Alcan_4plex_Renovation-Drawings.pdf
PDF 85 KB Posted
- Solicitation number
- EQ10PMBA-4-17-0004
About this file
Drawings - Alcan, Alaska Border Station (LPOE) 4-Plex Remediation/Renovation
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VERTICAL PENETRATION
01009
STAIR
172.94 SqFt
VERTICAL PENETRATION
01008
STAIR
172.94 SqFt
MISSION SUPP FACIL
AAK00852
01005
STORAGE
400.48 SqFt
BLDG
01007
CORR.
549.09 SqFt
MISSION SUPP FACIL
AAK00852
01004
RESIDENCE
1005.44 SqFt
GSA OUTLEASED SPACE
AAK04242
01001
RESIDENCE
994 SqFt
MISSION SUPP FACIL
AAK00848
01003
RESIDENCE
994 SqFt
GSA OUTLEASED SPACE
AAK04242
01002
RESIDENCE
993.99 SqFt
MISSION SUPP FACIL
AAK00848
01006
STORAGE
412.76 SqFt
CONSTRUCTION
C01
CONSTRUCTION
251.03 SqFt
Vaulted Ceiling Areas Attic Roof Areas
STAIR
172.94 SqFt
VERTICAL PENETRATION
01008
STAIR
172.94 SqFt
MISSION SUPP FACIL
AAK00852
01005
STORAGE
400.48 SqFt
BLDG
01007
CORR.
549.09 SqFt
MISSION SUPP FACIL
AAK00852
01004
RESIDENCE
1005.44 SqFt
GSA OUTLEASED SPACE
AAK04242
01001
RESIDENCE
994 SqFt
MISSION SUPP FACIL
AAK00848
01003
RESIDENCE
994 SqFt
GSA OUTLEASED SPACE
AAK04242
01002
RESIDENCE
993.99 SqFt
MISSION SUPP FACIL
AAK00848
01006
STORAGE
412.76 SqFt
CONSTRUCTION
C01
CONSTRUCTION
251.03 SqFt
Exterior perimeter walls to be removed, re-insulated with spray in type insulation, drywalled, and painted
STAIR
172.94 SqFt
VERTICAL PENETRATION
01008
STAIR
172.94 SqFt
MISSION SUPP FACIL
AAK00852
01005
STORAGE
400.48 SqFt
BLDG
01007
CORR.
549.09 SqFt
MISSION SUPP FACIL
AAK00852
01004
RESIDENCE
1005.44 SqFt
GSA OUTLEASED SPACE
AAK04242
01001
RESIDENCE
994 SqFt
MISSION SUPP FACIL
AAK00848
01003
RESIDENCE
994 SqFt
GSA OUTLEASED SPACE
AAK04242
01002
RESIDENCE
993.99 SqFt
MISSION SUPP FACIL
AAK00848
01006
STORAGE
412.76 SqFt
CONSTRUCTION
C01
CONSTRUCTION
251.03 SqFt
Areas receiving carpet Areas receiving marmoleum plank Areas receiving linolium sheet
STAIR
172.94 SqFt
VERTICAL PENETRATION
01008
STAIR
172.94 SqFt
MISSION SUPP FACIL
AAK00852
01005
STORAGE
400.48 SqFt
BLDG
01007
CORR.
549.09 SqFt
MISSION SUPP FACIL
AAK00852
01004
RESIDENCE
1005.44 SqFt
GSA OUTLEASED SPACE
AAK04242
01001
RESIDENCE
994 SqFt
MISSION SUPP FACIL
AAK00848
01003
RESIDENCE
994 SqFt
GSA OUTLEASED SPACE
AAK04242
01002
RESIDENCE
993.99 SqFt
MISSION SUPP FACIL
AAK00848
01006
STORAGE
412.76 SqFt
CONSTRUCTION
C01
CONSTRUCTION
251.03 SqFt
Areas where wire molding will be removed and replaced with duplex outlets Existing light switches that control wire molding and will be rewired for overhead light control Location where new 220 and 110 outlets will be placed, where new washing machine drain line will tie in to restroom plumbing, and where new dryer exhaust will be.
File details come from the government source that posted it. Updated .