About this file

The document is a Request for Proposals (RFP No. 809-25-0004) issued by the State Preservation Board (SPB) for a sealant replacement project at the Texas Capitol Grounds and the Bob Bullock Texas State History Museum in Austin. The project involves removing, cleaning, prepping, and replacing existing polyurethane and silicone sealant joints on sidewalks and plazas at both locations. The original sealant was installed in 1997 and 2000, respectively, and has deteriorated due to traffic, weather exposure, and improper installation. The anticipated project schedule is 8 months, with work to be coordinated carefully around legislative sessions, museum operations, and existing site activities.

The SPB is seeking a contractor to provide all necessary labor, materials, insurance, equipment, and supervision for the waterproofing and sealant replacement. The project requires extensive coordination with the SPB project manager, including phased installation, work area protection, and minimal disruption to site operations. Special requirements include ensuring safety, protecting pedestrian and ADA paths, managing construction debris, and coordinating with landscaping and site maintenance. The contractor will have limited on-site parking (up to 3 vehicles) and must coordinate material deliveries and storage with the owner's representative. No owner-supplied materials or equipment will be available for contractor use.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State Preservation Board

REQUEST FOR PROPOSALS

RFP No. 809-25-0004

FOR

Capitol Grounds and Bullock Texas State History Museum Sealant Replacement

ATTACHMENT A: SCOPE OF WORK

RFP No. 809-25-0004

CAPITOL GROUNDS AND BULLOCK TEXAS STATE HISTORY MUSEUM PLAZA AND SIDEWALK

SEALANT REPLACEMENT PROJECT

ATTACHMENT A: SCOPE OF WORK

DETAILED DESCRIPTION OF SERVICES REQUESTED

BACKGROUND

The State Preservation Board (SPB) has a unique and diverse mission to preserve, maintain, and restore historic properties entrusted to its care. The quality of service is evident to occupants and those who visit historic spaces in the Capitol and Grounds, Texas State Cemetery, Governor’s Mansion and Bullock Texas State History Museum. Day-to-day operations range from daily housekeeping, maintenance and groundskeeping to curating and preserving over 4,000 historic artifacts in its collection and on loan.

The Texas Capitol Grounds sidewalk and plaza sealant was installed in 1997 with some select sealant repairs and replacement in different areas over the last twenty-seven years. The Bob Bullock Texas State History Museum Plaza and Sidewalks polyurethane and silicone sealant was installed in 2000 and has had some sealant joints repaired or replaced over the last twenty-four years. Polyurethane horizontal flatwork joints and silicone joints at both sites are all exhibiting varying degrees of fatigue and failure due to excessive traffic, exposure to the elements, and improper installation.

This Project aims to remove, clean, prep, and properly install new sealant joints in all locations as indicated in the provided drawings.

The selected Contractor shall complete the work, as listed in the attached drawings and specifications in this Attachment A – Scope of Work and Attachment B – Drawings & Specifications.

1. SCOPE OF WORK

SPB is accepting bids to furnish all labor, materials, insurance, equipment, and supervision necessary to perform waterproofing, remove, clean, prep, and replace existing backing and sealants on the Texas Capitol Grounds located at 1100 Congress Ave., Austin, Texas 78701 and the plaza and sidewalks of the Bullock State History Museum located at 1800 Congress Ave. Austin, Texas 78701.

2. PROJECT SCHEDULE

Anticipate an 8 month schedule for work. Contractor will be required to coordinate with the SPB project manager for phasing the install, work area protection, material delivery, and be flexible working around both sites depending on building operation schedule. Sealant work at the Great Walk and South Entrance to the Capitol will be coordinated at the beginning of the project with the SPB project manager and SPB events coordinator to minimize or eliminate any disruption to legislative session and any planned events or demonstrations.

3. SPECIAL REQUIREMENTS

A. Take Precautions to ensure safety of people, including building users, passers-by, workmen, and animals, and protection of property, including adjacent building elements, landscaping, and motor vehicles.

B. Coordinate with owner to provide signage for alternate routes around work areas.

C. Maintain clear area off of designated ADA paths.

D. Sealant work on designated ADA paths will take place outside of Capitol Grounds hours. 8pm-

7am.

E. Coordinate sequencing of all curb and sidewalk sealant that affects parking or traffic patterns with Owner’s Representative.

F. Provide a two week lookahead for sealant work.

G. Provide 2-3 day notice for any affected building and site operations.

H. Protect work from regular landscaping maintenance. (Landscaping services typically take place every Wednesday.)

I. Prevent construction debris and other materials from coming into contact with pedestrians, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact.

J. Protect paving and sidewalks, and adjacent building areas from mechanical damage due to material staging and other equipment.

K. Limit access to work areas.

L. Comply with sealant manufacturer’ written instructions for protecting building and other surfaces against damage from exposure to its products.

M. Cover adjacent surfaces with materials that are proven resistant to sealant.

N. Cover and secure wet sealant joints with durable material until sealant is fully cured. (Blue tape over Masonite, sheet metal, or similar)

• Squirrels, birds, crickets, and falling leaves or similar intrusions have occurred in the past.

O. Assume responsibility for injury to persons or damage to property due to work, and remedy at no cost to Owner.

4. OWNER SUPPLIED MATERIALS

A. No Owner supplied materials or equipment will be available for contractor use.

B. The Owner does not lend its lifts or ladders for contractor use.

5. ACCESS AND USE OF FACILITIES

A. Access to the facility will be coordinated through the Owner's project manager.

B. Parking for personnel on the grounds can accommodate up to 3 vehicles in Owner’s designated spaces.

C. Additional parking for personnel can be provided within 2 blocks of Capitol.

D. Deliveries of equipment or materials must be coordinated with the Owner’s Representative with at least 3 day's notice.

E. Storing of materials in a cool, dry place can be coordinated with the Owner’s representative.

6. CONTRACTOR USE OF SITE AND PREMISES

A. Maintain a clean and tidy work area.

B. Maintain clear paths of vehicular egress during construction: provide temporary exit or rerouting signs if routes are temporarily altered.

C. Maintain clear paths on pedestrian ADA routes through and around the project site. Coordinate with SPB Project Manager prior to any work affecting ADA parking spots or pedestrian paths at least 3-4 days prior to commencing work.

2. PROJECT SCHEDULE
3. SPECIAL REQUIREMENTS
4. OWNER SUPPLIED MATERIALS
5. ACCESS AND USE OF FACILITIES
6. CONTRACTOR USE OF SITE AND PREMISES