ESBD_402919_1742220520737_IW212160 SOW.pdf

PDF 3 MB Posted

Attached to
Clements Unit Replace Air Handlers Law Library Bldg. 10
Solicitation number
696-5-IW212160
Issued by
Texas

About this file

Based on the document, this is a detailed construction specification from the Texas Department of Criminal Justice (TDCJ) for replacing an Air Handling Unit (AHU) at the Clements Unit Law Library. The project involves replacing the existing AHU-10 in the Building Law Library, with work to be completed by 5/30/2024. The specifications cover multiple technical divisions including mechanical, electrical, and duct work requirements, with comprehensive guidelines for installation, materials, equipment, field services, warranties, and execution standards.

The project requires a licensed HVAC contractor with at least five years of experience, specifically a Class A HVAC contractor licensed in Texas. The specifications outline strict requirements for equipment, including outdoor packaged central-station air handling units with specific performance standards such as conforming to ANSI/ASHRAE standards, having an Energy Efficiency Ratio (EER) of 10.5 or greater, and meeting various safety and operational criteria. The document provides detailed technical specifications for components like fans, compressors, heating sections, refrigerant components, controls, and electrical requirements, ensuring a comprehensive and precise replacement of the existing air handling unit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .