ES7034.pdf
PDF 10 KB Posted
- Attached to
- FLU-9 Inflation Device
- Solicitation number
- FA821325R3020
About this file
The document is a federal contract clause (ES7034) detailing requirements for Rework and Repair of Nonconforming Material, dated January 2012. The clause defines two key processes: 1) Rework - completely reprocessing nonconforming material to meet contract requirements, and 2) Repair - partially reprocessing nonconforming material to make it usable while not fully meeting all specifications. The clause mandates that contractors must document and submit rework and repair procedures to the Government Quality Assurance Representative (QAR) for review and approval, including a description of the nonconformance cause and prevention actions. Additionally, the procedures must include a reinspection provision to ensure the reworked or repaired items meet reprocessing requirements, and this requirement applies to the contractor's entire supply chain, including suppliers, vendors, and subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL_FLU-9.pdf | ||
| AirSpec Information.docx | DOCX document | |
| Air Spec.pdf | ||
| SPI_015900158.pdf | ||
| ITEM DESCRIPTION.pdf | ||
| REPSHIP.docx | DOCX document | |
| ADC SOW.docx | DOCX document | |
| CADPAD Item Marking Instruction - Ver 1.6.pdf | ||
| Packaging SOW.pdf | ||
| FA821325R3020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for
Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the
Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of clause)
(ES7034)
File details come from the government source that posted it. Updated .