ESBD_379728_1729097391621_Attachment A-1 (Price Sheet).xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 24-188
- Issued by
- Fort Bend County, Texas
About this file
This document is a Price Sheet for a Competitive Sealed Proposal (CSP) issued by the City of Missouri City, Texas for Contract 24-188. The Price Sheet includes approximately 38 line items for various construction and landscaping services required for a golf course project, with estimated quantities and spaces for bidders to input unit prices. The scope includes mobilization, site preparation, drainage, earthwork, irrigation, landscaping, and paving. The project is to be completed within a specified number of calendar days. The City reserves the right to award the contract based on either the Total Base Bid or the Total Base Bid including Alternate Bid Items.
The Price Sheet requires the bidder's company name, authorized individual's name, and signature. Pricing is requested for both base bid and alternate bid items. The total base bid price, as well as the total base bid price including alternates, must be provided. This contract opportunity is being issued by the City of Missouri City, Texas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Attachment A-1 Price Sheet
CSP 24-188
| Instructions: The Price Sheet is formatted so that you can only insert the unit prices in the shaded cells, and provide the requested information in the spaces provided on the last page. Once completed, it must be signed by an authorized representative of your company, printed, and provided with the other documents specified in the Submittals Section of CSP 24-188. For verification, the completed Price Sheet must be submitted on a flash drive as a separate excel file as required in the Submittals Section of CSP 24-188. | ||||||
| Item | Item Description | Est. Qty. | Unit | Unit Price | Extension Price | |
| Base Bid Items | ||||||
| 1 | Mobilization & Staking (Lump Sum) | |||||
| (not to exceed 3% of contract price) | 1 | LS | $ - 0 | |||
| 2 | Performance & Payment Bond | 1 | LS | $ - 0 | ||
| 3 | Solid Clearing (Machine) | 4.53 | AC | $ - 0 | ||
| 4 | Existing Turf Removal | 92.73 | AC | $ - 0 | ||
| 5 | Earthmoving /Rough Grading | 137,700 | CY | $ - 0 | ||
| 6 | 12" Catchbasins | 170 | EA | $ - 0 | ||
| 7 | 18" Catchbasins | 44 | EA | $ - 0 | ||
| 8 | 24" Catchbasins | 32 | EA | $ - 0 | ||
| 9 | Lake Overflow Structure (Type E inlet) | 11 | EA | $ - 0 | ||
| 10 | Precast Manhole Type "C" precast shallow depth manhole for 42-inch diameter and smaller sewers | |||||
| (with or without grate top) | 1 | EA | $ - 0 | |||
| 11 | Brick Plug (All Sizes) | 2 | EA | $ - 0 | ||
| 12 | 6" C.P.P. | 14,383 | LF | $ - 0 | ||
| 13 | 8" C.P.P. | 3,549 | LF | $ - 0 | ||
| 14 | 12" C.P.P. | 3,539 | LF | $ - 0 | ||
| 15 | 18" C.P.P. | 296 | LF | $ - 0 | ||
| 16 | 24" C.P.P. | 795 | LF | $ - 0 | ||
| 17 | Root Zone Mix | 4,074 | CY | $ - 0 | ||
| 18 | Greens Gravel | 1,358 | CY | $ - 0 | ||
| 19 | Bunker Gravel | 382 | CY | $ - 0 | ||
| 20 | Trap Sand | 493 | 1 | $ - 0 | ||
| 21 | 4" Perf. Pipe (Rigid) | 15,000 | LF | $ - 0 |
| Subtotals of Items 1 thru 21: | $ - 0 | |
| CSP 24-188 |
| Item | Item Description | Est. Qty. | Unit | Unit Price | Extension Price |
| Base Bid Items | |||||
| 22 | 4" Solid Pipe (Rigid) | 6,856 | LF | $ - 0 | |
| 23 | Better Billy Bunker | 40,000 | SF | $ - 0 | |
| 24 | Tee Mix (4" Depth) | 778 | CY | $ - 0 | |
| 25 | Feature Shaping | 18 | HOLE | $ - 0 | |
| 26 | Planting Greens | 110,000 | SF | $ - 0 | |
| 27 | Planting Tees | 126,000 | SF | $ - 0 | |
| 28 | Planting Fairways & Roughs | 80.43 | AC | $ - 0 | |
| 29 | Sodding | 50,000 | SY | $ - 0 | |
| 30 | SWPPP (NOI, NOT Permit Application & Fees) | 1 | LS | $ - 0 | |
| 31 | Reinforced Silt Fence | 5,267 | LF | $ - 0 | |
| 32 | Stabilized Construction Access | 12 | EA | $ - 0 | |
| 33 | Concrete Wash Out | 10 | EA | $ - 0 | |
| 34 | Cart Paths (6' wide, 4" thick) | 73,527 | SF | $ - 0 | |
| 35 | Cart Path Demolition | 72,708 | SF | $ - 0 | |
| 36 | Irrigation | 1 | LS | $ - 0 | |
| 37 | Performance & Payment Bond | 1 | LS | $ - 0 | |
| 38 | City of Missouri City Project Sign Complete and in Place, Coordinate with City for Location | 2 | EA | $ - 0 | |
| $ - 0 | |||||
| Total Base Bid Price: | $ - 0 |
| Alternate Bid Items | |||||
| 20A | Trap Sand (Premier Play)(Replaces Item 20) | 493 | CY | $ - 0 | |
| 34A | Cart Paths (7' wide, 4" thick) (Replaces Item 34) | 116,453 | SF | $ - 0 | |
| 35A | Cart Path Demolition (on-site disposal) | ||||
| (Replaces Item 35) | 89,358 | LS | $ - 0 | ||
| Total Base Bid Plus Alternate Bid Items: | $ - 0 |
Missouri City, Texas reserves the right to award a contract based on either Total Base Bid or Total Base Bid including Alternate Bid Items.
Company Name: ____________________________
Name of Authorized Individual: ____________________________
Signature of Authorized Individual: ____________________________
Number of Calendar Days to Complete Project: ____________________________
CSP 24-188
File details come from the government source that posted it. Updated .