This document is a Scope of Work (SOW) for a concrete construction project at a new warehouse location in Brownwood, Texas. The SOW outlines the required work, which includes demolishing existing curb and topsoil, grading the area, providing reinforcing steel, and pouring approximately 3,600 square feet of 4,000 psi concrete. The related State and Local Contract Opportunity is for FY25 and involves the same demo and concrete pour project.
The SOW specifies the required concrete strength, reinforcing steel grade, and positioning/supporting devices. It does not provide any details on pricing terms, set asides, incumbents, funding requirements, or other commercial information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_368985_1721425644458_bwd concrete sow.docx | DOCX document | |
| ESBD_368985_1721425673749_bwd warehouse floor plan.jpg | JPG image | |
| ESBD_368985_1721425611886_bwd concrete ifb.doc | DOC document | |
| ESBD_368985_1721425699720_bwd warehouse photo.jpg | JPG image | |
| ESBD_368985_1721425699720_bwd warehouse photo.jpg | JPG image | |
| ESBD_368985_1721425673749_bwd warehouse floor plan.jpg | JPG image | |
| ESBD_368985_1721425611886_bwd concrete ifb.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brownwood concrete for New warehouse location
SOW
1. Demo curb ribbon and top soil from areas needed to allow for new concrete
2. Grade areas down to allow 6 inches of compacted base and 6 inches finished concrete to ground and asphalt level.
3. Reinforcing Steel. Provide Grade 60 or above, deformed steel for bar reinforcement in accordance with Item 440, “Reinforcement for Concrete.” Provide positioning and supporting devices (baskets and chairs) capable of securing and holding the reinforcing steel in proper position.
4. Pour approximately 3,600 square feet of 4,000psi concrete 5.