This document is an Addendum to a Solicitation issued by the Texas Military Department (TMD) for the Weatherford Readiness Center (RC) Major Maintenance (MM) STAR project. The purpose of this Addendum is to clarify that the General Contractor, and not the A/E or Owner, will be responsible for hiring all material/special inspection subcontractors and for the performance and payment of all material testing and special inspections for the project. This supersedes any information to the contrary throughout the construction documents.
The Weatherford RC MM STAR project has a total estimated cost of $2,750,000.00 and involves interior building improvements, including architectural, mechanical, electrical, plumbing, structural, fire suppression, and IT/telecom trades, as well as exterior building improvements such as site civil and utility modifications. General Contractors must request the Drawings/Plans and Specifications electronically and attend one of two mandatory site visits on June 13 or 14, 2024. Competitive Sealed Proposals must be received by the TMD until 10:00 AM CT on July 23, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Texas Military Department 2200 W. 35th St. Bldg. 37
Austin, Texas 78703
ADDENDUM TO SOLICITATION
1. SOLICITATION NO.
TMD24-CFMO-0035207
Weatherford RC MM STAR
2. ADDENDUM NO.
3. EFFECTIVE DATE
6/20/2024
4. ISSUED BY
Texas Military Department (TMD) 2200 W. 35th Street Bldg. 37 Austin, Texas 78703
5. ACKNOWLEDGEMENT OF ADDENDUM
Per RFP Section III, 4) Addendum, b. Receipt of all addenda to this RFP shall be acknowledged by returning a signed copy of the signature page of each addendum with the proposal. In addition, the Respondent must acknowledge receipt of all addenda by writing the numerical figure of each Addendum issued by the TMD on the blank space provided in Attachment A – Contractor's Proposal Form, 3.
Addenda.
6. DESCRIPTION OF ADDENDUM
The purpose of this Addendum is to update and clarify where the Plan Drawings and the Specifications state or otherwise communicate that A/E or OWNER is responsible for coordinating and scheduling with the owner's representative all materials testing and inspections, for example, as stated in Division 1 (01
40 00; QUALITY REQUIREMENTS).
Now, the change is that the General Contractor WILL BE responsible for hiring all material/special inspection subcontractors. The General contractor will additionally be responsible for the performance and payment of all material testing and special inspections for the project. Any information to the contrary throughout the construction documents is to be ignored. This includes any/all instances on the Plan Drawings and in the Specifications.
7. NAME AND ADDRESS OF RESPONDENT
8. NAME AND TITLE OF SIGNER
9. SIGNATURE
(Signature of Person Authorized to Sign) Date Signed