ES7034.pdf

PDF 10 KB Posted

Attached to
C17 FMS Arm Fire Initiators
Solicitation number
FA8213-25-R-3028
Issued by

About this file

This document is a federal contract clause (ES7034) defining procedures for rework and repair of nonconforming material, dated January 2012. The clause provides detailed definitions and requirements for handling materials that do not meet contract specifications, distinguishing between "rework" (complete reprocessing to meet all requirements) and "repair" (partial correction to make material usable). Key procedural requirements include: contractors must document and submit rework and repair procedures to government representatives for review and approval, provide explanations for nonconformances, and include reinspection provisions. The clause applies across the entire supply chain, mandating that contractors and their suppliers, vendors, and subcontractors adhere to these quality control standards.

View the file

Other files

File Type Posted
ADC_SOW_Jan_2018.pdf PDF
ItemMarkingInstruction.pdf PDF
COMBINED_JFQRs.pdf PDF
Combined_Item_Descriptions.pdf PDF
CDRLs.pdf PDF
Statement_of_Objectives_SOO.pdf PDF
SPI_F01-382-0650.pdf PDF
FA821325R3028.pdf PDF
AIR_SPEC.pdf PDF
Section_M_CADPAD.pdf PDF
REPSHIP.pdf PDF
PackagingSOW.pdf PDF
Section_L_CADPAD.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)