RFC 041859-24-01 Fuel Station Renovation, Dalhart MNT Facility
Solicitation number
041859-24-01
Issued by
Texas

About this file

This document appears to be a set of plans related to RFP 041859-24-01 for a Fuel Station Renovation at the Dalhart MNT Facility in the state of Texas. The project involves renovations to a fuel station facility. No additional details on the scope of the renovation work or projected quantities are provided. The response due date, site visit information, and award date are not included in the document. The contract term and any renewal options are also not specified.

The pricing terms, set asides, incumbent contractor, current environment, funding requirements and sources, and other salient details are not disclosed in this document. The file appears to contain only the plans and does not provide the full solicitation information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

..: a. <t

"O "

(L O'>

"O .... N 0 N

� w :r:

Vll QC w ei � 0 c5 / z (/) 0

C "

QC

VJ

:, u..

I- I ... N I m LO

Q'.) - I ...

j N 0 N Q'.) ... 0 d

J w :::,u..

/ m- 0 m... 0 >-I z

� <t :r:

_J <t 0 j 0

I 0

/ en "" t:'. 0 a.a. :, /en a.

e z / :r:

I 0

0 0

0 X

LL

PROJECT L

NORTH

VICINITY MAP

DALLUM COUNTY, TX

GENERAL NOTES

1. WORK SHALL CONFORM TO THE CONSTRUCTION DOCUMENTS & ALL

APPLICABLE BUILDING CODES {INCLUDING FEDERAL & STATE CODES.

ORDINANCES, REGULATIONS, ETC.) CONSTRUCTION DOCUMENTS

INCLUDE CIVIL, LANDSCAPE, ARCHITECTURAL, STRUCTURAL, MEP

DRAWINGS & SPECIFICATIONS PLUS ANY ADDENDA TO THE

AFOREMENTIONED.

2. CONSTRUCTION DOCUMENTS ARE INTENDED TO INCLUDE ITEMS

NECESSARY TO CONVEY DESIGN INTENT OF THE WORK.

MANUFACTURERS' INSTRUCTIONS SHALL BE CONSIDERED AS PART OF

THE SPECIFICATIONS WHETHER INCLUDED OR NOT IN THE

SPECIFICATION MANUAL . THE TECHNICAL COMPETENCY OF THE

CONTRACTOR & SUBCONTRACTOR IS REASONABLY INERRABLE AS

BEING NECESSARY TO PRODUCE THE INTENDED RESULTS.

3. PERIODIC SITE VISITS BY OWNER'S REPRESENTATIVE SHALL NOT BE

CONSTRUED AS SUPERVISION OF MEANS, METHODS, TECHNIQUES,

SEQUENCES OR PROCEDURES FOR CONSTRUCTION, NOR IMPLY

RESPONSIBILITY FOR PROVIDING A SAFE PLACE FOR PERFORMANCE

OF WORK BY CONTRACTOR OR CONTRACTOR'S EMPLOYEES, OR

EMPLOYEES OF SUPPLIERS, OR FOR ACCESS, VISITS, USE, WORK,

TRAVEL, OR OCCUPANCY BY ANY PERSON.

DALHART MAINTENANCE FACILITY

FUEL STATION

RENOVATION PROJECT

SCOPE OF WORK:

BUILDING CODES

INTERNATIONAL BUILDING CODE IBC - 2021

AMERICANS W/ DISABILITIES ACT ADAAG -2010

TEXAS ACCESSIBILITY STANDARDS TAS-2012

INTERNATIONAL ENERGY CONSERVATION CODE IECC - 2018

INTERNATIONAL MECHANICAL CODE IMC - 2021

INTERNATIONAL PLUMBING CODE IPC - 2021

NATIONAL ELECTRIC CODE NEC-2023

NATIONAL FIRE CODE NFPA 1 - 2021

NATIONAL LIFE SAFETY CODE NFPA 101 - 2021

NATIONAL FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE NFPA 30 - 2021

NATIONAL CODE FOR MOTOR FUEL DISPENSING FACILITIES AND REPAIR GARAGES NFPA 30A-2021 TxDOT STANDARD SPECS FOR CONSTRUCTION .................. HIGHWAYS, STREETS AND BRIDGES -2014

THIS PROJECT INCLUDES RENOVATION OF AN EXISTING FUEL STATION BY UTILIZING EXISTING ELECTRICAL INFRASTRUCTURE AND BRING THE

FUEL STATION UP TO COMPLETE OPERATION.

I Texas Department of Transportation

Support Services Division I Facilities Planning & Management

4. CONTRACTOR SHALL:

6230 Stassney Lane Austin, Texas 78744

VERIFY DIMENSIONS & FIELD CONDITIONS BEFORE PROCEEDING.

NOTIFY ARCHITECT OF FIELD CONDITIONS REQUIRING DEVIATIONS

FROM CONSTRUCTION DOCUMENTS BEFORE THE CONSTRUCTION

OF ANY MODIFICATION.

PROVIDE ADEQUATE BRACING & SHORING AS NECESSARY UNTIL

PERMANENT SUPPORTS & STIFFENERS ARE INSTALLED.

IMMEDIATELY REPAIR OR REPLACE DAMAGED OR DEFECTIVE

WORK TO THE APPROVAL OF (AND AT NO ADDITIONAL COST TO)

THE OWNER

NOTIFY ARCHITECT & APPROPRIATE INSPECTORS AT CRITICAL

CONSTRUCTION MILESTONES IN ORDER TO OBTAIN NECESSARY

APPROVALS & INSPECTIONS PRIOR TO COMMENCEMENT OF

SUBSEQUENT WORK.

TAKE REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND

PROVIDE REASONABLE PROTECTION TO PREVENT DAMAGE,

INJURY OR LOSS TO:

a) EMPLOYEES & ALL OTHER AFFECTED PERSONS

b) ALL WORK, MATERIALS & EQUIPMENT

c) OTHER PROPERTY AT SITE OR ADJACENT THERETO.

UPON COMPLETION OF THE WORK, REMOVE MATERIALS, TOOLS &

EQUIPMENT AND LEAVE SITE IN A CONDITION ACCEPTABLE TO

OWNER.

Project Manager: CHRISTOPHER BECK

CONSTRUCTION PROJECT MANAGER

0(806) 224-6737 CHRISTOPHER.BECK@TxDOT.gov

FUEL STATION

PROJECT:

SITE# 049019

12190 US 87N

DALHART, TX 79022

AMARILLO DISTRICT (04)

PROJECT NUMBER: 04-1859-24-01

INDEX OF DRAWINGS

FS2.1 FUEL STATION PLAN, SCHEDULE AND ELEVATIONS

ELECTRICAL

EF1 .1 ELECTRICAL SITE PLAN

EF2.1 ELECTRICAL POWER PLAN, SPECIAL SYSTEMS & SCHEDULE

EF3.1 CLASS 1, DIVISION 1 & 2 PLAN & ELEVATIONS

EF4.1 ELECTRICAL PANELBOARD SCHEDULES & LEGEND

\''\� ..•. !-.-t"/ ,, c, .•• � ·• . .so ,, I. • : ..... : .. �.ll ;.:.'!',..: ......... •y···w·····M· ARSH " ANTHq� ....... , ..... ••·;•;; I!

. .... i!,1,•. 88405 : /tf;, 'tt°;••.{fCENS'f.9·��,/l{.s ........ �:"" ., \\�ONA;,_

•-• ft' h1;1 "j% 1 z:o�

ELECTRICAL

ANTHONY MARSH, P.E.

Facilities Planning & Management Support Services Division, TxDOT 6230 East Stassney Lane Austin, TX 78744 Phone: (512) 431-5285 E-mail: anthony.marsh@TxDOT.gov

COPYRIGHT@ 2024 TEXAS DEPTARTMENT OF TRANSPORTATION

r

UJ

0::

a..

z r z

UJ

0::

z r r Cl)

_J

UJ

::J

LL

_J

LL

UJ

I

"<:f' z N I

<( O')

LO

z 00

UJ

I r "<:f' z . .

- a:::

<( w co r =>

0::

z

<( I-

I w _J -, <( 0 a:::

0 a.

w st ctj , c3

[il D i ui ai

LL

D

D

D c3

REFER TO SIT�OR LOCATION 0 0

@ t 0 }!

0 0 13

TYP.

2,000 GAL.

DIESEL

FUEL STATION PLAN

SCALE: 1/4" = 1'-0"

REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION AND ORIENTATION

WARNING: TANKS ARE SHOWN WITH DIFFERENT SIZE TANKS IN ORDER TO SHOW

ACCESSORIES WITH ONE ELEVATION ON BOTH TANKS THIS ELEVATION IS NOT TO SCALE

4,000 GAL.

DIESEL

COMBUSTIBLE

FUEL STATION ELEVATIONS

SCALE: NOT TO SCALE

NO

SMOKING

2,000 GAL.

UNLEADED

FLAMABLE n::11 =::n• I

D

,,-t-K 9

FUEL STATION NOTES

1. CONTRACTOR SHALL BE TCEQ CERTIFIED FOR UNDERGROUND TANK INSTALLATIONS AND

REMOVALS, AND CERTIFIED BY THE TANK MANAGEMENT SYSTEM MANUFACTURER. CONTRACTOR

SHALL PROVIDE CERTIFICATIONS WITH SUBMITTALS. FUEL SYSTEM PROVIDER SHALL PROVIDE

SPECIFICATION SECTION 11 1 0 00 - FUEL DISPENSING SYSTEM IS PART OF THE ELECTRICAL

CONTRACTORS SCOPE OF WORK.

2. NOTE THAT CONSTRUCTION DRAWINGS ARE DIAGRAMMATIC BY THEIR NATURE, AND ARE NOT

INTENDED TO SHOW EVERY CONNECTION IN DETAIL OR EVERY VENT PIPE, TANK PENETRATION

OR DEVICE IN ITS EXACT LOCATION. FEATURES AND COMPONENTS NOT SHOWN ARE SUBJECT

TO THE REQUIREMENTS OF STANDARDS REFERENCED ELSEWHERE IN THE CONSTRUCTION

DOCUMENTS. THE CONTRACTOR SHALL COORDINATE THE VARIOUS TRADES IN ORDER TO AVOID

INTERFERENCE BETWEEN DEVICES IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE A

COMPLETE WORKING SYSTEM WHICH SHALL COMPLY WITH NFPA 30, NFPA 30A, AND NFPA 70,

AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY, (TCEQ) FOR ABOVEGROUND STORAGE

TANKS. IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY TCEQ OF INTENT TO CONSTRUCT

AND OBTAIN REGISTRATION FROM TCEQ. CONTRACTOR SHALL COMPLY WITH TCEQ, EPA AND

NFPA REQUIREMENTS.

3. CONTRACTOR SHALL PROVIDE A COMPLETE AND ALL INCLUSIVE SET OF ENGINEERED AND

SEALED FUEL STATION SHOP DRAWINGS FOR TxDOT REVIEW PRIOR TO START OF

CONSTRUCTION AND INSTALLATION.

4. CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION

REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL AND PROVIDE A FULLY

FUNCTIONAL SYSTEM INCLUDING ALL THE NECESSARY FITTINGS AND HARDWARE SENSORS,

PROBES, TANK LEVEL MONITORING AND LEAK SENSING SYSTEM, RISERS, RISER CAPS AND

ATTACHMENTS FOR A COMPLETE FUNCTIONING SYSTEM.

5. ALL PIPING SHALL BE BLACK PIPE MEETING ASTM A-1 06 STANDARDS. CONTRACTOR SHALL

PAINT ALL PIPING WITH A RUST PROHIBITIVE ENAMEL. THE COLOR SHALL BE WHITE.

6. CONTRACTOR SHALL REGISTER AND PROVIDE CONSTRUCTION NOTIFICATION TO TCEQ FOR

ABOVEGROUND FUEL STORAGE TANKS. PROVIDE A PROOF OF REGISTER AND NOTIFICATION OF

CONSTRUCTION TO TXDOT.

7. PROGRAM NEW TANK MANAGEMENT SYSTEM TO COMMUNICATE WITH OWNER PROVIDED FUEL

MANAGEMENT SYSTEM TO SPEAK/ COMMUNICATE VEEDER-ROOT PROVIDE AND SET UP

RECONCILIATION WITH THE TMS AND FMS SYSTEM.

KEYED NOTE "O"

1. REINSTALL OWNER PROVIDED UL-2085 2,000 GALLON DIESEL ABOVEGROUND

STORAGE TANKS IN EXISTING LOCATION. INSTALLATION TO INCLUDE COMPLETE

REFURBISHING OF TANK INCLUDING PROPERLY CLEANING, INSPECTING, LEAK

TESTING AND PREPARING INTERIOR FOR REUSE. CLEANING, SANDING AND

RE-PAINTING OF EXTERIOR AND REAPPLYING REQUIRED PLACARDS AND

SIGNAGE. CONFIRM THAT TANKS HAVE ALL REQUIRED PORTS AND NIPPLES TO

ACCOMODATE BELOW INSTALLED EQUIPMENT. NOTIFY TxDOT IMMEDIATELY OF

ANY TANK ISSUES.

2. NOT USED

3. PROVIDE SIGNAGE ON TANKS VISIBLE FROM 100FT TO READ THE FOLLOWING,

" DIESEL" , "NO SMOKING" , "COMBUSTIBLE", 2,000 GALLONS ON ALL FOUR

SIDES.

4. NOT USED

5. RE-INSTALL EXISTING SUBMERSIBLE PUMP. WITH STAINLESS UL LISTED

FLEXIBLE CONNECTION.

6. NOT USED

7. PROVIDE A 2" SOLENOID VALVE, 208/240V WITH LINE PRESSURE RELIEF

MORRISON 710 SERIES. PROVIDE POWER FROM DISPENSER.

8. NOT USED

9. REINSTALL OWNER PROVIDED DIESEL MECHANICAL REMOTE DISPENSERS. IF

EQUIPPED WITH INTERNAL SPIN ON FILTER PROVIDE BLANK FILTER.

10. NOT USED

11. NOT USED

12. PROVIDE A PARTICULATE SPIN-OFF FILTER ON EACH REMOTE DISPENSER.

13. ALL PIPING, JOINTS, UNIONS AND FITTINGS SHALL BE 2" BLACK PIPE

MEETING ASTM A-106 STANDARDS WITH CLASS 300 FITTINGS. SUPPORT ALL

PIPING WITH GALVANIZED STEEL CHANNEL STRUT.

14. PROVIDE TANK LEVEL RIGID MONITOR PROBE PER OPW INTEGRATED TANK

MONITORING SYSTEM SCHEDULE.

15. PROVIDE EXTERNAL LEAK SENSOR PER OPW INTEGRATED TANK MONITORING

SYSTEM SCHEDULE IN 2" MONITORING TUBE.

16. PROVIDE 6" PRIMARY EMERGENCY VENT.

17. PROVIDE 2" MECHANICAL SHUT OFF VALVE SET AT 95%, OPW 61FSTOP-1000

ANODIZED COMPLETE WITH OPW61 FT DROP TUBE TO PROVIDE SUBMERGED

FILLING IN 4" NIPPLE. PROVIDE TANK INLET SPOUT ADAPTER WITH CROSSBAR

OPW #633AST-2061 AND CAM LOCK COUPLER OPW #633B-0150. PROVIDE

2" FLANGED CONNECTION AT VALVE IN THE VERTICAL PLANE. TRANSITION TO

3" PIPE AT REMOTE FILL BOX FOR 3" POPPETED KAMVALOK ADAPTORS.

18. NOT USED

19. NOT USED

20. REMOVE EXISTING CLOCK GAUGES AND ALARM BUTTON AND REPLACE WITH

NEW CLOCK GAUGE OPW 200TG WITH PROP TUBE INSTALLED IN 2" NIPPLE.

21. INSPECT AND CONFIRM EXISTING 2" VENT CAP AND RISER ARE CORRECTLY

INSTALLED. VENT SHALL TERMINATE AT LEAST 12' ABOVE FINISHED FLOOR

AND AT LEAST 5' ABOVE NEAREST STRUCTURE.

22. PROVIDE OPW#83-0022 (QUICK-RELEASE) FILL CAP WITH TANK MEASURING

STICK IN 2" NIPPLE.

23. NOT USED

24. PROVIDE AND INSTALL 4FT A.F.F. RACK MOUNTED EXTERNAL AUDIBLE /

VISIBLE ALARM BY OPW. INTEGRATED TANK LEVEL MONITORING AND LEAK

SENSING SYSTEM SHALL TRIGGER THE REMOTE ALARM TO SEND AN

AUDIBLE/VISIBLE ALARM WHEN A TANK REACHED THE 90% STORAGE

CAPACITY AND/OR UPON LEAK DETECTION. REFER TO SITE PLAN FOR

LOCATION.

25. PROVIDE A REMOTE FILL ABOVE GROUND STORAGE TANK SPILL CONTAINER

OPW #6-211-R-30-2-B3-LD. PROVIDE TWO POPPETED KAMVALOK

ADAPTORS AND ONE SPARE CONTAINING AN INTERNAL VITON SPRING LOADED

VALVE ASSEMBLY OPW#1612AN-0300. PROVIDE TWO POPPETED KAMVALOK

VITON COUPLERS AND ONE SPARE OPW#1712D-1095. PROVIDE TWO DUST

PLUGS AND ONE SPARE OPW#634A-0180. PROVIDE TWO LOCKABLE DUST

PLUGS AND ONE SPARE MORRISON BROS 800DC-A0600-1 C.

26. INSTALL OWNER PROVIDED ASSET WORKS FUEL MANAGEMENT SYSTEM PER

MANUFACTURER'S INSTALLATION REQUIREMENTS. CORDINATE AND CONTACT

ASSET WORKS FOR FURTHER INSTRUCTIONS. PROVIDE AND INSTALL

ADDITIONAL RELAY AND PULSER TO ACCOMODATE COMMUNICATION OF SECOND

HOSE WITH ASSET WORKS SYSTEM. ALSO PROVIDE AND INSTALL POWER

SURGE SUPPRESSOR BY INTEGRATED POWER SYSTEMS SS1 -ST AND DATA

LINE SURGE SUPPRESSOR BY DITEK DTK-MRJETHS IN PEDESTAL IF NOT

ALREADY PRESENT. COORDINATE PROGRAMMING WITH NORN CODDINGTON OF

TxDOT @ (512) 467-3883.

27. NOT USED

28. PROVIDE 2" CHECK VALVE AND 2" LOCKABLE BALL VALVE IN FUEL LINES

BEFORE ENTERING REMOTE FILL BOX.

FUEL STATION PLAN, SCHEDULE & ELEVATIONS

0::

a..

z

0- I-z w 0::

z

0- I-en

.....J w

LL

I

LL

I-z

::E

I- 0::

I .....J

Texas epanment ransponation

COPYRIGHT @2024

C'\I C'\I 0 """" 0)

0 I'--

- I

Cl)

I- z 0::

I- => I-o en <l'.'. (.) - I �o _J

<l'.'. :5 0 0 _J .....J

<l'.'. .....J - I'--o- I 0::

Cl)

0)

C'\I

ISSUED: 12-18--2023

DRAWN BY: KCR

CHECKED BY:

REVISIONS:

FS2.1

19201

,l-z f-w

THIS DRAWING CREATED FOR PRODUCTION ON 22'x34" SHEET SIZE. DO NOT SCALE PRINTS.

File details come from the government source that posted it. Updated .