proposed substitution will have on the work schedule in comparison to the work schedule without approval of the proposed substitution:
Proposed Change in Contract Time: Yes No [Add] [Deduct] ___________________Days.
COST: Define detailed cost impact of the proposed substitution in relation to the originally specified item, including related modifications required to other Work:
Savings to the Owner for accepting substitution $______________________________
Contractor’s Certification/Waiver: Substitutions after Award of Contract shall be made effective only by Change Order and shall not relieve the proposer from responsibility for deficiencies that may exist in the substituted product, departure, or deviation from the Contract Documents. The Undersigned certify:
1. Except as otherwise expressly defined by this Request for Substitution and approved by Change Order, signer warrants that the proposed substitution:
a. Has been fully investigated and determined to be equal or superior to specified product.
b. Will satisfy requirements of the original specified product, material or equipment, including but not limited to appearance, quality, performance, code compliance, sustainability, and warranty.
c. Will have equal maintenance service and replacement part sourcing as the original
d. Will not have an adverse effect on other trades nor affect or delay progress schedule.
e. Will not affect dimensions, functional clearances or be incompatible with adjacent materials.
f. Will not affect compliance with a building code or performance standard in effect for project.
2. Cost data and change in contract time stated are complete. Claims for additional costs or additional time related to accepted substitution which may subsequently become apparent are waived.
3. If substitution affects a correlated function, adjacent construction, or the work of other trades or contractors, the necessary changes and modifications to the affected work shall be considered as an essential part of the proposed substitution, to be accomplished by the Contractor without additional expense to the Owner.
4. Payment will be made for changes to building design, including A/E design, detailing and construction costs caused by the substitution.
5. Coordination, installation, and changes in the Work necessary for accepted substation will be complete in all respects.
Contractor’s Signature: Date:
General Requirements TFC Project Number: 24-054-2561
CD 100
SUBSTITUTION REQUEST FORM 012501 - 4
ARCHITECT/ENGINEER’S REVIEW AND RESPONSE:
Conditions of Acceptance: Approval relies on data submitted, and the opinion, knowledge, information, and belief of the Architect/Engineer at the time decision is rendered. Approval is conditional in nature, and subject to re-evaluation and reconsideration, if additional data or materials submitted, or coordination with other work is observed to invalidate claims that substitution is equal to items originally specified.
Substitution Approved -- Make submittals and prepare Change Order
Substitution Approved as Noted -- Make submittals and prepare Change Order
Substitution Rejected -- Use specified materials.
Substitution Received too late -- Use specified materials.
More Information Required
Signed By: Date:
OWNER'S REVIEW AND RECOMMENDATIONS:
Substitution Approved -- Make submittals and prepare Change Order
Substitution Approved as Noted -- Make submittals and prepare Change Order
Substitution Rejected -- Use specified materials.
Signed By: Date:
END OF SECTION 012501
General Requirements TFC Project Number: 24-054-2561