The purpose of this Amendment (AA02) is to update the solicitation for the FOB Terrazzo Restoration Project. ADD GSA Response to RFIs for FOB Terrazzo Restoration Project ADD CAD drawing titled DID 1 FOB 1st Flr S Terrazo Restore (1)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_AA01__EQ10PCB2165022_3.pdf | ||
| Solicitation_Pkg_EQ10PCB2165022_FOB_Terrazzo_Restoration_3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 Federal Office Building (FOB) Terrazzo Restoraction Project
1 8 x x 1
CONTINUATION SHEET
Continue from Block 14…
EQ10PCB-2-16-5022 FOB Terrazzo Restoration Project
Modification: AA02
The purpose of this Amendment (AA02) is to update the solicitation for the FOB Terrazzo Restoration Project.
ADD: GSA Response to RFIs for FOB Terrazzo Restoration Project
ADD: CAD drawing titled, “DID 1 FOB 1st Flr S Terrazo Restore (1)”
Please acknowledge receipt of this AA02 in writing when submitting your proposal on Monday, August 15, 2016 by
4:00pm PDT.
U.S. General Services Administration
Page 1 of 1 R10 PBS/Acquisition Management Division/Northwest Service Center 915 Second Avenue, Suite 914
Seattle, Washington 98174-1009 www.gsa.gov
The following questions and clarifications are related to your submitted RFI questions to the
EQ10PCB-2-15-5022_Federal Office Building (FOB) Terrazzo Restoration Solicitation on Pre-Proposal
Conference and Site Visit on Wednesday, August 3, 2015.
Solicitation Number: EQ10PCB-2-15-5022
1. I am having trouble with blueprints online, can you send me a more detailed to scale print?
CAD drawing titled, “DID 1 FOB 1st Flr S Terrazo Restore (1)” is attached.
Scaling must be done by contractor.
2. Are there CAD drawings available?
Please see attached “DID 1 FOB 1st Flr S Terrazo Restore (1)”
3. Will the 8 th floor landing be included in the scope of work?
No, the 8 th floor will not be included.
| SF30_AA02_ EQ10PCB2165022 |
| 2_CONTINUATION SHEET_ AA02_ FOB Terrazzo Restoration |
| DID 1 FOB 1st Flr S Terrazo Restore |
| GSA Response to RFI_FOB Terrazzo Restoration |