ESBD_383496_1732738948595_Waller Gas Bid Sheet.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- ON-CALL SERVICES FOR UTILITY GAS LINE SERVICES
- Solicitation number
- 2025-01
- Issued by
- Van Zandt County, Texas
About this file
This is a bid sheet from the City of Waller Gas Contract detailing unit pricing for various gas utility line installation, maintenance, and repair services. The document outlines detailed specifications for service line installations, main extensions, rehabilitation work, boring operations, crew rates, and equipment pricing, with all work to be performed according to Railroad Commission (RRC) safety standards. The specifications cover polyethylene (PE) and steel (STL) gas lines ranging from 2" to 6" in diameter, including tapping, trenching, backfilling, tamping, and electrofusion work, with minimum depth requirements of 24" to 48" from top of pipe.
The bid sheet is structured as a comprehensive unit price schedule, with items measured in various units including EA (each), FT (feet), SF (square feet), and HR (hour). The pricing schedule includes categories for new installations, rehabilitation work, service line replacements, crew rates for both standard and emergency operations, professional services, and equipment rates. Notable requirements include bell holes up to 6 feet depth, directional boring capabilities, pavement breaking and repair, and traffic control measures. Emergency response capabilities are priced separately with specific callout rates for various crew configurations and equipment types.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CITY OF WALLER GAS CONTRACT | |||
| Item | Description | Unit | Cost |
| SL TO 2" TAP & 15 FT. (EXST PE MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 2" TAP & 15 FT. (EXST STL MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 2" TAP & 15 FT. (NEW PE MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 2" TAP & 15 FT. (NEW STL MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 2" > 15 FT. | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | FT | |
| SL TO 4" DIA- TAP & 15 FT. (EXST PE MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 4" DIA- TAP & 15 FT. (EXST STL MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 4" DIA- TAP & 15 FT. (NEW PE MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 4" DIA- TAP & 15 FT. (NEW STL MAIN) | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | EA | |
| SL TO 4" DIA > 15 FT. | Install to RRC standard safety requirements a minimum 24" deep from top of pipe including trenching, backfilling, tamping, electro fusion, all bell holes up to 6 ft depth. Pavement breaking and directional bores extra. Open cuts excluded from bore footage. All other construction costs are inclusive. | FT | |
| NEW RSL WITH MAIN EXT | |||
| SL TO 1 INCH UPTO 100 FT | All costs inclusive. Incl bore if necessary | EA | |
| SL TO 1 INCH OVER 100 FT | All costs inclusive. Incl bore if necessary | FT | |
| NEW MAIN EXTENSIONS NON-JT | |||
| IN. 2" PE MAIN (101-500 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 2" PE MAIN (501-1000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 2" PE MAIN (1001-2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 2" PE MAIN (OVER 2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" PE MAIN (101-500 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" PE MAIN (501-1000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" PE MAIN (1001-2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" PE MAIN (OVER 2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" PE MAIN (101-500 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" PE MAIN (501-1000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" PE MAIN (1001-2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" PE MAIN (OVER 2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 2" STL MAIN (101-500 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 2" STL MAIN (501-1000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 2" STL MAIN (1001-2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 2" STL MAIN (OVER 2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" STL MAIN (101-500 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" STL MAIN (501-1000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" STL MAIN (1001-2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 4" STL MAIN (OVER 2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" STL MAIN (101-500 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" STL MAIN (501-1000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" STL MAIN (1001-2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| IN. 6" STL MAIN (OVER 2000 FT) | Install main to RRC standards & safety requirements min 24 to 48" deep from top of pipe, incl trenching, backfilling, tamping, all things, electro fusion and one HVTT or squeeze and tie in/no bypass. Incl bell holes to 6 ft. Pavement break & dir bores extra. Open cut excl from bore footage. All other construction costs are inclusive. | FT | |
| REHAB/DIMP, SI, PI - NORMAL/REPAIR CONST | |||
| REPLACE 2" PLA - 500 -1000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 4" PLA - 500 -1000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 6" PLA - 500 -1000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 2" PLA - 1001 -5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 4" PLA - 1001 -5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 6" PLA - 1001 -5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 2" PLA - GREATER THAN 5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 4" PLA - GREATER THAN 5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 6" PLA - GREATER THAN 5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 2" STL - 500 -1000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 4" STL - 500 -1000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 6" STL - 500 -1000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 2" STL - 1001 -5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 4" STL - 1001 -5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 6" STL - 1001 -5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 2" STL - GREATER THAN 5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 4" STL - GREATER THAN 5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| REPLACE 6" STL - GREATER THAN 5000 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes all other related costs. Front/street construction only. | FT | |
| CUT & TIE SL 2" PLA TO 15 FT | Includes bell holes up to 6 ft depth. Pavement breaking extra. Includes all other construction and related costs. | EA | |
| REPL SL 2" PLA - TAP & 15 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes boring, riser removal & partial replacement. Includes boring all other construction related costs. | EA | |
| REPL SL 2" PLA > 15 FT | Includes directional bores, bell holes to 6 ft depth & bore tie ins. Pavement breaking & hot tie ins extra. Includes boring, riser removal & partial replacement. Includes boring all other construction related costs. | FT | |
| ABANDON SL TO 2" | Includes bell holes up to 6 ft depth. Pavement breaking extra. Work with projects. Includes riser removal. Includes all other construction related costs. | EA | |
| REPL SL PLA TO 1" - SHORT | Work with projects. Includes riser removal. Includes all other construction related costs. | EA | |
| REPL SL PLA TO 1" - LONG | Includes bell holes up to 6 ft depth. Pavement breaking extra. Work with projects. Easement or street crossing required. Includes riser removal and all other construction related costs. | EA | |
| REPL SL PLA TO 1" - SHORT - ST-REAR | Includes bell holes up to 6 ft depth. Pavement breaking extra. Work with projects. Main in street. Meter at rear LL or back of the house. Street crossing not required. Includes riser removal and all otrher construction related costs. | EA | |
| REPL SL PLA TO 1" - LONG - ST-REAR | Includes bell holes up to 6 ft depth. Pavement breaking extra. Work with projects. Main in street. Meter at rear LL or back of the house. Street crossing not required. Includes riser removal and all otrher construction related costs. | EA | |
| CUT & TIE SL PLA TO 1-1/4" INCL TAP | Includes bell holes up to 6 ft depth. Pavement breaking extra. Work with projects. Will be treated as long or short SL if over 15 ft. Includes all other costs. | EA | |
| ABANDON TO 4" STL - SEPARATE BELL HOLE | Includes bell hole up to 6 ft depth. Install flgs, fab and plug and compaction. Separate bell hole from any tie ins. | EA | |
| ABANDON TO 6" STL - SEPARATE BELL HOLE | Includes bell holes up to 6 ft depth. Pavement breaking extra. Install flgs, tap & plug and compaction. Separate bell hole from any tie ins. Includes all other construction related costs. | EA | |
| ABANDON PLA MAIN - SEPARATE BELL HOLE | Includes bell holes up to 6 ft depth. Includes all other construction related costs. To abandon a plastic main in separate bell from any tie ins. | EA | |
| KILL INDL SL | Includes all labor and equipment needed to kill a residential service up to 1 1/4" Dia. Includes riser removal. Individual service kills worked with projects. Does not apply to services killed with main. | EA | |
| REMOVE SVC RISER TO 1-1/4" | Includes all labor and equipment to remove riser when service not replaced and killed with abandoned main. Worked with projects. Includes paperwork to remove frtom mapping. | EA | |
| COMMON WORK | |||
| BELL HOLE IN DIRT TO 6 FT DEPTH | Includes shoring/equip, mech compaction. Includes all other construction related costs. Applies when additional bell hole needed for service kills and other main line work, New installs may require an inspection. | EA | |
| BELL HOLE IN STREET/ROADWAY TO 6 FT DEPTH | Includes shoring/equip, mech compaction. Includes all other construction related costs. Applies when additional bell hole needed for service kills and other main line work, New installs may require an inspection. | EA | |
| BELL HOLE IN DIRT 6-9 FT DEPTH | Includes shoring/equip, mech compaction. Includes all other construction related costs. Applies when additional bell hole needed for service kills and other main line work, New installs may require an inspection. | EA | |
| BELL HOLE IN STREET/ROADWAY 6-9 FT DEPTH | Includes shoring/equip, mech compaction. Includes all other construction related costs. Applies when additional bell hole needed for service kills and other main line work, New installs may require an inspection. | EA | |
| ARROW BOARD | For major streets, lane closures as needed. | EA | |
| RM 12" EXTRA CVR. TO 4" PIPE (MACH) | Additional charge per foot for installing main deeper than 48 inch if spec req. Does not apply to bore depth. | FT | |
| RM 12" EXTRA CVR. TO 6"-12" PIPE (MACH) | Additional charge per foot for installing main deeper than 48 inch if spec req. Does not apply to bore depth. | FT | |
| RM 12" EXTRA CVR. TO 4" PIPE (HAND) | Additional charge per foot for installing main deeper than 48 inch if spec req. Does not apply to bore depth. | FT | |
| RM 12" EXTRA CVR. TO 6"-12" PIPE (HAND) | Additional charge per foot for installing main deeper than 48 inch if spec req. Does not apply to bore depth. | FT | |
| PVMT BREAKING 4" | Breaking 4" pavement on standard street, parking lot or sidewalk by any construction method. | FT | |
| PVMT BREAKING 6" | Breaking 6" pavement on standard street, parking lot or sidewalk by any construction method. | FT | |
| PVMT BREAKING 8" AND UP | Breaking 8" pavement on standard street, parking lot or sidewalk by any construction method inc hydro hammer if nec. | FT | |
| SAW CUT MIN DAILY RATE | Min daily rate for concrete saw | EA | |
| SAW CUT PER LF | Per linear foot per inch of thickness | FT | |
| PAVEMENT REAPIR | Permant repairs. Per square foot inc all material, labor and sawcut as needed. This inc driveways, sidewalks and similar surfaces. | SF | |
| BORING 2" DIA TO 12 FT | City should be notified when boring more then 5 ft. Bore logs and mapping required. Includes clean up, disposal of drilling fluids with same day bore and all related costs. | FT | |
| BORING 4" DIA TO 12 FT | City should be notified when boring more then 5 ft. Bore logs and mapping required. Includes clean up, disposal of drilling fluids with same day bore and all related costs. | FT | |
| BORING 6" DIA TO 12 FT | City should be notified when boring more then 5 ft. Bore logs and mapping required. Includes clean up, disposal of drilling fluids with same day bore and all related costs. | FT | |
| BORING 8" DIA TO 12 FT | City should be notified when boring more then 5 ft. Bore logs and mapping required. Includes clean up, disposal of drilling fluids with same day bore and all related costs. | FT | |
| BORING 10" DIA TO 12 FT | City should be notified when boring more then 5 ft. Bore logs and mapping required. Includes clean up, disposal of drilling fluids with same day bore and all related costs. | FT | |
| BORING 12" DIA TO 12 FT | City should be notified when boring more then 5 ft. Bore logs and mapping required. Includes clean up, disposal of drilling fluids with same day bore and all related costs. | FT | |
| BORING ADDER 2" DIA > 12 FT | This is an adder to the bore costs for the length of bore that is over 12 ft deep. | FT | |
| BORING ADDER 4" DIA > 12 FT | This is an adder to the bore costs for the length of bore that is over 12 ft deep. | FT | |
| BORING ADDER 6" DIA > 12 FT | This is an adder to the bore costs for the length of bore that is over 12 ft deep. | FT | |
| BORING ADDER 8" DIA > 12 FT | This is an adder to the bore costs for the length of bore that is over 12 ft deep. | FT | |
| BORING ADDER 10" DIA > 12 FT | This is an adder to the bore costs for the length of bore that is over 12 ft deep. | FT | |
| BORING ADDER 12" DIA > 12 FT | This is an adder to the bore costs for the length of bore that is over 12 ft deep. | FT | |
| CONSTRUCT STL CASING - 2" DIA & LESS | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| CONSTRUCT STL CASING - 4" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| CONSTRUCT STL CASING - 6" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| CONSTRUCT STL CASING - 8" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| CONSTRUCT STL CASING - 10" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| CONSTRUCT STL CASING - 12" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| INSTALL PLA CASING - 2" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| INSTALL PLA CASING - 4" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| INSTALL PLA CASING - 6" DIA | Construct casing, inc inserting carrier pipe. Directional bore extra. Includes all construction related costs. | FT | |
| ASPHALT PATCH - TEMP | Temporary patch in asphalt/conc pavements to open an area for normal use pending perm repairs. | SF | |
| TIE ANY SIZE PIPE TO PLA - NO BP | Includes up to 15 ft of pipe. Bell holes to 6 ft, shoring and compaction. Pavement breaking extra. HVTT or squaeeze and tie in. Includes all other const related costs. | EA | |
| TIE ANY SIZE PIPE TO 2" PLA W/BP | Includes up to 15 ft of pipe. Bell holes to 6 ft, shoring, temp bypess and compaction. Pavement breaking extra. Includes all other const related costs. | EA | |
| TIE ANY SIZE PIPE TO 4" PLA | Includes up to 15 ft of pipe. Bell holes to 6 ft, shoring, temp bypess and compaction. Pavement breaking extra. Includes all other const related costs. | EA | |
| TIE ANY SIZE PIPE TO 6" PLA | Includes up to 15 ft of pipe. Bell holes to 6 ft, shoring, temp bypess and compaction. Pavement breaking extra. Includes all other const related costs. | EA | |
| TIE ANY SIZE PIPE TO 8" PLA | Includes up to 15 ft of pipe. Bell holes to 6 ft, shoring, temp bypess and compaction. Pavement breaking extra. Includes all other const related costs. | EA | |
| 2 IN HOT TAP - TIE TO ANY SIZE STEEL | Hot tap tie in/No BP includes up to 15 ft of pipe. And bell hole to 6 ft, shoring and compaction. Includes all other const related costs. Pavement breaking extra. | EA | |
| 4 IN HOT TAP - TIE TO ANY SIZE STEEL | Hot tap tie in/No BP includes up to 15 ft of pipe. And bell hole to 6 ft, shoring and compaction. Includes all other const related costs. Pavement breaking extra. | EA | |
| 6 IN HOT TAP - TIE TO ANY SIZE STEEL | Hot tap tie in/No BP includes up to 15 ft of pipe. And bell hole to 6 ft, shoring and compaction. Includes all other const related costs. Pavement breaking extra. | EA | |
| REPLACE SERVICE RISER TO 1 IN | Replace service line riser. All costs inclusive. | EA | |
| TEMP BY PASS STL TO 2" SIZE | Includes fittings, tapping, plugging and all const related costs. | EA | |
| SERVICE KILLS | |||
| KILL INDL SL TO 1-1/4 | Includes bell hole to 6 ft. Pavement breaking extra. Does not inc main fittings. Inc all other relatedd costs to kill service up to 1 1/4" Dia. Complete kill in 10 work days or less | EA | |
| KILL INDL SL 2" | Includes bell hole to 6 ft. Pavement breaking extra. Does not inc main fittings. Inc all other relatedd costs to kill service up to 2" Dia. Complete kill in 10 work days or less | EA | |
| RE-ROUTE | |||
| RR-SAME HOLE | Const comp within 7-10 days. Partial or complete replace. Inc all const related costs.Pavement breaking extra. Will req notification if res/business is w/o utility for any length of time. | EA | |
| RR-SEPARATE HOLE | Const comp within 7-10 days. Partial or complete replace. Inc all const related costs.Pavement breaking extra. Will req notification if res/business is w/o utility for any length of time. | EA | |
| SRVICES 1 INCH - INDL REPLACEMENTS | |||
| REPL SL TO 1" - SHORT (EX PE MAIN) | Crew and equip rate for main & service work. Inc plastic only leak repairs, directional boring, electro fusion & electric welder extra. | EA | |
| REPL SL TO 1" - LONG (EX PE MAIN) | Crew and equip rate for main & service work. Inc plastic only leak repairs, directional boring, electro fusion & electric welder extra. | EA | |
| REPL SL TO 1" - SHORT (EX STL MAIN) | Crew and equip rate for main & service work. Inc plastic only leak repairs, directional boring, electro fusion & electric welder extra. | EA | |
| REPL SL TO 1" - LONG (EX STL MAIN) | Crew and equip rate for main & service work. Inc plastic only leak repairs, directional boring, electro fusion & electric welder extra. | EA | |
| SERVICES 2 INCH - INDL REPLACEMNTS | |||
| REPL SL 2" PLA - TAP & 15 FT | Includes boring, riser removal, temp bypass, partial replacements. Pavement breaking extra. Includes all other related costs. | EA | |
| REPL SL 2" PLA - ADDL FT > 15 FT | Includes boring, riser removal and all other related costs. Inc partial SL replacements and temp bypass if needed. | FT | |
| CREW RATES | |||
| 3 MAN CONSTRUCTION CREW AND EQUIPMENT | HR | ||
| 3 MAN CONST CREW AND EQUIP - EMER CALLOUT | HR | ||
| 4 MAN CONSTRUCTION CREW AND EQUIPMENT | HR | ||
| 4 MAN CONST CREW AND EQUIP - EMER CALLOUT | HR | ||
| 3 MAN LEAK CREW - INCL WELDER | HR | ||
| 3 MAN LEAK CREW - INCL WELDER / EMER CALLOUT | HR | ||
| 3 MAN LEAK CREW - ROAMING WELDER | HR | ||
| 4 MAN LEAK CREW - INCL WELDER | HR | ||
| 4 MAN LEAK CREW - INCL WELDER / EMER CALLOUT | HR | ||
| 4 MAN LEAK CREW - ROAMING WELDER | HR | ||
| 5 MAN ML CREW AND EQUIPMENT | HR | ||
| 5 MAN ML CREW AND EQUIP - EMER CALLOUT | HR | ||
| 2 MAN MAINT CREW AND EQUIP | HR | ||
| 2 MAN MAINT CREW AND EQUIP - EMER CALLOUT | HR | ||
| PER MAN RATE | HR | ||
| WEEKEND HOURLY RATE | HR |
| PROFESSIONAL SERVICES | ||
| Owner or deligated responsible party | This is time worked by the contractor aiding with city projects where indepth knowledge of is required. | HR |
| HOURLY LABOR AND EQUIPMENT | ||
| FOREMAN | HR | |
| FOREMAN - EMER CALLOUT | HR | |
| TRUCK DRIVER | HR | |
| TRUCK DRIVER - EMER CLLOUT | HR | |
| WELDER | HR | |
| WELDER - EMER CALL OUT | HR | |
| OPERATOR | HR | |
| OPERATOR - EMER CALLOUT | HR | |
| LEAD LABORER | HR | |
| LEAD LABORER - EMER CALLOUT | HR | |
| LABORER | HR | |
| LABORER - EMER CALLOUT | HR | |
| MOBILE WELDING MACHINE | HR | |
| ELECTROFUSION OPERATOR | HR | |
| TRAFFIC CONTROL CRASH TRUCK | HR | |
| 1/2 TON PICK UP | HR | |
| 1 TON CREW CAB TRUCK | HR | |
| CREW TRUCK W/ TORCH, AIR COMP, MISC TOOLS | HR | |
| 2 TON MATERIAL TRUCK | HR | |
| 2 - 5 TON MATERIAL TRUCK | HR | |
| SMALL DUMP TRUCK | HR | |
| MED DUMP TRUCK 6-9 YDS | HR | |
| LG DUMP TRUCK 9> YDS | HR | |
| SMALL VAC TRUCK | HR | |
| LARGE VAC TRUCK | HR | |
| 3" > PUMP W/ HOSES | HR | |
| TRACTOR W/LOWBOY / PINDLE HITCH TRAILER | HR | |
| TRAILER | HR | |
| BACKHOE | HR | |
| TRACKHOE | HR | |
| BOBCAT/SKID STEER | HR | |
| ELECTROFUSION TRUCK W/ TOOLS | HR | |
| BACKHOE W/ JACK HAMMER ATTACH | HR | |
| LIGHTING/GENERATOR | HR | |
| HAUL TRUCK/TRAILER | HR | |
| REMOVE/REPLACE LAWN REPAIR | EA | |
| MATERIAL HAUL OFF AND REMOVAL - INCL DISPOSAL | EA |
File details come from the government source that posted it. Updated .