Attachment_1_Room_Data_Sheet_for_High-Low_Booth.pdf
PDF 132 KB Posted
- Solicitation number
- EQ10PCP-17-0040
About this file
Room Data Sheet For High Low Booth
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Official Use Only
The hi-low inspection booth is used to conduct primary inspections of vehicles in the Primary Inspection Area of the Port. The split level inspection booth is a pre-fabricated metal enclosure on a concrete platform with a wide-angle view and bullet resistant enclosure, typically located under the primary inspection canopy. Booth exterior walls and glazing shall be constructed to meet or exceed UL-752-95 Level 3 for bullet resistance and ASTM F1233 Class 3 Level lll for forced entry resistance. This booth type is able to service noncommercial vehicles in the at-grade portion of the booth and commercial traffic in the upper level of the booth. Northern Border: May be attached to Main Building . Standard details for the booth can be found in Appendix C. One per input (This also implies that one LPR and one truck/bus RPM will be added per lane).
2.2 PRIMARY INSPECTION - BOOTHS & CANOPIES
Sprinkler Head Type:
N/A
Door Type: SL-01 Sliding (integral with Inspection Booth)
Door Frame: HM-5 HM as included with pre-fabricated building
Exterior Windows:
Exterior Window / Door Glazing:
GL-03 Bullet Resistant Glazing, UL–752-95 Level 3 & ASTM F1233 Class 3 Level lll
Special Requirements:
C-1 Lockset and BMAS for rear door. See Appendix for prefabricated booth requirements.
Fire Special Requirements:
Portable fire extinguisher installed in accordance with the requirements in the ICC-IFC.
Fixtures and Fittings 1:
NA
Fixtures and Fittings 2:
Fixtures and FIttings 3:
Fixtures and Fittings 4:
Fixtures and Fittings 5:
Fixtures and Fittings 6:
Fixtures and Fittings 7:
Plumbing Special
Acoustic Separation:
N/A
Floor Finish: FF-14 Rubber Mat
Base: N/A
Wall Construction:
Wall-13 Insulated metal panels with steel roll frames, Level 3 bullet resistant
Wall Finish: WF-11 Prefinished Metal Panels
Ceiling Remark:
Ceiling Const. / Finish:
CF-11 Prefinished Metal Panels
Ceiling Height: 9'-0" Min
Alternate Construction:
Ceiling 5/8" gyp board
Const Special Requirements:
Slope floor of booth 1/8”/1’-0" to door. See Appendix for specific security requirements.
Supply Register: S-2: Square Ceiling Diffuser Return Register: RR-2: Return Grille Temp Summer 85° (max) Temp Winter 55° (min) Temp Control: Room: Dedicated Room Temperature control Humidity Range: N/A Special Security:
Mech Special Requirements:
Locate air intake above canopy. Ruggedized thermostat: temp only control. NB: Provide radiant floor heating, over door unit & heated floor mat.
Fixed Equipment 1:
Fixed Equipment 2:
Receptacles: R-6: Receptacle, Standard GFCI
Electrical Special
(4) duplex GFCI receptacles per position (hi and low) Provide local UPS plugin module for computer.
Lighting Fixture: L-1: Lighting Fixture, Direct/Indirect, Recessed 2x2 or 2x4, 80+ CRI Lamp
Fixture Types Optional/Special:
L-15: Lighting Fixture, Surface Mounted Task Light
Lighting Control: LC-5: Combination Wall Switch with Occupancy Sensor & Dimmer
Lighting Special Provide 50 FC at working surface. Task light shall have three settings: white/red/off.
DIV 08 - DOORS AND WINDOWS Chapter 14
ROOM OCCUPANCY
1 or 2 Officers
ROOM SIZE:
131 SF
DIV 22 - PLUMBING Chapter 17
DIV 23 - MECHANICAL Chapter 18DIV 09 - CONSTRUCTION AND FINISHES Chapter 14
DIV 10 - FIXED EQUIPMENT Chapter 14
DIV 27 - LIGHTING
DIV 26 - ELECTRICAL
Door Lockset Group:
F Deadbolt / Deadlatch
Door Hardware Cylinder:
A-1: Cylinder, keyed individually under a CBP Master
Door Hardware Group:
W Full weatherstriping
Interior Window: N/A
Other Electrical Receptacles:
Cruise
Express
Cargo
Airport
LPOE
Fixed Equipment 3:
40" high X 30" deep stainless steel counter with 2 grommet holes at high and low position
Office
Room Code:
PRI-010
Chapter 19
Chapter 19
DIV 21 - FIRE SUPPRESSION Chapter 16
[Booth #]
ROOM SIGN 10/2/2014
12:14 PM
High-Low Inspection Booth
ROOM FUNCTION
COMMON DESIGN STANDARD ROOM DATA SHEETS
WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 U.S.C.522). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized DHS official.
22 - 169
For Official Use Only
Security Special Requirements:
Number and location of cameras to be determined by CBP. Cameras and microphones shall capture full interaction of Officer and Driver.
CBP Equipment
Computer(s), RFID card reader, Telephone
CBP Equipment
OBIM equipment, document reader, black light, and fingerprint/biometric systems
CBP Equipment
POV and Cargo technology equipment
Phone Outlets: Phone 02: Double RJ-11 phone port
Data Outlets: Data 03: Quad data port
Communications Special
Intercom system required. Double phone port and quad data port per position (hi and low)
CCTV Camera: Fixed CCTV wide-angle lens camera and microphone, monitored/recorded at the CCC.
IDS: IDS included if Booth is part of building perimeter
Access Control: N/A
Duress System Duress button on Booth interior and exterior
Mech: No through-the-wall units. Roof-mounted package direct expansion (DX) or split system heat pump incorporated with booth (allow efficient switch-out if equipment fails). Provide Air blowers (cont 200 CFM) outside the booth to provide untreated positive air pressure to mitigate pathogen transmission.
Electrical: Locate Controls for lane equipment, canopy lighting and traffic control devices within Booth. Provide two 240/120V, single phase, 100A, and 24 pole panelboards with main circuit breaker. One panel board shall be located inside and one outside the Booth in a NEMA-3R box.
Protection: Provide bollards at each exposed corner of booth. Provide a 3’ high concrete vehicle barrier at the front of the booth. Provide 1 bollard to the side of the sliding door. Electrical: Controls for lane equipment.
Provide one (min) spare 2" conduit to booth for each type of conduit required.
Provide Mechoshade or similar for shading.
DIV 10 - CBP PROVIDED EQUIPMENT Chapter 14
OTHER REQUIREMENTS DIV 28 - SECURITY Chapter 21
DIV 27 - COMMUNICATIONS Chapter 20
SCHEMATIC PLAN High-Low Inspection Booth PRI-010
COMMON DESIGN STANDARD ROOM DATA SHEETS
WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 U.S.C.522). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized DHS official.
22 - 170
File details come from the government source that posted it.