New Park Development at Powderhorn State Park
Solicitation number
1210003 Powderhorn SP CMR
Issued by
Cameron County, Texas

About this file

This Notice to Offerors is issued by the Texas Parks and Wildlife Department (TPWD) for a Construction Manager at Risk (CMR) project for the New Park Development at Powderhorn State Park in Calhoun County, Texas. The project involves comprehensive park development with a total estimated cost of $53,000,000, and proposals will be received until 2:00 PM (CT) on September 30, 2025. The scope includes pre-construction services and construction of park facilities, encompassing day use facilities (like visitor centers, recreation halls, and wildlife viewing structures), camping facilities (including RV sites, mini cabins, and primitive camping areas), and site infrastructure such as roadways, trails, parking lots, and shoreline restoration. An online pre-proposal conference is scheduled for September 2, 2025, and two optional site visits are offered on September 3 and 4, 2025. The contract performance period is estimated at 1,440 calendar days, with 640 days for preconstruction and 800 days for construction.

The project emphasizes sustainability, incorporating systems like solar power, green stormwater infrastructure, rain-water collection, electric charging stations, and wind turbines. Proposals will be evaluated for "best value" based on criteria in Section 4 of the CMR and Attachment B. The development will include extensive utilities infrastructure (water, wastewater, electrical, teledata, security, radio) and diverse facilities ranging from visitor complexes and fishing piers to maintenance buildings and residences. Potential offerors are strongly encouraged to attend the pre-proposal conference and site visits, with the understanding that failure to consider site conditions will not constitute grounds for additional compensation. Solicitation documents can be downloaded from the Electronic State Business Daily website.

View the file

Other files

File Type Posted
1210003_RFP_CMR_Powderhorn.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice to Offerors (050619) Page 1 of 2

NOTICE TO OFFERORS

Sealed proposals for Construction Manager at Risk will be received by the Contracting Branch, Infrastructure Division, Texas Parks and Wildlife Department, 4200 Smith School Road, Austin, Texas 78744, UNTIL 2:00 P.M (CT), SEPTEMBER 30, 2025 for Project Number 1210003 New Park Development at Powderhorn State Park, Calhoun County, Texas. Proposals will be received and recorded in the A-100 Conference Room at Austin Headquarters.

No Pricing information will be publicly released until a contract has been executed between TPWD and the successful Offeror. Cost of work is estimated at $53,000,000.00.

Project Summary:

The scope of this project includes pre-construction services and construction of the new park development for Powderhorn State Park.

The project will include but is not limited to:

1. Site Elements/ development

2. Utility Infrastructure - Wastewater, water, electrical, data, radio

3. Structures

4. Sustainable Systems

Day Use Facilities:

1. Visitor Complex: Visitor Center, Interpretive Center, Park Headquarters, & Restrooms

2. Recreation Hall

3. Historic Ranch House - Adaptive Re-use

4. Group Restrooms

5. Picnic Shelter (6-12)

6. Wildlife Viewing Structure

7. Wildlife Viewing Platforms (4)

8. Vault Toilets

9. Paddle Launch

10. Fishing Pier - Matagorda Bay

11. Fishing Pier - Powderhorn Lake

Camping Facilities:

12. RV Sites (24)

13. Mini Cabins (14)

14. Tent Camping & w/ shelter (12)

15. Group Site

16. Primitive Camping - Backcountry (6-12)

17. Primitive Camping - Kayak (2)

18. Restroom with showers

19. Vault Toilets (2)

Other Facilities:

20. Maintenance & Support building/ yard

21. Residences (2)

22. RV Staff Parking (3)

23. Camp Host RV Parking (6)

Site:

24. Paved Roadways ~ 9 miles

25. Gravel Roadways~ 3.5 miles

26. Trails~ 8-12 miles

27. Boardwalk Trails~ 2 miles

28. Main Parking Lots (3)

29. Existing Cemetery Repairs & Fencing

30. Park Entrance & Monument

31. Bulkhead Replacement

32. Shoreline Restoration

33. Nature Playscape

Notice to Offerors (050619) Page 2 of 2

Utilities:

34. Water, wastewater, electrical, teledata, security, radio

Sustainability Systems:

35. Solar, solar hot water, green stormwater infrastructure (GSI), rain-water collection, EC charging stations, wind turbines

Note: Square footages, linear feet, miles, and quantities here are approximate. The Design Professional will evaluate and confirm program needs and requirements for each facility and its site.

Proposal Evaluation Criteria:

Proposals will be evaluated for “best value” as determined by the Owner based on established criteria identified in Section 4 of the CMR and Attachment B.

Contract Term:

For planning purposes, the preconstruction performance period is estimated to be six hundred forty (640) calendar days.

The construction performance period is projected for a term of eight hundred (800) calendar days except as may be otherwise amended or negotiated. The total contract performance period is estimated to be one thousand four hundred and forty (1,440) calendar days.

On-Line Pre-Proposal Conference:

TPWD will host an On-line pre-proposal conference via Microsoft® Teams on September 2, 2025 at 2:00 PM (CT) to discuss solicitation requirements. Although the pre-proposal conference is not mandatory, bidders are strongly encouraged to attend as important information regarding proposal submittal requirements, and an overview of the Project will be discussed. Failure to consider conditions when preparing the proposal will not constitute grounds for additional compensation.

The on-line pre-proposal conference will be conducted using Microsoft® Teams Webinar. Registration is required to attend the pre-proposal conference using the following link: After registration, you will receive a confirmation email with a link to join the event.

https://events.gcc.teams.microsoft.com/event/b5dc528f-3bc6-4b05-9bde-34c2991bd198@7864fda7-62ad-47ec-81ec- 323266e3a35f

Following the on-line video conference, the PowerPoint™ presentation will be posted to the Electronic State Business Daily.

Pre-proposal Site Visit:

TPWD is offering two (2) site visit options on separate days and times. Offerors may choose to attend the one that best fits their schedule. Please plan to arrive at the front gate of Powderhorn Wildlife Management Area (WMA) at the designated start time. Plan for a three (3) hour visit to allow adequate time to view the entire site.

Site Visit Options:

• Wednesday, September 3, 2025, at 1:00 PM (CT)

• Thursday, September 4, 2025, at 9:00 AM (CT)

Meeting Location: Powderhorn WMA – Front Gate Address: 10769 FM 1289, Port O’Connor, TX 77982

A site visit is not mandatory; however, Owner strongly encourages potential Offerors to view the project site and offers no guarantee that the project site will be accessible to potential Offerors at any time other than the time specified in this solicitation. Failure to consider site conditions when preparing the proposal will not constitute grounds for additional compensation.

To view and download Solicitation Documents, visit the Electronic State Business Daily web site:

https://www.txsmartbuy.gov/esbd https://events.gcc.teams.microsoft.com/event/b5dc528f-3bc6-4b05-9bde-34c2991bd198@7864fda7-62ad-47ec-81ec-323266e3a35f https://events.gcc.teams.microsoft.com/event/b5dc528f-3bc6-4b05-9bde-34c2991bd198@7864fda7-62ad-47ec-81ec-323266e3a35f https://www.txsmartbuy.gov/esbd