This document appears to be a set of plans related to RFP 041859-24-01 for a Fuel Station Renovation at the Dalhart MNT Facility in the state of Texas. The project involves renovations to a fuel station facility. No additional details on the scope of the renovation work or projected quantities are provided. The response due date, site visit information, and award date are not included in the document. The contract term and any renewal options are also not specified.
The pricing terms, set asides, incumbent contractor, current environment, funding requirements and sources, and other salient details are not disclosed in this document. The file appears to contain only the plans and does not provide the full solicitation information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
..: a. <t
"O "
(L O'>
"O .... N 0 N
� w :r:
Vll QC w ei � 0 c5 / z (/) 0
C "
QC
VJ
:, u..
I- I ... N I m LO
Q'.) - I ...
j N 0 N Q'.) ... 0 d
J w :::,u..
/ m- 0 m... 0 >-I z
� <t :r:
_J <t 0 j 0
I 0
/ en "" t:'. 0 a.a. :, /en a.
e z / :r:
I 0
0 0
0 X
LL
PROJECT L
NORTH
VICINITY MAP
DALLUM COUNTY, TX
GENERAL NOTES
1. WORK SHALL CONFORM TO THE CONSTRUCTION DOCUMENTS & ALL
APPLICABLE BUILDING CODES {INCLUDING FEDERAL & STATE CODES.
ORDINANCES, REGULATIONS, ETC.) CONSTRUCTION DOCUMENTS
INCLUDE CIVIL, LANDSCAPE, ARCHITECTURAL, STRUCTURAL, MEP
DRAWINGS & SPECIFICATIONS PLUS ANY ADDENDA TO THE
AFOREMENTIONED.
2. CONSTRUCTION DOCUMENTS ARE INTENDED TO INCLUDE ITEMS
NECESSARY TO CONVEY DESIGN INTENT OF THE WORK.
MANUFACTURERS' INSTRUCTIONS SHALL BE CONSIDERED AS PART OF
THE SPECIFICATIONS WHETHER INCLUDED OR NOT IN THE
SPECIFICATION MANUAL . THE TECHNICAL COMPETENCY OF THE
CONTRACTOR & SUBCONTRACTOR IS REASONABLY INERRABLE AS
BEING NECESSARY TO PRODUCE THE INTENDED RESULTS.
3. PERIODIC SITE VISITS BY OWNER'S REPRESENTATIVE SHALL NOT BE
CONSTRUED AS SUPERVISION OF MEANS, METHODS, TECHNIQUES,
SEQUENCES OR PROCEDURES FOR CONSTRUCTION, NOR IMPLY
RESPONSIBILITY FOR PROVIDING A SAFE PLACE FOR PERFORMANCE
OF WORK BY CONTRACTOR OR CONTRACTOR'S EMPLOYEES, OR
EMPLOYEES OF SUPPLIERS, OR FOR ACCESS, VISITS, USE, WORK,
TRAVEL, OR OCCUPANCY BY ANY PERSON.
DALHART MAINTENANCE FACILITY
FUEL STATION
RENOVATION PROJECT
SCOPE OF WORK:
BUILDING CODES
INTERNATIONAL BUILDING CODE IBC - 2021
AMERICANS W/ DISABILITIES ACT ADAAG -2010
TEXAS ACCESSIBILITY STANDARDS TAS-2012
INTERNATIONAL ENERGY CONSERVATION CODE IECC - 2018
INTERNATIONAL MECHANICAL CODE IMC - 2021
INTERNATIONAL PLUMBING CODE IPC - 2021
NATIONAL ELECTRIC CODE NEC-2023
NATIONAL FIRE CODE NFPA 1 - 2021
NATIONAL LIFE SAFETY CODE NFPA 101 - 2021
NATIONAL FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE NFPA 30 - 2021
NATIONAL CODE FOR MOTOR FUEL DISPENSING FACILITIES AND REPAIR GARAGES NFPA 30A-2021 TxDOT STANDARD SPECS FOR CONSTRUCTION .................. HIGHWAYS, STREETS AND BRIDGES -2014
THIS PROJECT INCLUDES RENOVATION OF AN EXISTING FUEL STATION BY UTILIZING EXISTING ELECTRICAL INFRASTRUCTURE AND BRING THE
FUEL STATION UP TO COMPLETE OPERATION.
I Texas Department of Transportation
Support Services Division I Facilities Planning & Management
4. CONTRACTOR SHALL:
6230 Stassney Lane Austin, Texas 78744
VERIFY DIMENSIONS & FIELD CONDITIONS BEFORE PROCEEDING.
NOTIFY ARCHITECT OF FIELD CONDITIONS REQUIRING DEVIATIONS
FROM CONSTRUCTION DOCUMENTS BEFORE THE CONSTRUCTION
OF ANY MODIFICATION.
PROVIDE ADEQUATE BRACING & SHORING AS NECESSARY UNTIL
PERMANENT SUPPORTS & STIFFENERS ARE INSTALLED.
IMMEDIATELY REPAIR OR REPLACE DAMAGED OR DEFECTIVE
WORK TO THE APPROVAL OF (AND AT NO ADDITIONAL COST TO)
THE OWNER
NOTIFY ARCHITECT & APPROPRIATE INSPECTORS AT CRITICAL
CONSTRUCTION MILESTONES IN ORDER TO OBTAIN NECESSARY
APPROVALS & INSPECTIONS PRIOR TO COMMENCEMENT OF
SUBSEQUENT WORK.
TAKE REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND
PROVIDE REASONABLE PROTECTION TO PREVENT DAMAGE,
INJURY OR LOSS TO:
a) EMPLOYEES & ALL OTHER AFFECTED PERSONS
b) ALL WORK, MATERIALS & EQUIPMENT
c) OTHER PROPERTY AT SITE OR ADJACENT THERETO.
UPON COMPLETION OF THE WORK, REMOVE MATERIALS, TOOLS &
EQUIPMENT AND LEAVE SITE IN A CONDITION ACCEPTABLE TO
OWNER.
Project Manager: CHRISTOPHER BECK
CONSTRUCTION PROJECT MANAGER
0(806) 224-6737 CHRISTOPHER.BECK@TxDOT.gov
FUEL STATION
PROJECT:
SITE# 049019
12190 US 87N
DALHART, TX 79022
AMARILLO DISTRICT (04)
PROJECT NUMBER: 04-1859-24-01
INDEX OF DRAWINGS
FS2.1 FUEL STATION PLAN, SCHEDULE AND ELEVATIONS
ELECTRICAL
EF1 .1 ELECTRICAL SITE PLAN
EF2.1 ELECTRICAL POWER PLAN, SPECIAL SYSTEMS & SCHEDULE
EF3.1 CLASS 1, DIVISION 1 & 2 PLAN & ELEVATIONS
EF4.1 ELECTRICAL PANELBOARD SCHEDULES & LEGEND
\''\� ..•. !-.-t"/ ,, c, .•• � ·• . .so ,, I. • : ..... : .. �.ll ;.:.'!',..: ......... •y···w·····M· ARSH " ANTHq� ....... , ..... ••·;•;; I!
. .... i!,1,•. 88405 : /tf;, 'tt°;••.{fCENS'f.9·��,/l{.s ........ �:"" ., \\�ONA;,_
•-• ft' h1;1 "j% 1 z:o�
ELECTRICAL
ANTHONY MARSH, P.E.
Facilities Planning & Management Support Services Division, TxDOT 6230 East Stassney Lane Austin, TX 78744 Phone: (512) 431-5285 E-mail: anthony.marsh@TxDOT.gov
COPYRIGHT@ 2024 TEXAS DEPTARTMENT OF TRANSPORTATION
r
UJ
0::
a..
z r z
UJ
0::
z r r Cl)
_J
UJ
::J
LL
_J
LL
UJ
I
"<:f' z N I
<( O')
LO
z 00
UJ
I r "<:f' z . .
- a:::
<( w co r =>
0::
z
<( I-
I w _J -, <( 0 a:::
0 a.
w st ctj , c3
[il D i ui ai
LL
D
D
D c3
REFER TO SIT�OR LOCATION 0 0
@ t 0 }!
0 0 13
TYP.
2,000 GAL.
DIESEL
FUEL STATION PLAN
SCALE: 1/4" = 1'-0"
REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION AND ORIENTATION
WARNING: TANKS ARE SHOWN WITH DIFFERENT SIZE TANKS IN ORDER TO SHOW
ACCESSORIES WITH ONE ELEVATION ON BOTH TANKS THIS ELEVATION IS NOT TO SCALE
4,000 GAL.
DIESEL
COMBUSTIBLE
FUEL STATION ELEVATIONS
SCALE: NOT TO SCALE
NO
SMOKING
2,000 GAL.
UNLEADED
FLAMABLE n::11 =::n• I
D
,,-t-K 9
FUEL STATION NOTES
1. CONTRACTOR SHALL BE TCEQ CERTIFIED FOR UNDERGROUND TANK INSTALLATIONS AND
REMOVALS, AND CERTIFIED BY THE TANK MANAGEMENT SYSTEM MANUFACTURER. CONTRACTOR
SHALL PROVIDE CERTIFICATIONS WITH SUBMITTALS. FUEL SYSTEM PROVIDER SHALL PROVIDE
SPECIFICATION SECTION 11 1 0 00 - FUEL DISPENSING SYSTEM IS PART OF THE ELECTRICAL
CONTRACTORS SCOPE OF WORK.
2. NOTE THAT CONSTRUCTION DRAWINGS ARE DIAGRAMMATIC BY THEIR NATURE, AND ARE NOT
INTENDED TO SHOW EVERY CONNECTION IN DETAIL OR EVERY VENT PIPE, TANK PENETRATION
OR DEVICE IN ITS EXACT LOCATION. FEATURES AND COMPONENTS NOT SHOWN ARE SUBJECT
TO THE REQUIREMENTS OF STANDARDS REFERENCED ELSEWHERE IN THE CONSTRUCTION
DOCUMENTS. THE CONTRACTOR SHALL COORDINATE THE VARIOUS TRADES IN ORDER TO AVOID
INTERFERENCE BETWEEN DEVICES IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE A
COMPLETE WORKING SYSTEM WHICH SHALL COMPLY WITH NFPA 30, NFPA 30A, AND NFPA 70,
AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY, (TCEQ) FOR ABOVEGROUND STORAGE
TANKS. IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY TCEQ OF INTENT TO CONSTRUCT
AND OBTAIN REGISTRATION FROM TCEQ. CONTRACTOR SHALL COMPLY WITH TCEQ, EPA AND
NFPA REQUIREMENTS.
3. CONTRACTOR SHALL PROVIDE A COMPLETE AND ALL INCLUSIVE SET OF ENGINEERED AND
SEALED FUEL STATION SHOP DRAWINGS FOR TxDOT REVIEW PRIOR TO START OF
CONSTRUCTION AND INSTALLATION.
4. CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION
REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL AND PROVIDE A FULLY
FUNCTIONAL SYSTEM INCLUDING ALL THE NECESSARY FITTINGS AND HARDWARE SENSORS,
PROBES, TANK LEVEL MONITORING AND LEAK SENSING SYSTEM, RISERS, RISER CAPS AND
ATTACHMENTS FOR A COMPLETE FUNCTIONING SYSTEM.
5. ALL PIPING SHALL BE BLACK PIPE MEETING ASTM A-1 06 STANDARDS. CONTRACTOR SHALL
PAINT ALL PIPING WITH A RUST PROHIBITIVE ENAMEL. THE COLOR SHALL BE WHITE.
6. CONTRACTOR SHALL REGISTER AND PROVIDE CONSTRUCTION NOTIFICATION TO TCEQ FOR
ABOVEGROUND FUEL STORAGE TANKS. PROVIDE A PROOF OF REGISTER AND NOTIFICATION OF
CONSTRUCTION TO TXDOT.
7. PROGRAM NEW TANK MANAGEMENT SYSTEM TO COMMUNICATE WITH OWNER PROVIDED FUEL
MANAGEMENT SYSTEM TO SPEAK/ COMMUNICATE VEEDER-ROOT PROVIDE AND SET UP
RECONCILIATION WITH THE TMS AND FMS SYSTEM.
KEYED NOTE "O"
1. REINSTALL OWNER PROVIDED UL-2085 2,000 GALLON DIESEL ABOVEGROUND
STORAGE TANKS IN EXISTING LOCATION. INSTALLATION TO INCLUDE COMPLETE
REFURBISHING OF TANK INCLUDING PROPERLY CLEANING, INSPECTING, LEAK
TESTING AND PREPARING INTERIOR FOR REUSE. CLEANING, SANDING AND
RE-PAINTING OF EXTERIOR AND REAPPLYING REQUIRED PLACARDS AND
SIGNAGE. CONFIRM THAT TANKS HAVE ALL REQUIRED PORTS AND NIPPLES TO
ACCOMODATE BELOW INSTALLED EQUIPMENT. NOTIFY TxDOT IMMEDIATELY OF
ANY TANK ISSUES.
2. NOT USED
3. PROVIDE SIGNAGE ON TANKS VISIBLE FROM 100FT TO READ THE FOLLOWING,
" DIESEL" , "NO SMOKING" , "COMBUSTIBLE", 2,000 GALLONS ON ALL FOUR
SIDES.
4. NOT USED
5. RE-INSTALL EXISTING SUBMERSIBLE PUMP. WITH STAINLESS UL LISTED
FLEXIBLE CONNECTION.
6. NOT USED
7. PROVIDE A 2" SOLENOID VALVE, 208/240V WITH LINE PRESSURE RELIEF
MORRISON 710 SERIES. PROVIDE POWER FROM DISPENSER.
8. NOT USED
9. REINSTALL OWNER PROVIDED DIESEL MECHANICAL REMOTE DISPENSERS. IF
EQUIPPED WITH INTERNAL SPIN ON FILTER PROVIDE BLANK FILTER.
10. NOT USED
11. NOT USED
12. PROVIDE A PARTICULATE SPIN-OFF FILTER ON EACH REMOTE DISPENSER.
13. ALL PIPING, JOINTS, UNIONS AND FITTINGS SHALL BE 2" BLACK PIPE
MEETING ASTM A-106 STANDARDS WITH CLASS 300 FITTINGS. SUPPORT ALL
PIPING WITH GALVANIZED STEEL CHANNEL STRUT.
14. PROVIDE TANK LEVEL RIGID MONITOR PROBE PER OPW INTEGRATED TANK
MONITORING SYSTEM SCHEDULE.
15. PROVIDE EXTERNAL LEAK SENSOR PER OPW INTEGRATED TANK MONITORING
SYSTEM SCHEDULE IN 2" MONITORING TUBE.
16. PROVIDE 6" PRIMARY EMERGENCY VENT.
17. PROVIDE 2" MECHANICAL SHUT OFF VALVE SET AT 95%, OPW 61FSTOP-1000
ANODIZED COMPLETE WITH OPW61 FT DROP TUBE TO PROVIDE SUBMERGED
FILLING IN 4" NIPPLE. PROVIDE TANK INLET SPOUT ADAPTER WITH CROSSBAR
OPW #633AST-2061 AND CAM LOCK COUPLER OPW #633B-0150. PROVIDE
2" FLANGED CONNECTION AT VALVE IN THE VERTICAL PLANE. TRANSITION TO
3" PIPE AT REMOTE FILL BOX FOR 3" POPPETED KAMVALOK ADAPTORS.
18. NOT USED
19. NOT USED
20. REMOVE EXISTING CLOCK GAUGES AND ALARM BUTTON AND REPLACE WITH
NEW CLOCK GAUGE OPW 200TG WITH PROP TUBE INSTALLED IN 2" NIPPLE.
21. INSPECT AND CONFIRM EXISTING 2" VENT CAP AND RISER ARE CORRECTLY
INSTALLED. VENT SHALL TERMINATE AT LEAST 12' ABOVE FINISHED FLOOR
AND AT LEAST 5' ABOVE NEAREST STRUCTURE.
22. PROVIDE OPW#83-0022 (QUICK-RELEASE) FILL CAP WITH TANK MEASURING
STICK IN 2" NIPPLE.
23. NOT USED
24. PROVIDE AND INSTALL 4FT A.F.F. RACK MOUNTED EXTERNAL AUDIBLE /
VISIBLE ALARM BY OPW. INTEGRATED TANK LEVEL MONITORING AND LEAK
SENSING SYSTEM SHALL TRIGGER THE REMOTE ALARM TO SEND AN
AUDIBLE/VISIBLE ALARM WHEN A TANK REACHED THE 90% STORAGE
CAPACITY AND/OR UPON LEAK DETECTION. REFER TO SITE PLAN FOR
LOCATION.
25. PROVIDE A REMOTE FILL ABOVE GROUND STORAGE TANK SPILL CONTAINER
OPW #6-211-R-30-2-B3-LD. PROVIDE TWO POPPETED KAMVALOK
ADAPTORS AND ONE SPARE CONTAINING AN INTERNAL VITON SPRING LOADED
VALVE ASSEMBLY OPW#1612AN-0300. PROVIDE TWO POPPETED KAMVALOK
VITON COUPLERS AND ONE SPARE OPW#1712D-1095. PROVIDE TWO DUST
PLUGS AND ONE SPARE OPW#634A-0180. PROVIDE TWO LOCKABLE DUST
PLUGS AND ONE SPARE MORRISON BROS 800DC-A0600-1 C.
26. INSTALL OWNER PROVIDED ASSET WORKS FUEL MANAGEMENT SYSTEM PER
MANUFACTURER'S INSTALLATION REQUIREMENTS. CORDINATE AND CONTACT
ASSET WORKS FOR FURTHER INSTRUCTIONS. PROVIDE AND INSTALL
ADDITIONAL RELAY AND PULSER TO ACCOMODATE COMMUNICATION OF SECOND
HOSE WITH ASSET WORKS SYSTEM. ALSO PROVIDE AND INSTALL POWER
SURGE SUPPRESSOR BY INTEGRATED POWER SYSTEMS SS1 -ST AND DATA
LINE SURGE SUPPRESSOR BY DITEK DTK-MRJETHS IN PEDESTAL IF NOT
ALREADY PRESENT. COORDINATE PROGRAMMING WITH NORN CODDINGTON OF
TxDOT @ (512) 467-3883.
27. NOT USED
28. PROVIDE 2" CHECK VALVE AND 2" LOCKABLE BALL VALVE IN FUEL LINES
BEFORE ENTERING REMOTE FILL BOX.
FUEL STATION PLAN, SCHEDULE & ELEVATIONS
0::
a..
z
0- I-z w 0::
z
0- I-en
.....J w
LL
I
LL
I-z
::E
I- 0::
I .....J
Texas epanment ransponation
COPYRIGHT @2024
C'\I C'\I 0 """" 0)
0 I'--
- I
Cl)
I- z 0::
I- => I-o en <l'.'. (.) - I �o _J
<l'.'. :5 0 0 _J .....J
<l'.'. .....J - I'--o- I 0::
Cl)
0)
C'\I
ISSUED: 12-18--2023
DRAWN BY: KCR
CHECKED BY:
REVISIONS:
FS2.1
19201
,l-z f-w
THIS DRAWING CREATED FOR PRODUCTION ON 22'x34" SHEET SIZE. DO NOT SCALE PRINTS.
File details come from the government source that posted it. Updated .