This document is an addendum to a solicitation issued by the Texas Parks and Wildlife Department (TPWD) Infrastructure Division for the Headquarters (HQ) HVAC Renovation at Mother Neff State Park, Solicitation Number MR11493R. The addendum provides clarifications and answers to questions related to the project, including providing specifications, HVAC control requirements, use of existing components, access and safety requirements, and work schedule. The solicitation has a due date of August 6, 2024 at 2:00 PM and a pre-bid conference was held on July 22, 2024.
The addendum does not specify pricing terms, set-asides, incumbents, funding requirements, or other financial details. It focuses on technical and logistical aspects of the project, such as the use of standalone thermostats instead of a building-wide DDC system, the ability to abandon refrigerant lines in walls, and the requirement for a dedicated superintendent. The addendum also clarifies insurance and testing requirements for subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_367823_1720799173425_MR11493R_NTB.pdf | ||
| ESBD_367823_1720799173425_MR11493R_NTB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Texas Parks and Wildlife Department Infrastructure Division
4200 Smith School Road Austin, Texas 78744
ADDENDUM
Addendum Number: 01 Dated: 07/30/2024
Solicitation Number: MR11493R
Solicitation Title: Headquarters (HQ) HVAC Renovation at Mother Neff State Park
Due Date/Deadline: 08/06/2024 at 2:00 PM
Contract Manager: Misty K. Wyatt, CTCD, CTCM
PURPOSE OF ADDENDUM:
Except as provided herein, all terms and conditions of the document referenced herein, remain unchanged and in full force and effect. The following are official revisions, specifications and/or clarifications to this solicitation.
This Addendum shall be attached to and form a part of the referenced solicitation document and any resulting awarded contract and must be considered in your response.
Respondents are advised to check for updates, addenda issuance, and proposal opening date changes through the Comptroller’s website under Electronic State Business Daily (ESBD) at http://www.txsmartbuy.com/sp
QUESTIONS AND ANSWERS
Q1: Please provide project manual or project specifications.
A1: No technical specifications are provided for this project. Refer to notes and schedules on drawings.
Q2: No schedule is given for preventative maintenance. How often does TPWD want preventative maintenance?
A2: Preventive maintenance is not part of the contract for this project.
Q3: The initial project plans call for Carrier equipment. Will TPWD accept other manufacturers, specifically Daikin? (The existing units on site are Daikin.)
A3: Substitutions are not allowed during the bidding phase. Please reference Uniform General Conditions Article
8.3.5 and 8.3.6 for substitution requirements. For this project, Daikin is not a preferred manufacturer and will not be accepted as a substitution.
Q4: Plans do not seem to specify HVAC control type. Does TPWD want Direct Digital Controls with an Energy Management System?
A4: The new units are to be provided with standalone thermostats; no building-wide DDC system is intended.
Q5: Does TPWD have a preferred vendor for controls?
A5: The new units are to be provided with standalone thermostats; no building-wide DDC system is intended.
Q6: Can existing condensate drains be reused?
A6: Yes, refer to note 7 on sheet M1.0.
Q7: Project Drawings call for demoing ceilings and patching for the purpose of removing refrigerant lines in select locations. Refrigerant lines also seem to run down inside exterior walls to outside units. Should the contractor demo wallboard, lines in walls, and perform associated repairs?
A7: Lines that are not to be reused may be abandoned in place within exterior walls. Walls are to be sealed and patched at pipe penetrations where lines are abandoned in place.
http://www.txsmartbuy.com/sp
Addendum No. 01 Project Number: MR11493R Page 2 of 2
Addendum OF 113 (5/5/2022)
Q8: Scuttle holes in ceilings do not seem to be of sufficient size to remove equipment in attic. Should the contractor include enlargement of access holes and associated repairs to finishes in their bid?
A8: This is to be done at the contractor's discretion, to perform the work.
Q9: Should the contractor include the cost of a portable restroom in their bid?
A9: Yes, contractor to provide portable restroom in their bid.
Q10: Is a dedicated Superintendent required?
A10: Yes. Please reference the 2015 Uniform General Conditions, Article 3.3.2.
Q11: Is a dedicated Quality Control Manager required?
A11: No. Please reference the 2015 Uniform General Conditions Article 8 Quality Control and related requirements.
Q12: Is a dedicated Site Safety and Health Officer required?
A12: No. Please reference the 2015 Uniform General Conditions Article 7 for Construction Safety and related requirements.
Q13: Sheet E1.0, Keyed note 2: Indoor unit is circuited through associated condensing unit, provide conduit and wiring from CU to FCU. Southwire makes a flexible metal clad conduit with 4 #14-gauge conductors designed to run with mini split line sets from the outside to inside unit. Is this acceptable?
A13: Not acceptable. Provide per plans.
Q14: Can all work be performed during regular business hours?
A14: Work will be performed Monday - Friday 8am - 5pm.
Q15: Do the sub-contractors need $1 Million in WC and $2 Million aggregate GL in insurance or just the GC?
A15: Please reference the 2015 Uniform General Conditions, Article 5 - Bonds and Insurance, section 5.2 - Insurance Requirements, Subsection 5.2.4.
Q16: Do the sub-contractors need Builders risk, windstorm coverage and flood prone area protection or the GC as stated on page 130 of the IFB.pdf?
A16: Please reference the 2015 Uniform General Conditions, Article 5 - Bonds and Insurance, section 5.2 - Insurance Requirements, Subsection 5.2.4.
Q17: Will the HQ be open for business during the project?
A17: Yes, please refer to Division 1 - General Requirements, Section 01000 - Special Conditions, Part 2 - Execution, Section 2.02 - Site Operations.
Q18: If the location will be open for business does the contractor need to provide temporary HVAC?
A18: There is an Owners Allowance available for temporary cooling if needed. Please see Bid Scope Page in the Bid Package Details in e-Builder's eBidding Portal for more information.
Q19: Will TPWD require any testing of concrete, such as batch/mix testing slumps, cylinder breaks, etc. by a 3rd party testing lab?
A19: No concrete testing will be required for this project.
Respondents are to acknowledge receipt of this Addendum via the Bid Portal.