This addendum from the Texas Parks and Wildlife Department (TPWD) provides clarifications and answers to questions regarding solicitation #802-25-55975 for the Installation of New Manufactured Housing Units at Lake Livingston and Mission Tejas State Park. The document, dated February 18, 2025, maintains the original submission deadline of March 4, 2025, at 2:00 PM CT.
The addendum clarifies eight specific items, including confirmation that the red certification label is equivalent to the HUD label, direction to place hitches/wheels/axels under the homes, and specification of a 5x5 landing with pressure-treated lumber for steps. The document also clarifies that parks will be responsible for clearing low-hanging limbs and completing dirt work/grading at Mission Tejas State Park, while contractors must include both materials and installation costs for skirting. The addendum requires acknowledgment from respondents through signature and must be included with their proposal submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Texas Parks and Wildlife Department
4200 Smith School Road
Austin, Texas 78744
ADDENDUM
Addendum Number: 01 Dated: February 18, 2025
Solicitation Number: 802-25-55975
Solicitation Title:
Installation of New Manufactured Housing Units Lake Livingston and Mission Tejas State Park
Due Date/Deadline: March 4, 2025; 2:00pm CT
Purchaser: Vanessa D Contreras CTCD, CTCM
PURPOSE OF ADDENDUM: QUESTIONS AND ANSWERS
Except as provided herein, all terms and conditions of the document referenced herein, remain unchanged and in full force and effect. The following are specifications to this solicitation. This Addendum may be attached to and form a part of the referenced solicitation document and any resulting awarded contract and may be considered in response.
CLARIFICATIONS
1. Is the red certification label, also known as the HUD label?
Answer: Yes
2. Should the hitch, wheels, and axels be removed from the property or placed under the home?
Answer: Placed under the home
3. Is there a page limit to a respondent's technical proposal?
Answer: No
4. The installation site at Mission Tejas State Park has several low hanging limbs that need to be cut down to protect the home. Will the park be responsible for clearing these or should we include in our pricing?
Answer: The park will be responsible got clearing the low hanging limbs.
5. Will the park be completing any additional dirt work and grading at the Mission Tejas State Park site to level out the house pad or should we assume that the grade and slope of the site will remain the same?
Answer: Park will be responsible for completing dirt work and grading to level out the house pad
6. Should the contractor include in pricing the costs for the skirting materials only and exclude the installation (labor)?
Answer: Vendor shall include the cost of skirting to include installation services
7. What size landing should the contractor price for the TPWD option for steps?
Answer: 5x5 landing
8. What type of building materials should the contractor price for the steps (PT lumber, composite decking, vinyl handrails, etc/)?
Answer: PT lumber
IFB 802-25-55975
Addendum 01
Respondents are to acknowledge receipt of this addendum. Return a signed copy of this notice with your proposal submission.
I acknowledge receipt of this Addendum.
Respondent’s Authorized Signature Date