Erosion_and_Sediment_Control_Template.pdf
PDF 141 KB Posted
- Attached to
- Mallard Avenue Bridge #1339
- Solicitation number
- CT223-17
- Issued by
- Boise County, Idaho
About this file
This document is a Site Specific Erosion and Sediment Control (ESC) Plan template prepared for the Ada County Highway District (ACHD), designed to comply with Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) permit requirements. The plan provides a comprehensive framework for managing construction-related environmental impacts, outlining specific procedures for controlling erosion and sediment during construction activities. It includes sections for documenting project details such as areas disturbed, construction schedule, potential pollution sources, and pollution control measures. The template requires contractors to complete site-specific information and implements detailed inspection and maintenance procedures, including mandatory weekly site inspections and post-storm event assessments.
The ESC Plan emphasizes spill prevention, material storage, and waste management strategies, requiring contractors to maintain on-site clean-up materials, safety data sheets, and a material inventory. Specific requirements include sweeping sidewalks and streets before forecasted rain, proper concrete washout procedures, and immediate reporting of oil and chemical spills to designated emergency contacts. The plan mandates that all erosion and sediment control measures be maintained in effective operating condition, with immediate maintenance required if best management practices (BMPs) are not functioning effectively. The document also specifies that ACHD will provide a general location map and site-specific plan view map with detailed site characteristics and BMP locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mallard_Avenue_Bridge_#1339_(Addendum_#3_Revision).pdf | ||
| Sample_Agreement.pdf | ||
| CAD_FILES_-_FOR_VIEWING_PURPOSES_ONLY.dwg | DWG drawing | |
| Floodplain.pdf | ||
| Geotechnical_Report.pdf | ||
| Special_Provisions_-_Utility_Info.pdf | ||
| Plan_Sheets_1-9.pdf | ||
| Vicinity_Map.pdf | ||
| Bid_Bond.pdf | ||
| Environmental_Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE SPECIFIC EROSION AND SEDIMENT CONTROL PLAN
An approved Erosion and Sediment Control (ESC) Plan is required for all sites affecting the
ACHD right-of-way. The purpose of the ESC Plan is to reduce pollutants to the Maximum Extent Practicable (MEP) as required by the Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) permit issued by the U.S.
Environmental Protection Agency.
This plan will need to be completed by the contractor and approved by ACHD prior to issuance of the Temporary Highway Use Permit.
The ESC Plan shall be amended if it proves to be ineffective in significantly reducing pollutants. All amendments shall be signed, dated, and kept as attachments to the original ESC Plan.
A working copy of this ESC Plan must be kept at the construction site.
Project Name and Location:
[Insert Project Name Here]
Company Name, Address, and Phone Number:
Person Responsible and Certification Number:
Description of the Proposed Construction Activity
Area disturbed for new pavement ∼ [XXX] square yards Area disturbed for sidewalk and driveway approaches ∼ [XXX] square yards Area disturbed for curb and gutter ∼ [XXX] square yards Area disturbed for asphalt repair ∼ [XXX] square yards Area disturbed for concrete repair ∼ [XXX] square yards Area disturbed for gravel repair ∼ [XXX] square yards Area disturbed for fill and sod repair ∼ [XXX] square yards Installation and maintenance of various types of erosion and sediment control measures Approximate total area disturbed ∼ [XXX] square yards ([XXX] acres)
Schedule
The following is a general schedule guideline for implementing BMPs during construction of this project. Construction is anticipated to begin mm/dd/yyyy and end mm/dd/yyyy.
Once all permanent construction is completed, all remaining areas will be stabilized (sod repair if needed) and BMPs will be removed.
Receiving Waters (include drains, ditches, and canals):
[Insert closest water body here]
Associated Industrial Activities (Identify waste sites to which waste will be hauled.)
Potential Sources of Pollution The primary construction activities, related materials, and wastes that have the potential to pollute storm water include:
Solid wastes from curb, gutter, and asphalt demolition and removal.
Temporary on-site storage of construction materials General site litter and waste containers Port-a-pot, fuel tanks, chemical storage areas, and form oils, etc.
Erosion and sediment from exposed soil Dust from exposed soil Concrete from washout or excess
Pollution Control Measures/Best Management Practices
Sediment Controls Sidewalk, streets, and gutters will be swept before forecasted rain and at the completion of each site location.
Erosion Controls
Material Storage, Waste Disposal, Spill Prevention and Response
Spill clean-up materials, safety data sheets (SDS), and a material inventory will be maintained on site to contain and clean-up spills and prevent material discharges offsite. Refer to the SDS for the manufacture’s emergency number. Call 911 or the Idaho Communications Center (1-800-632- 8000). Report oil and chemical spills to the National Response Center: 1-800-424-8802. Spill clean-up materials kept onsite will include granular absorbent and hydrocarbon specific absorbent.
All concrete cleanout material will be collected and removed from the site. At no time will concrete washout be discharged into the street, gutter, or storm drain. Cleanout will be collected in buckets or in lined concrete washout pits.
Inspection/Maintenance Procedures The contractor or his qualified agent is required to inspect all disturbed areas and areas used for storage of materials and equipment that are exposed to precipitation. He is also required to inspect all erosion and sediment control BMPs. Inspections shall occur once every 7 calendar days and within 24 hours of the occurrence of a storm event of 0.25 inches or greater, or the occurrence of runoff from snowmelt sufficient to cause a discharge.
The following sources may be used to obtain weather forecasts:
The National Weather Service: http://www.wrh.noaa.gov/boi/ The Western Regional Climate Center http://www.wrcc.dri.edu/CURRENTOBS.html
All erosion and sediment control measures and other protective measures must be maintained in effective operating condition. If BMPs are not operating effectively, maintenance must be performed as soon as possible and before the next storm event whenever practicable to maintain the continued effectiveness of storm water controls.
The contractor or his qualified agent is required to inspect all disturbed areas and areas used for storage of materials and equipment that are exposed to precipitation. He is also required to inspect all erosion and sediment control BMPs. Inspections shall occur once every 7 calendar days and within 24 hours of the occurrence of a storm event of 0.25 inches or greater, or the occurrence of runoff from snowmelt sufficient to cause a discharge.
(Operator and/or Responsible Authority) Date
TO BE PROVIDED BY ACHD:
GENERAL LOCATION MAP
SITE SPECIFIC PLAN VIEW MAP SHOWING
North Arrow, Scale, and Date Excavation, Grade, Paved Areas, Pond Elevations, Structures, and Utilities Property Boundaries and Lot Lines All Drainage Features Location and Type of Best Management Practices Key of Symbols
STANDARD DRAWINGS/ BMPs:
DI
Material storage Spill containment Sodding