ESBD_361754_1717708205436_Bid No. 24-28 Project Manual FY 2021 -2022 Sanitary Sewer Replacements_Part4.pdf

PDF 2 MB Posted

Attached to
NO. 24-28 FY2021-2022 Sanitary Sewer Line Replacements, Project No. 22-10-04
Solicitation number
NO24-28
Issued by
Walker County, Humble City, Texas

About this file

This document is a Notice to Bidders for the FY 2021-2022 Sanitary Sewer Line Replacements, Project No. 22-10-04, Bid No. 24-28 issued by the City of Huntsville, Texas. The project includes sanitary sewer line replacements and other associated improvements. Sealed bids are due by 2:00 p.m. Central Time on Tuesday, July 9, 2024, at which time they will be publicly opened and read. A non-mandatory pre-bid conference will be held on June 18, 2024 at 10:00 a.m. Central Time. The project duration is 180 calendar days from the Notice to Proceed.

The estimated cost of the project is in the $1,769,292 range. The contract documents may be obtained digitally from the City of Huntsville website, the Electronic State Business Daily, CivCastUSA, or PublicPurchase websites. The City reserves the right to reject any or all bids. No other pricing details, set asides, or funding information is provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2021 STANDARD SPECIFICATION CONCRETE FOR UTILITY CONSTRUCTION

03315-9

3. Cross-sectional dimensions, unexpanded waterstop: 1 inch by 3/4 inch

4. Provide with adhesive backing capable of producing excellent adhesion to concrete surfaces.

C. Adhesive Waterstop:

1. Preformed plastic adhesive waterstop at least 2 inches in diameter.

2. Meets or exceeds requirements of Federal Specification SS-S-210A.

3. Supplied wrapped completely by 2 part protective paper.

4. Submit independent laboratory tests verifying that material seals joints in concrete against leakage when subjected to minimum of 30 psi water pressure for at least 72 hours.

5. Provide primer, to be used on hardened concrete surfaces, from same manufacturer who supplies waterstop material.

6. Acceptable Manufacturer: Synko-Flex Preformed Plastic Adhesive Waterstop, Synko- Flex Products, Inc.; or approved equal.

PART 3 EXECUTION

3.01 FORMS AND SHORING

A. Provide mortar-tight forms sufficient in strength to prevent bulging between supports. Set and maintain forms to lines designated such that finished dimensions of structures are within tolerances specified in ACI 117. Construct forms to permit removal without damage to concrete. Forms may be given slight draft to permit ease of removal. Provide adequate clean out openings. Before placing concrete, remove extraneous matter from within forms.

B. Install rigid shoring having no excessive settlement or deformation. Use sound timber in shoring centering. Shim to adjust and tighten shoring with hardwood timber wedges.

C. Design Loads for Horizontal Surfaces of Forms and Shoring: Minimum fluid pressure, 175 pounds per cubic foot; live load, 50 pounds per square foot. Maximum unit stresses: 125 percent of allowable stresses used for form materials and for design of support structures.

D. Back form work with sufficient number of studs and wales to prevent deflection.

E. Re-oil or lacquer liner on job before using. Facing may be constructed of 3/4 inch plywood made with waterproof adhesive backed by adequate studs and wales. In such cases, form

03315-10 lining will not be required.

F. Unless otherwise indicated, form outside corners and edges with triangular 3/4 inch chamfer strips (measured on sides).

G. Remove metal form ties to depth of at least 3/4 inch from surface of concrete. Do not burn off ties. Do not use pipe spreaders. Remove spreaders which are separate from forms as concrete is being placed.

H. Treat facing of forms with approved form coating before concrete is placed. When directed by Project Manager, treat both sides of face forms with coating. Apply coating before reinforcement is placed. Immediately before concrete is placed, wet surface of forms which will come in contact with concrete.

3.02 PLACING REINFORCEMENT

A. Place reinforcing steel accurately in accordance with approved Drawings. Secure steel adequately in position in forms to prevent misalignment. Maintain reinforcing steel in place using approved concrete and hot-dip galvanized metal chairs and spacers. Place reinforcing steel in accordance with CRSI Publication "Placing Reinforcing Bars." Request inspection of reinforcing steel by Project Manager and obtain acceptance before concrete is placed.

B. Minimum spacing center-to-center of parallel bars: 2 1/2 times nominal bar diameter.

Minimum cover measured from surface of concrete to face of reinforcing bar unless shown otherwise on Drawings: 3 inches for surfaces cast against soil or subgrade, 2 inches for other surfaces.

C. Detail bars in accordance with ACI 315. Fabricate reinforcing steel in accordance with CRSI Publication MSP-1, "Manual of Standard Practice." Bend reinforcing steel to required shape while steel is cold. Excessive irregularities in bending will be cause for rejection.

D. Do not splice bars without written approval of Project Manager. Approved bar bending schedules or placing drawings constitute written approval. Splice and development length of bars shall conform to ACI 318, Chapters 7 and 12, and as shown on Drawings. Stagger splices or locate at points of low tensile stress.

3.03 EMBEDDED ITEMS

A. Install conduit and piping as shown on Drawings. Accurately locate and securely fasten conduit, piping, and other embedded items in forms.

B. Install waterstops as specified in other sections and according to manufacturer's instructions.

Securely position waterstops at joints as indicated on Drawings. Protect waterstops from damage or displacement during concrete placing operations.

03315-11

3.04 BATCHING, MIXING AND DELIVERY OF CONCRETE

A. Measure, batch, mix, and deliver ready-mixed concrete in accordance with ASTM C 94, Sections 8 through 11. Produce ready-mixed concrete using automatic batching system as described in NRMCA Concrete Plant Standards, Part 2 - Plant Control Systems.

B. Measure, mix and deliver concrete produced by volumetric batching and continuous mixing in accordance with ASTM C 685, Sections 6 though 8.

C. Maintain concrete workability without segregation of material and excessive bleeding.

Obtain approval of Project Manager before adjustment and change of mix proportions.

D. Ready-mixed concrete delivered to site shall be accompanied by batch tickets providing information required by ASTM C 94, Section 16. Concrete produced by continuous mixing shall be accompanied by batch tickets providing information required by ASTM C 685, Section 14.

E. When adverse weather conditions affect quality of concrete, postpone concrete placement.

Do not mix concrete when air temperature is at or below 40 degrees F and falling. Concrete may be mixed when temperature is 35 degrees F and rising. Take temperature readings in shade, away from artificial heat. Protect concrete from temperatures below 32 degrees F until concrete has cured for minimum of 3 days at 70 degrees F or 5 days at 50 degrees F.

F. Clean, maintain and operate equipment so that it thoroughly mixes material as required.

G. Hand-mix only when approved by Project Manager.

3.05 PLACING CONCRETE

A. Give sufficient advance notice to Project Manager (at least 24 hours prior to commencement of operations) to permit inspection of forms, reinforcing steel, embedded items and other preparations for placing concrete. Place no concrete prior to Project Manager's approval.

B. Schedule concrete placing to permit completion of finishing operations in daylight hours.

However, when necessary to continue after daylight hours, light site as required. When rainfall occurs after placing operations are started, provide covering to protect work.

C. Use troughs, pipes and chutes lined with approved metal or synthetic material in placing concrete so that concrete ingredients are not separated. Keep chutes, troughs and pipes clean and free from coatings of hardened concrete. Allow no aluminum material to be in contact with concrete.

D. Limit free fall of concrete to 4 feet. Do not deposit large quantities of concrete at one location so that running or working concrete along forms is required. Do not jar forms after concrete has taken initial set; do not place strain on projecting reinforcement or anchor bolts.

03315-12

E. Use tremies for placing concrete in walls and similar narrow or restricted locations. Use tremies made in sections, or provide in several lengths, so that outlet may be adjusted to proper height during placing operations.

F. Place concrete in continuous horizontal layers approximately 12 inches thick. Place each layer while layer below is still plastic.

G. Compact each layer of concrete with concrete spading implements and mechanical vibrators of approved type and adequate number for size of placement. When immersion vibrators cannot be used, use form vibrators. Apply vibrators to concrete immediately after depositing.

Move vibrator vertically through layer of concrete just placed and several inches into plastic layer below. Do not penetrate or disturb layers previously placed which have partially set. Do not use vibrators to aid lateral flow concrete. Closely supervise consolidation to ensure uniform insertion and duration of immersion.

H. Handling and Placing Concrete: Conform to ACI 302.1R, ACI 304R and ACI 309R.

3.06 WATERSTOPS

A. Embed waterstops in concrete across joints as shown. Waterstops shall be continuous for extent of joint; make splices necessary to provide continuity in accordance with manufacturer's instructions. Support and protect waterstops during construction operations;

repair or replace waterstops damaged during construction.

B. Install waterstops in concrete on one side of joints, leaving other side exposed until next pour. When waterstop will remain exposed for 2 days or more, shade and protect exposed waterstop from direct rays of sun during entire exposure and until exposed portion of waterstop is embedded in concrete.

C. Splicing PVC Waterstops:

1. Splice waterstops by heat-sealing adjacent waterstop sections in accordance with manufacturer’s printed instructions.

2. Butt end-to-end joints of two identical waterstop sections may be made in forms during placement of waterstop material.

3. Prior to placement in form work, prefabricate waterstop joints involving more than two ends to be joined together, angle cut, alignment change, or joining of two dissimilar waterstop sections, allowing not less than 24 inch long strips of waterstop material beyond joint. Upon inspection and approval by Project Manager, install prefabricated waterstop joint assemblies in form work, and butt-weld ends of 24 inch strips to straight- run portions of waterstop in forms.

03315-13

D. Setting PVC Waterstops:

1. Correctly position waterstops during installation. Support and anchor waterstops during progress of work to ensure proper embedment in concrete and to prevent folding over of waterstop by concrete placement. Locate symmetrical halves of waterstops equally between concrete pours at joints, with center axis coincident with joint openings. Thoroughly work concrete in joint vicinity for maximum density and imperviousness.

2. Where waterstop in a vertical wall joint does not connect with any other waterstop, and is not intended to be connected to waterstop in future concrete placement, terminate waterstop 6 inches below top of wall.

E. Replacement of Defective Field Joints: Replace waterstop field joints showing evidence of misalignment, offset, porosity, cracks, bubbles, inadequate bond or other defects with products and joints complying with Specifications.

F. Resilient Waterstop:

1. Install resilient waterstop in accordance with manufacturer's instructions and recommendations.

2. When requested by Project Manager, provide technical assistance by manufacturer's representative in field at no additional cost to City.

3. Use resilient waterstop only where complete confinement by concrete is provided; do not use in expansion or contraction joints.

4. Where resilient waterstop is used in combination with PVC waterstop, lap resilient waterstop over PVC waterstop minimum of 6 inches and place in contact with PVC waterstop. Where crossing PVC at right angles, melt PVC ribs to form smooth joining surface.

5. At free top of walls without connecting slabs, stop resilient waterstop and grooves (where used) 6 inches from top in vertical wall joints.

6. Bentonite Waterstop:

a. Locate bentonite waterstop as near as possible to center of joint and extend continuous around entire joint. Minimum distance from edge of waterstop to face of member: 5 inches.

b. Where thickness of concrete member to be placed on bentonite waterstop is less than 12 inches, place waterstop in grooves at least 3/4 inch deep and 1 1/4 inches wide formed or ground into concrete. Minimum distance from edge of waterstop placed in groove to face of member: 2.5 inches.

03315-14

c. Do not place bentonite waterstop when waterstop material temperature is below 40 degrees F. Waterstop material may be warmed so that it remains above 40 degrees F during placement but means used to warm it shall in no way harm material or its properties. Do not install waterstop where air temperature falls outside manufacturer's recommended range.

d. Place bentonite waterstop only on smooth and uniform surfaces; grind concrete smooth when necessary to produce satisfactory substrate, or bond waterstop to irregular surfaces using epoxy grout which completely fills voids and irregularities beneath waterstop material. Prior to installation, wire brush concrete surface to remove laitance and other substances that may interfere with bonding of epoxy.

e. In addition to adhesive backing provided with waterstop, secure bentonite waterstop in place with concrete nails and washers at 12 inch maximum spacing.

7. Adhesive Waterstop:

a. With wire brush thoroughly clean concrete surface on which waterstop is to be placed and then coat with primer.

b. If surface is too rough to allow waterstop to form complete contact, grind to form adequately smooth surface.

c. Install waterstop with top protective paper left in place. Overlap joints between strips minimum of 1 inch and cover back over with protective paper.

d. Do not remove protective paper until just before final form work completion.

Place concrete immediately. time that waterstop material is uncovered prior to concrete placement shall be minimized and shall not exceed 24 hours.

3.07 CONSTRUCTION JOINTS

A. Definitions:

1. Construction joint: Contact surface between plastic (fresh) concrete and concrete that has attained initial set.

2. Monolithic: Manner of concrete placement to reduce or eliminate construction joints;

joints other than those indicated on Drawings will not be permitted without written approval of Project Manager. Where so approved, make additional construction joints with details equivalent to those indicated for joints in similar locations.

3. Preparation for Construction Joints: Roughen surface of concrete previously placed, leaving some aggregate particles exposed. Remove laitance and loose materials by

03315-15 sandblasting or high-pressure water blasting. Keep surface wet for several hours prior to placing of plastic concrete.

3.08 CURING

A. Comply with ACI 308. Cure by preventing loss of moisture, rapid temperature change and mechanical injury for period of 7 curing days when Type II or IP cement has been used and for 3 curing days when Type III cement has been used. Start curing as soon as free water has disappeared from concrete surface after placing and finishing. A curing day is any calendar day in which temperature is above 50 degrees F for at least 19 hours. Colder days may be counted when air temperature adjacent to concrete is maintained above 50 degrees F. In continued cold weather, when artificial heat is not provided, removal of forms and shoring may be permitted at end of calendar days equal to twice required number of curing days.

However, leave soffit forms and shores in place until concrete has reached specified 28 day strength, unless directed otherwise by Project Manager.

B. Cure formed surfaces not requiring rubbed-finished surface by leaving forms in place for full curing period. Keep wood forms wet during curing period. Add water as needed for other types of forms. Or, at Contractor's option, forms may be removed after 2 days and curing compound applied.

C. Rubbed Finish:

1. At formed surfaces requiring rubbed finish, remove forms as soon as practicable without damaging surface.

2. After rubbed-finish operations are complete, continue curing formed surfaces by using either approved curing/sealing compounds or moist cotton mats until normal curing period is complete.

D. Unformed Surfaces: Cure by membrane curing compound method.

1. After concrete has received final finish and surplus water sheen has disappeared, immediately seal surface with uniform coating of approved curing compound, applied at rate of coverage recommended by manufacturer or as directed by Project Manager.

Do not apply less than 1 gallon per 180 square feet of area. Provide satisfactory means to properly control and check rate of application of compound.

2. Thoroughly agitate compound during use and apply by means of approved mechanical power pressure sprayers equipped with atomizing nozzles. For application on small miscellaneous items, hand-powered spray equipment may be used. Prevent loss of compound between nozzle and concrete surface during spraying operations.

3. Do not apply compound to dry surface. When concrete surface has become dry, thoroughly moisten surface immediately prior to application. At locations where coating shows discontinuities, pinholes or other defects, or when rain falls on newly

03315-16 coated surface before film has dried sufficiently to resist damage, apply additional coat of compound at specified rate of coverage.

3.09 REMOVAL OF FORMS AND SHORING

A. Remove forms from surfaces requiring rubbing only as rapidly as rubbing operation progresses. Remove forms from vertical surfaces not requiring rubbed-finish when concrete has aged for required number of curing days. When curing compound is used, do not remove forms before 2 days after concrete placement.

B. Leave soffit forms and shores in place until concrete has reached specified 28-day strength, unless directed otherwise by Project Manager.

3.10 DEFECTIVE WORK

A. Immediately repair defective work discovered after forms have been removed. When concrete surface is bulged, uneven, or shows excess honeycombing or form marks which cannot be repaired satisfactorily through patching, remove and replace entire section.

3.11 FINISHING

A. Patch honeycomb, minor defects and form tie holes in concrete surfaces with cement mortar mixed one part cement to two parts fine aggregate. Repair defects by cutting out unsatisfactory material and replacing with new concrete, securely keyed and bonded to existing concrete. Finish to make junctures between patches and existing concrete as inconspicuous as possible. Use stiff mixture and thoroughly tamp into place. After each patch has stiffened sufficiently to allow for greatest portion of shrinkage, strike off mortar flush with surface.

B. Apply rubbed finish to exposed surfaces of formed concrete structures as noted on Drawings.

After pointing has set sufficiently, wet surface with brush and perform first surface rubbing with No. 16 carborundum stone, or approved equal. Rub sufficiently to bring surface to paste, to remove form marks and projections, and to produce smooth, dense surface. Add cement to form surface paste as necessary. Spread or brush material, which has been ground to paste, uniformly over surface and allow to reset. In preparation for final acceptance, clean surfaces and perform final finish rubbing with No. 30 carborundum stone or approved equal. After rubbing, allow paste on surface to reset; then wash surface with clean water. Leave structure with clean, neat and uniform-appearing finish.

C. Apply wood float finish to concrete slabs.

3.12 FIELD QUALITY CONTROL

A. Testing shall be performed under provisions of Section 01454 - Testing Laboratory Services.

03315-17

B. Unless otherwise directed by Project Manager, following minimum testing of concrete is required. Testing shall be performed by qualified individuals employed by approved independent testing agency, and conform to requirements of ASTM C 1077.

1. Take concrete samples in accordance with ASTM C 172.

2. Make one set of four compression test specimens for each mix design at least once per day and for each 150 cubic yards or fraction thereof. Make, cure and test specimens in accordance with ASTM C 31 and ASTM C 39.

3. When taking compression test specimens, test each sample for slump according to ASTM C 143, for temperature according to ASTM C 1064, for air content according to ASTM C 231, and for unit weight according to ASTM C 138.

4. Inspect, sample and test concrete in accordance with ASTM C 94, Section 13, 14, and 15, and ACI 311-5R.

C. Test Cores: Conform to ASTM C 42.

D. Testing High Early Strength Concrete: When Type III cement is used in concrete, specified 7 day and 28 day compressive strengths shall be applicable at 3 and 7 days, respectively.

E. If 7-day or 3-day test strengths (as applicable for type of cement being used) fail to meet established strength requirements, extended curing or resumed curing on those portions of structure represented by test specimens may be required. When additional curing fails to produce required strength, strengthening or replacement of portions of structure which fail to develop required strength may be required by Project Manager, at no additional cost to City.

3.13 PROTECTION

A. Protect concrete against damage until final acceptance by City.

B. Protect fresh concrete from damage due to rain, hail, sleet, or snow. Provide protection while concrete is still plastic, and whenever precipitation is imminent or occurring.

C. Do not backfill around concrete structures or subject them to design loadings until components of structure needed to resist loading are complete and have reached specified 28 day compressive strength, except as authorized otherwise by Project Manager.

END OF SECTION

2021 STANDARD SPECIFICATION MORTAR

04061-1

SECTION 04061

MORTAR

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Mortar and grout for masonry.

1.02 MEASUREMENT AND PAYMENT

A. Unit Prices.

1. No separate payment will be made for mortar under this Section. Include payment in Lump Sum for building or structure with price breakdown included in Schedule of Values.

2. Refer to Section 01270 - Measurement and Payment and Section 01292- Schedule of Values.

B. Stipulated Price (Lump Sum). If Contract is Stipulated Price Contract, payment for work in this Section is included in total Stipulated Price.

1.03 REFERENCES

A. ASTM C 143 - Standard Testing Method for Slump of Hydraulic Cement Concrete

B. ASTM C 144 - Standard Specification for Aggregate for Masonry Mortar.

C. ASTM C 150 - Standard Specification for Portland Cement.

D. ASTM C 207 - Standard Specification for Hydrated Lime for Masonry Purposes.

E. ASTM C 270 - Standard Specification for Mortar for Unit Masonry.

F. ASTM C 404 - Standard Specification for Aggregates for Masonry Grout.

G. ASTM C 476 - Standard Specification for Grout for Masonry.

H. ASTM C 780 - Standard Test Method for Preconstruction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry.

04061-2

I. ASTM C 109 - Standard Test Method for Compressive Strength of Hydraulic Cement Mortars.

1.04 SUBMITTALS

A. Conform to requirements of Section 01330 - Submittal Procedures.

B. Include design mix, indicate Property Method used, required environmental conditions, and admixture limitations.

C. Samples: Submit two ribbons of each mortar color, illustrating color and color range.

D. Submit test reports under provisions of Section 01450 - Contractor's Quality Control.

E. Submit test reports on mortar indicating conformance to ASTM C 270.

F. Submit test reports on grout indicating conformance to ASTM C 476.

G. Submit manufacturer's certificate under provisions of Section 01450 - Contractor's Quality Control, that products meet or exceed specified requirements.

1.05 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site and store and protect products under provisions of Section 01610 - Basic Product Requirements.

B. Maintain packaged materials clean, dry, and protected against dampness, freezing, and foreign matter.

1.06 ENVIRONMENTAL REQUIREMENTS

A. Maintain materials and surrounding air temperatures to minimum 50 degrees F prior to, during, and 48 hours after completion of masonry work.

1.07 MIX TESTS

A. Test mortar and grout in accordance with Section 01454 - Testing Laboratory Services.

B. Testing of Mortar Mix: Test in accordance with ASTM C 780. Test mortar mix for compressive strength, consistency, mortar aggregate ratio, water content, air content, and splitting tensile strength.

C. Testing of Grout Mix: Test in accordance with ASTM C 109. Test grout mix for compressive strength and slump.

04061-3

PART 2 PRODUCTS

2.01 MATERIALS

A. Portland Cement: ASTM C 150, Type I, white color.

B. Masonry Cement: Not permitted.

C. Mortar Aggregate: ASTM C 144, standard masonry type. Grading and color suitable for type of masonry, one source for entire project. (Not less than 5 percent shall pass No. 100 sieve).

D. Hydrated Lime: ASTM C 207, Type S.

E. Grout Aggregate: ASTM C 404.

F. Water: Clean and potable.

2.02 MORTAR COLOR

A. Mortar Color: Mineral oxide pigment; color; to be selected by Project Manager from manufacturer's samples.

2.03 ADMIXTURES

A. Antifreeze: Antifreeze admixtures will not be permitted.

B. Accelerator: Accelerator may be used only with approval of Project Manager.

2.04 MORTAR

A. Mortar for Load Bearing Walls and Partitions: ASTM C 270, Type S utilizing Property Method to achieve 1800 psi strength.

B. Mortar for Non-load Bearing Walls and Partitions: ASTM C 270, Type S utilizing the Property Method to achieve 1800 psi strength.

C. Mortar for Masonry Below Grade or in Contact with Earth: ASTM C 270, Type M utilizing the Property Method to achieve 2500 psi strength.

D. Pointing Mortar: ASTM C 270, Type N, using the Property Method to achieve 750 psi strength.

04061-4

2.05 MORTAR MIXING

A. Thoroughly mix mortar ingredients in quantities needed for immediate use in accordance with ASTM C 270 to achieve strengths noted in Paragraph 2.04.

B. Add mortar color and admixtures in accordance with manufacturer's instructions. Provide uniformity of mix and coloration.

C. Do not use anti-freeze compounds to lower freezing point of mortar.

D. If water is lost by evaporation, retemper only within 2 hours of mixing.

E. Use mortar within 2 hours after mixing at temperatures of 80 degrees F, or 2 1/2 hours at temperatures under 50 degrees F.

2.06 GROUT

A. Bond Beams, Lintels, and Other Areas to be Grouted Solid: 3000 psi strength at 28 days; 7 to 8 inches slump per ASTM C 143; mixed in accordance with ASTM C 476, Fine Grout.

2.07 GROUT MIXING

A. Thoroughly mix mortar ingredients in quantities needed for immediate use in accordance with ASTM C 476, Fine Grout.

B. Add admixtures in accordance with manufacturer's instructions. Provide uniformity of mix.

C. Do not use anti-freeze compounds to lower freezing point of grout.

PART 3 EXECUTION

3.01 EXAMINATION

A. Request inspection of spaces to be grouted.

3.02 PREPARATION

A. Apply bonding agent to existing concrete surfaces.

B. Plug clean out holes with masonry units to prevent leakage of grout materials. Brace masonry for wet grout pressure.

04061-5

3.03 INSTALLATION

A. Install mortar and grout in accordance with manufacturer's instructions.

B. Work grout into masonry cores and cavities to eliminate voids.

C. Do not displace reinforcement while placing grout.

D. Remove grout spaces of excess mortar.

END OF SECTION

Item 540

Metal Beam Guard Fence

1. DESCRIPTION

Furnish, install, replace, or adjust metal beam guard fence consisting of metal beam rail elements, hardware, blocks, and support posts.

2. MATERIALS

Provide samples of metal beam rail elements, terminal sections, bolts, and nuts for compliance testing according to Tex-708-I and Tex-713-I to verify physical and chemical properties meet AASHTO M 180 when directed.

Obtain materials at the locations shown on the plans when the plans designate that the Department will furnish materials.

2.1. Metal Beam Rail Elements. Furnish new metal beam rail elements, transitions, anchor sections, and terminals that meet the requirements of Table 1 and are from a manufacturer on the Department’s MPL of rail element manufacturers.

Type I or II is required, unless otherwise shown on the plans. Base metal for metal beam rail elements must not contain more than 0.04% phosphorous or more than 0.05% sulfur.

Warped or deformed rail elements will be rejected.

Table 1 Rail Element Requirements

Specification AASHTO M 180

Class A— Base metal nominal thickness 0.105 in.

B— Base metal nominal thickness 0.135 in.

Type I— Zinc-coated 1.80 oz. per square foot minimum single-spot.

II— Zinc-coated 3.60 oz. per square foot minimum single-spot.

IV— Weathering Steel (required when shown on the plans).

Shape W-Beam Thrie Beam W-Beam to Thrie Beam Transition

Markings

Permanently mark each metal beam rail element with the information required in AASHTO M 180. In addition, permanently mark all curved sections of metal beam rail element with the radius of the curved section in the format “R=XX ft.” Markings must be on the back of the metal beam rail section away from traffic and visible after erection.

2.2. Posts. Furnish new round timber, rectangular timber, or rolled steel section posts in accordance with details shown on the plans and the following requirements:

2.2.1. Timber Posts. Meet the requirements of DMS-7200, “Timber Posts and Blocks for Metal Beam Guard Fence.” Purchase from a manufacturer or supplier on the Department’s MPL of timber treating plants and suppliers.

2.2.2. Steel Posts. Provide rolled sections conforming to the material requirements of ASTM A36. Drill or punch posts for standard rail attachment as shown on the plans. Galvanize according to Item 445, “Galvanizing.”

Low-fill culvert posts may be fabricated as galvanized “blanks” with the rail hole and the final height field fabricated. Treat all exposed post surfaces caused by the field fabrication in accordance with Section 445.3.5., “Repairs.”

2.3. Blocks. Furnish new rectangular timber or composite blocks in accordance with details shown on the plans and the following requirements:

2.3.1. Timber. Meet the requirements of DMS-7200, “Timber Posts and Blocks for Metal Beam Guard Fence.”

Purchase from a manufacturer or supplier on the Department’s MPL of timber treating plants and suppliers.

2.3.2. Composite. Meet the requirements of DMS-7210, “Composite Material Posts and Blocks for Metal Beam Guard Fence.” Purchase from a manufacturer on the Department’s MPL of composite material blocks and posts.

2.4. Fittings. Furnish new fittings (bolts, nuts, and washers) according to the details shown on the plans and galvanized according to Item 445, “Galvanizing.”

2.5. Terminal Connectors. Furnish new terminal connectors, where required, meeting the material and galvanizing requirements specified for metal beam rail elements.

2.6. Concrete. Furnish concrete for terminal anchor posts meeting the requirements for Class A concrete as required in Item 421, “Hydraulic Cement Concrete.”

2.7. Curb. If indicated in the details, furnish the curb shown with metal beam guard fence transition as required by Item 529, “Concrete Curb, Gutter, and Combined Curb and Gutter.”

2.8. Terminal Anchor Posts. Furnish new terminal anchor posts from steel conforming to the material requirements of ASTM A36. Fabricate posts according to Item 441, “Steel Structures.” Galvanize terminal anchor posts after fabrication according to Item 445, “Galvanizing.”

2.9. Driveway Terminal Anchor Posts. Furnish new terminal anchor posts from steel conforming to the material requirements of ASTM A36. Fabricate posts according to Item 441, “Steel Structures.” Galvanize terminal anchor posts after fabrication according to Item 445, “Galvanizing.”

2.10. Downstream Anchor Posts. Furnish new terminal anchor posts consisting of new rectangular timber and new steel foundation tubes according to details shown on the plans.

2.11. Downstream Anchor Hardware. Furnish new hardware (brackets, plates, struts, cable, etc.) according to the details shown on the plans and galvanized according to Item 445, “Galvanizing.”

2.12. Controlled Released Terminal (CRT) Posts. Furnish new CRT posts according to the details shown on the plans and conforming to the requirements of DMS-7200, “Timber Posts and Blocks for Metal Beam Guard Fence.” Purchase from a manufacturer or supplier on the Department’s MPL of timber treating plants and suppliers.

3. CONSTRUCTION

Install posts and rail elements according to details shown on the plans.

3.1. Posts. Install posts by either drilling or driving.

3.1.1. Drilling. Drill holes and set posts plumb and firm to the line and grade shown. Backfill posts by thoroughly compacting material to the density of adjacent undisturbed material.

3.1.2. Driving. Drive posts plumb with approved power hammers (steam, compressed air, vibratory, or diesel) or gravity hammers to the line and grade shown while preventing damage to the post. Use pilot holes when required and approved. Determine the size and depth of pilot holes based on results of the first few posts driven. Thoroughly tamp loosened soil around the post, fill voids with suitable material, and thoroughly compact to the density of adjacent undisturbed material.

3.2. Rail Elements. Erect metal beam rail elements to produce a smooth, continuous rail paralleling the line and grade of the roadway surface or as shown on the plans. Bolt rail elements end-to-end and lap splices in the direction of traffic. Field-drill or punch holes in rail elements for special details, only when approved.

3.3. Short Radius. Special rail fabrication with a required radius must be as shown on the plans.

3.4. Terminal Anchor Posts. Embed terminal anchor posts in concrete, unless otherwise shown on the plans.

3.5. Galvanizing Repair. Repair all parts of galvanized steel posts, washers, bolts, and rail elements after erection where galvanizing has become scratched, chipped, or otherwise damaged. Repair in accordance with Section 445.3.5., “Repairs.”

3.6. Guardrail Adjustment. Work includes vertical adjustment, horizontal shift, and overlap of the rail element to meet the detail shown on the plans.

3.7. Curb. If indicated in the details, construct the curb shown with metal beam guard fence transition as required by Item 529, “Concrete Curb, Gutter, and Combined Curb and Gutter.”

3.8. Driveway Terminal Anchor Posts. Embed terminal anchor posts in concrete, unless otherwise shown on the plans.

4. MEASUREMENT

4.1. Guard Fence. Measurement will be by the foot of fence. Fence will be measured on the face of the rail in place, from center-to-center of end splice locations.

4.2. Terminal Anchor Sections. Measurement will be by each section, complete in place, consisting of a terminal anchor post and one 25-ft. section of rail element.

4.3. Transitions. Transitions for rail connection will be measured by each transition.

4.4. Short Radius. Measurement will be by the foot to the nearest whole foot along the face of the rail in place, from beginning of radius (first CRT post) to the end of radius.

4.5. Driveway Terminal Anchor Section. Measurement will be by each section, complete in place, consisting of a driveway terminal anchor post and one 6-ft. section of rail element.

4.6. Downstream Anchor Terminal. Measurement will be by each section, complete in place, consisting of one W-Beam end section, 2 downstream anchor posts, and one rail section.

4.7. Long Span System. Measurement will be by the foot of fence. Fence will be measured on the face of the rail, in place, between the first CRT and last CRT posts in the system.

5. PAYMENT

The work performed and material furnished in accordance with this Item and measured as provided under “Measurement” will be paid at the unit price bid for “Metal W-Beam Guard Fence” of the post type specified;

“Metal Thrie Beam Guard Fence” of the post type specified; “Terminal Anchor Section”; “Metal Beam Guard Fence Transition” of the type specified; “Metal W-Beam Guard Fence Adjustment”; “Metal Thrie Beam Guard Fence Adjustment”; “Terminal Anchor Section Adjustment”; “Transition Adjustment”; “Short Radius”;

“Driveway Terminal Anchor Section; “Downstream Anchor Terminal”; or “Metal Beam Guard Fence (Long Span System).” When weathering steel is required, Type IV will be specified.

Samples furnished to the Department for testing purposes, special backfill materials, and concrete curbs will not be paid directly but are subsidiary to this Item.

5.1. Guard Fence. The price bid for “Metal W-Beam Guard Fence” or “Metal Thrie Beam Guard Fence” is full compensation for materials, hauling, erection, setting posts in concrete, blocks, driving posts, excavating, backfilling, equipment, labor, tools, and incidentals.

5.2. Terminal Anchor Section. When a separate bid item is specified, the price bid for “Terminal Anchor Section” is full compensation for furnishing the rail element, anchor assembly, terminal anchor post, and foundations; installing the rail element anchor assembly and the terminal anchor post and foundations;

excavation and backfilling; and equipment, labor, tools, and incidentals.

5.3. Transition. The price bid for “Metal Beam Guard Fence Transition” is full compensation for furnishing nested sections of Thrie Beam; nested sections of W-Beam; Thrie Beam to W-Beam transitional rail piece, posts, concrete, curb, and connections to W-Beam guard fence and bridge rails; Thrie Beam terminal connectors;

excavation and backfilling; and equipment, labor, tools, and incidentals.

5.4. Guardrail Adjustment. The price bid for “Metal W-Beam Guard Fence Adjustment,” “Metal Thrie Beam Guard Fence Adjustment,” “Terminal Anchor Section Adjustment,” and “Transition Adjustment” is full compensation for furnishing materials not supplied by the Department, drilling holes in posts, hauling, erection, blocks, excavation, backfill, cleaning, salvaging materials, setting rail element anchor assembly and terminal anchor post, removal of rail element, concrete, curb, equipment, labor, tools, and incidentals.

5.5. Short Radius. The price bid for “Short Radius” is full compensation for furnishing special rail fabricated metal beam guard fence, CRT posts, steel posts, sand barrels, end terminal, cable anchor, materials, hauling, erection, blocks, driving posts, excavating, backfilling, equipment, labor, tools, and incidentals.

5.6. Driveway Terminal Anchor Section. The price bid for “Driveway Terminal Anchor Section” is full compensation for furnishing the rail element, driveway anchor assembly, driveway terminal anchor post, and foundations; installing the rail element anchor assembly and the driveway terminal anchor post and foundations; excavation and backfilling; and equipment, labor, tools, and incidentals.

5.7. Downstream Anchor Terminal. The price bid for “Downstream Anchor Terminal” is full compensation for furnishing the rail element, W-Beam end section, guardrail anchor bracket, shelf angle bracket, channel strut, downstream anchor posts, breakaway cable terminal (BCT) cable anchor assembly, and foundations;

installing the BCT cable anchor assembly and the downstream anchor post and foundations; excavation and backfilling; and equipment, labor, tools, and incidentals.

5.8. Long Span System. The price bid for “Metal Beam Guard Fence (Long Span System)” is full compensation for furnishing the rail element, CRT posts, materials, hauling, erection, blocks, driving posts, excavating, backfilling, equipment, labor, tools, and incidentals.

Item 544

Guardrail End Treatments

1. DESCRIPTION

Furnish and install, move, or remove guardrail end treatments.

2. MATERIALS

Furnish new materials from the Department’s MPL of rail element manufacturers. Obtain materials at the location shown on the plans when furnished by the Department.

3. CONSTRUCTION

Install guardrail end treatments in accordance with manufacturer’s assembly and installation requirements and the details shown on the plans. Provide the Engineer with manufacturer’s installation and repair manuals specific to the guardrail end treatment.

Move or remove guardrail end treatments in accordance with the plans and as directed. Deliver salvageable materials in accordance with the plans or as directed. Dispose of unsalvageable materials in accordance with federal, state, and local regulations.

4. MEASUREMENT

This Item will be measured by each guardrail end treatment.

5. PAYMENT

The work performed and the materials furnished in accordance with this Item and measured as provided for under “Measurement” will be paid for at the unit price bid for “Guardrail End Treatment (Install)” of the post and type specified where applicable, “Guardrail End Treatment (Move and Reset),” or “Guardrail End Treatment (Remove).” This price is full compensation for foundations, materials, stockpiling, disposal of unsalvageable materials, equipment, labor, tools, and incidentals.

Payment for “Guardrail End Treatment (Move and Reset)” will include each guardrail end treatment removed from a stockpile or from an existing location and reset in a new location as detailed on the plans or as directed.

Payment for “Guardrail End Treatment (Remove)” will include each guardrail end treatment removed from an existing location and stockpiled at the location designated on the plans, disposed, or as otherwise directed.

Item 545

Crash Cushion Attenuators

1. DESCRIPTION

Furnish and install, move and reset, or remove crash cushion attenuators.

2. MATERIALS

2.1. Crash Cushion Attenuators. Furnish new crash cushion attenuators in accordance with the details shown on the plans and on the manufacturer’s shop drawings. Obtain crash cushion attenuators at the location shown on the plans when furnished by the Department.

2.2. Concrete. Furnish Class S concrete for pads that meets Item 421, “Hydraulic Cement Concrete.”

3. CONSTRUCTION

Perform the following as shown on the plans:

3.1. Installation. Assemble and install crash cushion attenuators in accordance with the details shown on the plans and manufacturer recommendations. Obtain assembly and installation information for the crash cushion attenuators from the manufacturer and provide the Engineer with an installation and repair manual specific to the crash cushion attenuators.

3.2. Moving and Resetting. Remove crash cushion attenuators from a stockpile or from an existing location and reset in a new location as shown on the plans or as directed. Install crash cushion attenuators in accordance with pertinent standards and manufacturer recommendations. Provide additional materials to complete the installation as needed. Dispose of unsalvageable materials in accordance with federal, state, and local regulations.

3.3. Removal. Remove crash cushion attenuators from an existing location and stockpile in the area designated on the plans, as directed, or dispose. Clean and repair salvageable units before inspection and return them to the Department. Dispose of unsalvageable materials in accordance with federal, state, and local regulations.

4. MEASUREMENT

This Item will be measured by each crash cushion attenuator.

5. PAYMENT

The work performed and the materials furnished in accordance with this Item and measured as provided for under “Measurement” will be paid for at the unit price bid for “Crash Cushion Attenuator (Furnish and Install, Designated Source, Move and Reset, Stockpile, or Remove)” of the category, width (N or W), and test level.

This price is full compensation for foundations; materials, stockpiling, moving and removing, hauling, installing and resetting, disposal of unsalvageable materials, equipment, labor, tools, and incidentals.

5.1. Furnish and Install. This price is full compensation for furnishing and installing crash cushion attenuator.

5.2. Designated Source. This price is full compensation for delivering and installing Department-furnished crash cushion attenuator from a designated source.

5.3. Move and Reset. This price is full compensation for moving crash cushion attenuator installations on the project from one location to another (including disassembly and reassembly costs), moving crash cushion attenuator from an installation on the project to a temporary storage area (including disassembly costs), and moving crash cushion attenuator from a temporary storage area to an installation site on the project (including assembly costs).

5.4. Stockpile. This price is full compensation for removing crash cushion attenuator from the project and delivering to the Department stockpile area shown on the plans or as directed.

5.5. Remove. This price is full compensation for removing crash cushion attenuator from the project and retained by the Contractor.

PART IX

Federal Register- Trench Safety

This page intentionally left blank

PART X

ADDENDA

This page intentionally left blank

Technical Specifications-Huntsville-20240124 Carrie.pdf
Standard Construction Specifications 02082-02400
04061 MORTAR (2021)
Standard Construction Specifications 02401-TxDOT 544-6002
04061 MORTAR (2021)
540 METAL BEAM GUARD FENCE
544 GUARDRAIL END TREATMENTS
545 CRASH CUSHION ATTENUATORS