This document contains construction plans for the Coastal Bend Bays & Estuaries Program, Inc. (CBBEP) Mission River Delta Circulation Enhancement project located in Refugio County, Texas. The work consists of removing three existing concrete pipe crossings and damaged structures, and installing three new crossings at the same location - a single 14" rise x 23" span elliptical pipe, three 18" RCP pipes, and a double 6' span x 2' rise box culverts. The project also includes minor excavation, bulk rock for soil stabilization and erosion protection, and Type A, Grade 1-2 base material for trail surface. Bids will be received until 2:00 pm on Thursday, August 15, 2024, and a pre-bid meeting is scheduled for 10:00 am on Thursday, August 1, 2024 at the project site. All work shall be completed in accordance with the construction plans, specifications, and contract documents.
The contract documents do not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient commercial information. Contractors are responsible for reviewing the scope of work, plans, and specifications to generate their final quantities and contract pricing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION PLANS FOR
COASTAL BEND BAYS & ESTUARIES PROGRAM, INC.
(CBBEP)
MISSION RIVER DELTA CIRCULATION
ENHANCEMENT
01JULY 2024
DRILL, OR BLAST.
BEFORE YOU DIG,
AT 1-800-669-8344
THE LONE STAR NOTIFICATION COMPANY
811Know what'sbelow.
Call before you dig.
CALL BEFORE YOU DIG!
STOP AND CALL
48 HOURS NOTICE
PARTICIPANTS REQUEST
TEXAS ENGINEERING FIRM F-1386
LJA ENGINEERING
5350 S. Staples Street, Suite 425 www.LJA.com
Corpus Christi, Texas 78411 phone.361.991.8550
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
MISSION RIVER
PROJECT LOCATION
QUANTITIES SHOWN REFLECT MEASUREMENTS TAKEN
FROM THE DRAWINGS AND ARE ESTIMATED FOR
BIDDING PURPOSES. CONTRACTOR IS RESPONSIBLE FOR
REVIEWING SCOPE OF WORK, THE PLANS AND SPECS
AND FOR GENERATING THEIR FINAL QUANTITIES, TO
INCLUDE ALL MATERIALS, LABOR, SERVICES, AND
INCIDENTALS FOR CONTRACT PRICE.
1+00
PROJECT LOCATION
CROSSING No. 3
PROJECT LOCATION
CROSSING No. 2
PROJECT LOCATION
CROSSING No. 1
CAUTION!!!
CAUTION!!!
STAGING AREA
LOCATION (UPLAND)
CBBEP, INC. WILL PROVIDE MAP OF A
SUITABLE PLACEMENT AREA.
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
-4
-3
-2
-1
-4
-3
-2
-1
0' 10'RT 20'RT 30'RT0'10'LT20'LT30'LT
CROSSING 1 A CROSSING 1 A
-4
-3
-2
-1
-4
-3
-2
-1
0' 10'RT 20'RT 30'RT0'10'LT20'LT30'LT
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
CROSSIN
G 2
B
C R
O
SS
IN
G
B
CROSSING 2 A CROSSING 2 A
-4
-3
-2
-1
-4
-3
-2
-1
0' 10'RT 20'RT 30'RT0'10'LT20'LT30'LT
-4
-3
-2
-1
-4
-3
-2
-1
0' 10'RT 20'RT 30'RT0'10'LT20'LT30'LT
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
C R
O
SS
IN
G
B
C R
O
SS
IN
G
B
CROSSING 3 A CROSSING 3 A
-4
-3
-2
-1
-4
-3
-2
-1
0' 10'RT 20'RT 30'RT0'10'LT20'LT30'LT
-4
-3
-2
-1
-4
-3
-2
-1
0' 10'RT 20'RT 30'RT0'10'LT20'LT30'LT
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
Design Division Standard
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
STAGING AREA
LOCATION (UPLAND)
CBBEP, INC. WILL PROVIDE MAP OF A
SUITABLE PLACEMENT AREA.
YESENIA SINGLETON
102398
LJ
A
E N
G
IN
EE
R
IN
G
TB
PE
F
IR
M R
EG
N O
. F -1
| Sheets and Views |
| 01 TITLE SHEET |
| 02 OVERALL LAYOUT,GENERAL NOTES, LEGEND, ABBREVIATIONS & SCHEDULE |
| 03 CROSSING No. 1 PLAN & SECTIONS |
| 04 CROSSING No. 2 PLAN & SECTIONS |
| 05 CROSSING No. 3 PLAN & SECTIONS |
| 06 CONSTRUCTION DETAILS (1 OF 2) |
| 07 CONSTRUCTION DETAILS (2 OF 2) |
| 08 ENVIRONMENTAL PERMITS ISSUES AND COMMITMENTS-EPIC |
| 09 STORMWATER POLLUTION PREVENTION NOTES |
| 10 STORMWATER POLLUTION PREVENTION PLAN & DETAILS |