ESBD_409339_1744234322739_SOW.pdf

PDF 69 KB Posted

Attached to
Leveling of the Chapel at the Jester III Unit
Solicitation number
IW215553
Issued by
Fort Bend County, Texas

About this file

The document is a Statement of Work for the Level Jester III Chapel Floor project, involving the Texas Department of Criminal Justice (TDCJ) as the Owner. The scope of work includes comprehensive foundation and building rehabilitation services, specifically focusing on raising the building 4 to 6 inches in some areas, disconnecting and potentially reinstalling plumbing, inspecting and addressing block and pad foundation issues, and installing precast concrete foundation with specific dimensional requirements. The contractor will be responsible for labor, equipment, workman's compensation, and general liability insurance, while the work will involve replacing rotted or deteriorated floor joists and sills.

The document outlines a detailed allocation of responsibilities between the contractor and TDCJ, with the owner agreeing to handle numerous logistical and administrative tasks such as contents removal, utility disconnection, permit acquisition, and ensuring building code compliance. The parties acknowledge that project scheduling will be subject to potential weather-related delays, and the owner will be responsible for the building's well-being in case of damage from fire, vandalism, or Acts of God. Notably, the cost of materials for foundation work and additional labor will be at the owner's expense, and the contractor is explicitly not responsible for reinstalling exterior siding or masonry that has been removed during the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .