ESBD_355868_1717785424198_Addendum 1 - Laredo RC & FMS.pdf

PDF 109 KB Posted

Attached to
Laredo Readiness Center (RC) Facility & Field Maintenance Shop (FMS)
Solicitation number
TMD24-CFMO-3052024
Issued by
Travis County, Webb County, Austin City, Laredo City, Texas

About this file

This document is an addendum to a solicitation issued by the Texas Military Department (TMD) for the construction of a new National Guard Readiness Center (RC) facility, Field Maintenance Shop (FMS) facility, supporting facilities, and site improvements in Laredo, Texas. The total estimated cost of this project is $45,500,000.00. The purpose of this addendum is to clarify that the General Contractor will be responsible for the performance and payment of material testing and special inspections for the project, contrary to previous information in the construction documents. General Contractors must attend one of two mandatory site visits on June 4 or June 5, 2024, and submit competitive sealed proposals by 11:30 AM on July 17, 2024, at Camp Mabry in Austin, Texas.

The solicitation is open to all qualified General Contractors, and the contract will be awarded based on the proposals received. The project is funded by the State of Texas and the jurisdictions involved, which include Travis County, Webb County, and the cities of Austin and Laredo. There are no set-aside requirements mentioned, and the incumbent contractor is not specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Texas Military Department 2200 W. 35th St. Bldg. 37

Austin, Texas 78703

ADDENDUM TO SOLICITATION

1. SOLICITATION NO.

TMD24-CFMO-3052024

Laredo RC & FMS

2. ADDENDUM NO.

3. EFFECTIVE DATE

6/7/2024

4. ISSUED BY

Texas Military Department (TMD) 2200 W. 35th Street Bldg. 37 Austin, Texas 78703

5. ACKNOWLEDGEMENT OF ADDENDUM

Per RFP Section III, 4) Addendum, b. Receipt of all addenda to this RFP shall be acknowledged by returning a signed copy of the signature page of each addendum with the proposal. In addition, the Respondent must acknowledge receipt of all addenda by writing the numerical figure of each Addendum issued by the TMD on the blank space provided in Attachment A – Contractor's Proposal Form, 3.

Addenda.

6. DESCRIPTION OF ADDENDUM

The purpose of this addendum is to update and clarify that the Plan Drawings and the Specifications state, “Contractor shall be responsible for coordinating and scheduling with the owner’s representative all materials testing and inspections as required by the contract documents. Contractor will not be responsible for the payment of these services.”

Now, the change is that the General Contractor WILL BE responsible for the performance and payment of material testing and special inspections for the project. Any information to the contrary throughout the construction documents is to be ignored. This includes any/all instances on the Plan Drawings and in the Specifications.

7. NAME AND ADDRESS OF RESPONDENT

8. NAME AND TITLE OF SIGNER

9. SIGNATURE

(Signature of Person Authorized to Sign) Date Signed

File details come from the government source that posted it. Updated .