ESBD_361712_1717620394716_Combined Dwgs .pdf

PDF 4 MB Posted

Attached to
Boiler
Solicitation number
IW185580
Issued by
Galveston County, Texas

About this file

This document is a set of engineering drawings and specifications for a project to replace a boiler at the Young Unit of the Texas Department of Criminal Justice (TDCJ) located in Dickenson, Texas. The project includes the demolition of the existing boiler #2 and the installation of a new KN 20 hydronic boiler. The drawings provide details on the boiler dimensions, connections, temperature rise, pressure drop, and vent and air intake requirements. The related state and local contract opportunity indicates that TDCJ is seeking bids to procure and install a new boiler, including removal of the existing equipment, training, and start-up. The contract will be awarded to the successful bidder.

The contract opportunity does not provide specific details on pricing terms, set asides, incumbents, funding requirements, or other salient information. Interested parties will need to review the full solicitation documents to obtain this additional information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HUNTSVILLE, TEXAS

ENGINEERING SERVICES

REPLACE BOILER - BOILER RM.

YOUNG UNIT

DICKENSON, TEXAS

MWR NO. 12923002

ISSUED FOR CONSTRUCTION

GALVESTON COUNTY

SITE LOCATION

DICKENSON. TEXAS

29.426 N / -95.982 W

PROJECT LOCATION

YOUNG MEDICAL UNIT

THE TEXAS DEPARTMENT OF CRIMINAL JUSTICE

FACILITIES DIVISION

N

T H

E

S T A T E O F T E X

A S

M W

R

U N

IT

YO

U

N G

U N

IT

PR

O

JE

C T:

R

EP

LA

C

E

BO

IL

ER

BO

IL

ER

R M

YOUNG UNIT

PROJECT LOCATION

29°25' 31.70" N / 94°58' 51.40" W

REGIONAL MEDICAL

FACILITY

CONTROL

PLANT

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X X

X X

X X

X

XXX

X X

X X

X X

XXX X X X X X X X X

X X X X X X X X X X

AREA MAP

N

YOUNG UNIT

DRAWING INDEX

COVER SHEET

M1 PLAN

M2 DUCT DETAILS

D1 DEMO PLAN

PL

O

T D

AT

E:

3/

/2

1:

P

M D

R

AW

IN

G

P

AT

H

J:

\D

EP

TI

N

FO

\E ng in ee rin g\

En gi ne er in g

G ro up \E

N G

\A C

AD

L

IB

R

AR

Y\

Pr oj ec t D ra w in g

D at ab as e\ Yo un g

U ni t\1

R ep la ce B oi le r - B oi le r R m

\1

C ov er

S ht

.d w g

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text

TYLER

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text

HUNTSVILLE

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text

AUSTIN

AutoCAD SHX Text

SAN ANTONIO

AutoCAD SHX Text

HOUSTON

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text

DALLAS

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

LUBBOCK

AutoCAD SHX Text

AMARILLO

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

EL PASO

AutoCAD SHX Text p

AutoCAD SHX Text

LAREDO

AutoCAD SHX Text

FT. WORTH

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text o

TEXAS DEPARTMENT OF CRIMINAL JUSTICE

ISSUE FOR: REVISIONS: MWR:

M W

R

U N

IT

PR

O

JE

C

T N

AM

E:

ENGINEER:

DRAFTER:

DATE:

SCALE:

DESC:

YOUNG UNIT

REPLACE BOILER - BOILER RM.

12923002

TIM KIERSZ

Drafter

03/21/2024

1/4"=1'-0"

DISC

M1

SHT. 2 OF 4

YO

U

N G

U N

IT

R

EP

LA

C E

BO

IL

ER

BO

IL

ER

R

M l1 l2

I3

I4

I5

R1

R2

R3

R4

R5

DATE: DATE:

PL

O

T D

AT

E:

3/

/2

1:

P

M D

R

AW

IN

G

P

AT

H

J:

\D

EP

TI

N

FO

\E ng in ee rin g\

En gi ne er in g

G ro up \E

N G

\A C

AD

L

IB

R

AR

Y\

Pr oj ec t D ra w in g

D at ab as e\ Yo un g

U ni t\1

R ep la ce B oi le r - B oi le r R m

\1

Pl an .d w g

NOTES:

1. BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND

INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO

BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE

THE LANGUAGE "OR A/E APPROVED EQUAL". ANY BRAND OR

MANUFACTURER MEETING SPECIFICATIONS WILL BE CONSIDERED,

IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL" APPEARING

IN CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.

2. ALL DIMENSIONS ARE PLUS (+) OR MINUS (-). CONTRACTOR TO FIELD

VERIFY DIMENSIONS BEFORE FABRICATION.

NEW KN 20 BOILER

HYDRONIC BOILER PLAN

CHILLER #1

CHILLER #2

CDP-1

CDP-2

BOILER #1

BOILER #2

46°

N

CONSTRUCTION 4-11-2024

4-11-24

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text J

T

57 13/16 [1469mm]

15/16 [24mm]

63 5/8 [1617mm]

11 9/16 [293mm]

8" FLUE

3"

BOILER

INLET

3"

BOILER

OUTLET

9" AIR INLET

[1651mm]

5 3/8 [137mm]

66 1/8 [1680mm]

28 7/8 [733mm]

[1676mm]

21 7/8 [556mm]

22 7/16 [570mm]

47 3/4 [1213mm]3/4" DRAIN VALVE

13 1/16 [332mm]

30 7/16 [773mm]

25 15/16 [658mm]

Dimensions are approximate and should not be used to "rough in" equipment.

LEFT SIDE

FRONT RIGHT SIDE

REAR

1 1/2" GAS INLET

17 1/4 [439mm]

3 1/4 [83mm]

19 13/16 [503mm]

21 5/8 [550mm]

24 13/16 [630mm]

8" ADAPTER

NOTE:

TEXAS DEPARTMENT OF CRIMINAL JUSTICE

ENGINEERING SERVICES

ISSUE FOR: REVISIONS: MWR:

M W

R

U N

IT

PR

O

JE

C

T N

AM

E:

ENGINEER:

DRAFTER:

DATE:

SCALE:

DESC:

YOUNG UNIT

REPLACE BOILER - BOILER RM.

12923002

TIM KIERSZ

Drafter

03/21/2024

1/4"=1'-0"

DISC

M2

SHT. 3 OF 4

YO

U

N G

U N

IT

R

EP

LA

C E

BO

IL

ER

BO

IL

ER

R

M l1 l2

I3

I4

I5

R1

R2

R3

R4

R5

DATE: DATE:

PL

O

T D

AT

E:

3/

/2

1:

P

M D

R

AW

IN

G

P

AT

H

J:

\D

EP

TI

N

FO

\E ng in ee rin g\

En gi ne er in g

G ro up \E

N G

\A C

AD

L

IB

R

AR

Y\

Pr oj ec t D ra w in g

D at ab as e\ Yo un g

U ni t\1

R ep la ce B oi le r - B oi le r R m

\1

Pl an .d w g

NOTES:

1. BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL

REFERENCES TO BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE THE LANGUAGE "OR A/E APPROVED EQUAL". ANY BRAND OR MANUFACTURER MEETING SPECIFICATIONS WILL BE CONSIDERED, IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL" APPEARING IN CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.

2. ALL DIMENSIONS ARE PLUS (+) OR MINUS (-). CONTRACTOR TO FIELD VERIFY DIMENSIONS BEFORE FABRICATION.

TEMPERATURE RISE / PRESSURE DROP

20° F / 11.1°C 40°F / 22.2°C 60°F / 33.3°C 80°F / 44.4°C 100°F / 55.5°C FLOW RATE PRESS. DROP FLOW RATE PRESS. DROP FLOW RATE PRESS. DROP FLOW RATE PRESS. DROP FLOW RATE PRESS. DROP

GPM L/s Ft kPa GPM L/s Ft kPa GPM L/s Ft. kPa GPM L/s Ft kPa GPM L/s Ft kPa

185.5 11.71 2.20 6.48 92.7 5.85 .55 1.62 61.8 3.90 .24 .72 46.4 2.93 .14 .41 37.1 2.34 .09 .27

FLOW GPM TEMP. RISE (°F) VENT LENGTH (EQUIV. FT.) AIR INLET LENGTH (EQUIV. FT.)

MIN. MAX MIN MAX MIN MAX MIN MAX

37.1 185.5 20 100 6 120 0 80

KN 20 HYDRONIC BOILER

DETAILS

CONSTRUCTION 4-11-2024

4-11-24

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text J

TEXAS DEPARTMENT OF CRIMINAL JUSTICE

ISSUE FOR: REVISIONS: MWR:

M W

R

U N

IT

PR

O

JE

C

T N

AM

E:

ENGINEER:

DRAFTER:

DATE:

SCALE:

DESC:

YOUNG UNIT

REPLACE BOILER - BOILER RM.

12923002

TIM KIERSZ

Drafter

03/21/2024

1/4"=1'-0"

DISC

D1

SHT. 4 OF 4

YO

U

N G

U N

IT

R

EP

LA

C E

BO

IL

ER

BO

IL

ER

R

M l1 l2

I3

I4

I5

R1

R2

R3

R4

R5

DATE: DATE:

PL

O

T D

AT

E:

3/

/2

1:

P

M D

R

AW

IN

G

P

AT

H

J:

\D

EP

TI

N

FO

\E ng in ee rin g\

En gi ne er in g

G ro up \E

N G

\A C

AD

L

IB

R

AR

Y\

Pr oj ec t D ra w in g

D at ab as e\ Yo un g

U ni t\1

R ep la ce B oi le r - B oi le r R m

\1

Pl an .d w g

NOTES:

1. BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND

INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO

BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE

THE LANGUAGE "OR A/E APPROVED EQUAL". ANY BRAND OR

MANUFACTURER MEETING SPECIFICATIONS WILL BE CONSIDERED,

IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL" APPEARING

IN CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.

2. ALL DIMENSIONS ARE PLUS (+) OR MINUS (-). CONTRACTOR TO FIELD

VERIFY DIMENSIONS BEFORE FABRICATION.

DEMO EXIST.

BOILER #2

DEMO PLAN

CHILLER #1

CHILLER #2

CDP-1

CDP-2

BOILER #1

BOILER #2

X X

46°

N

CONSTRUCTION 4-11-2024

4-11-24

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text J

12923002 Cover Sht-Cover Sht.
Sheets and Views
Cover Sht.
12923002 Plan-M1
Sheets and Views
M1
12923002 Plan-M2
Sheets and Views
M2
12923002 Plan-D1
Sheets and Views
D1

File details come from the government source that posted it. Updated .