ES7034.pdf

PDF 10 KB Posted

Attached to
C17 REMAN (Arm/Fire Initiators) Federal contract opportunity
Solicitation number
FA8213-25-R-3024
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is a federal contract clause (ES7034) detailing procedures for rework and repair of nonconforming material. The clause defines two key processes: rework, which involves reprocessing material to fully conform to contract requirements, and repair, which brings nonconforming material into a usable condition without completely eliminating all nonconformances. The document outlines specific requirements for contractors, including:

Contractors must document and submit rework and repair procedures to government representatives for review and approval. Submissions must include a description of the cause of nonconformances and prevention actions. All procedures must include a reinspection provision that takes precedence over technical data package requirements. The clause is a supply chain requirement that applies to contractors, suppliers, vendors, and subcontractors, ensuring quality control and compliance throughout the production process.

View the file

Other files for this federal contract opportunity

Other files attached to C17 REMAN (Arm/Fire Initiators), newest first.
File Type Posted
Section_M_CADPAD.pdf PDF
F013820650_SPI.pdf PDF
JFQR_0670.pdf PDF
SOW_Packaging.pdf PDF
ADC_SOW.pdf PDF
FA821325R3024.pdf PDF
REPSHIP.pdf PDF
Item_Marking_Instructions.pdf PDF
SOW.pdf PDF
COMBINED_ITEM_DESCRIPTIONS.pdf PDF
Statement_of_Objectives_SOO.pdf PDF
Section_L_CADPAD.pdf PDF
CDRLs.pdf PDF
JFQR_1521.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)

(ES7034)

File details come from the government source that posted it. Updated .