ES7034.pdf

PDF 10 KB Posted

Attached to
Remanufacture of B1 & F15 Parts
Solicitation number
FA8213-25-R-3025
Issued by

About this file

The document is a federal contract clause (ES7034) titled "Rework and Repair of Nonconforming Material" dated January 2012. The clause defines and provides detailed procedures for rework and repair of nonconforming materials in a federal contract context. Key requirements include:

The clause distinguishes between "rework" (completely reprocessing material to meet contract specifications) and "repair" (reprocessing material to reduce nonconformance but not fully eliminate it). Contractors must document and submit rework and repair procedures to the Government Quality Assurance Representative (QAR) for review and approval. Submissions must include the cause of nonconformance and prevention actions. The procedures must also include a reinspection provision that takes precedence over technical data package requirements. This requirement applies to the contractor and their entire supply chain, including suppliers, vendors, and subcontractors.

View the file

Other files

File Type Posted
SOWAppendix.pdf PDF
PackagingSOW.pdf PDF
F01-237-4417_SPI.pdf PDF
ItemDescriptions_Combined.pdf PDF
JFQR_Mode_Selector.pdf PDF
CDRLs.pdf PDF
FA821325R3025.pdf PDF
REPSHIP.pdf PDF
ADC_SOW.pdf PDF
ItemMarkingInstruction.pdf PDF
F01-271-5483_SPI.pdf PDF
F01-455-1511_SPI.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)

(ES7034)

File details come from the government source that posted it. Updated .