WQ Req R2 .docx
DOCX document 21 KB Posted
- Solicitation number
- EPA1200349REV1
- Issued by
-
Environmental Protection Agency Region 1
About this file
Statemant of Work (SOW)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Table 1.docx | DOCX document | |
| Attachment 4 Reps Certs .docx | DOCX document | |
| Provision 1552.209-99.docx | DOCX document | |
| Clauses_SAP 1 .doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EPA Region 1 Acquisition Requirements For Instruments & Equipment (Rev. 2)
Item to be purchased:
Data Collection Platform with Water Quality Meters and Accessories
Overview of Requirement:
The United States Environmental Protection Agency (EPA) requires a Data Collection Platform with Water Quality Meters and Accessories to be used in Water Quality Studies. The data collection platform with water quality meters and probes is needed to conduct remote sampling with real-time data to make environmental decisions to the quality of water. The unit will be used in shallow streams throughout New England in areas were the other existing buoys cannot be deployed due to depth and security. This package consists of two water quality instruments with optical probes for dissolved oxygen, chlorophyll, blue-green algae and CDOM. The physical housing of the unit is a waterproof locking box, antenna, solar panel, battery, data collector and cable. Probes and accessories are needed for general water quality measurements including: accurate profiling of the water column: long term deployment and spot checking in the field. The data collection platform with probes and accessories will be used in 2012 on the Great Bay Survey in the Dover, New Hampshire area to track the low dissolved oxygen wedge that comes up the river during flooding tide cycles and retreats on a presumed daily basis. The data produced will be used by multiple groups in the New Hampshire Seacoast area to track real-time water quality issues that include water quality classification as well as to determine if recreational activity is acceptable. The unit may also be used on the Assabet River to monitor for a potential algae bloom as well as other water quality studies as they develop in 2012.
Requested Delivery of all items
August 31, 2012 or sooner
Quantity Required:
| Item |
| Supplies/Services |
| QTY |
| Unit Price |
| Amount |
| 1 |
| Land based data collection platform with solar panel, battery, cable, antenna, modem, waterproof secure lock box and 1 year telemetry and web hosting on USEPA server |
| 1 |
| 2 |
| Marine Water Quality Meter w/depth sensor to 200 feet |
| 2 |
| 3 |
| Optical D.O. Sensor |
| 2 |
| 4 |
| Chlorphyll a Sensor |
| 2 |
| 5 |
| Blue Green phyconcyananin Sensor |
| 2 |
| 6 |
| Color Dissolved Organic Monitor Sensor |
| 2 |
| 7 |
| PAR Sunlight sensor mounted on Meter below surface |
| 2 |
| 8 |
| Hardware and cabling for station and telemetry |
| 1 |
| 9 |
| Antifouling guards |
| 2 |
| 10 |
| Field Datalogger to download data and cailbrate |
| 2 |
| 11 |
| Operating Software |
| 2 |
| 12 |
| Conductivity Sensor |
| 2 |
| 13 |
| pH Sensor |
| 14 |
| Turbidity Sensor |
| 2 |
| 15 |
| Temperature Sensor |
| 2 |
Total
Functional Requirements:
Unit must be able to function in the laboratory, mobile laboratory or in the field. The unit parameters must meet the following minimum detection limits and useable in the following linear ranges. The unit must be accessible by multiple users and be able to calibrate or replace probes in the field if necessary.
Sensor Performance Criteria
| APPLICATION |
| Minimum Detection Limit |
| Linear Range |
| Chlorophyll |
| 0.1 ug/l |
| 0-500 |
| μg/L |
| Phycocyanin |
| 220 cells/ml |
| 0-100,000 |
| cells/ml |
| Optical Dissolved Oxygen |
| 0.1 mg/l |
| 0-50 |
| mg/l |
| Chlorophyll a |
| 0.1 ug/l |
| 0.1 - 500 |
| ug/l |
| Turbidity |
| 0.1 NTU |
| 0- 1000 |
| NTU |
| Temperature |
| -5C |
| -5 - 50 |
| C |
| PAR |
| 1 umol s- 1m -2 |
| 0 - 10,000 |
| umol |
| Depth |
| 0.01 meters |
| 0 to 200 |
| meters |
| Blue Green Algae |
| 50 cells/mL |
| 100-1,000,000 |
| cells/ml |
| pH |
| 0.2 SU |
| 0 - 14 |
| SU |
| Conductivity |
| 0.001 mS/cm |
| 0 - 100 |
| mS/cm |
| CDOM |
| 0.1 ug/l |
| 1 - 500 |
| ug/l |
Physical Requirements:
Setup needs to be less than a total weight of 150 lbs.
Unit must be field serviceable in under 1 hour.
Applicable Standards:
Unit must meet at a minimum part of section 508 of government technology standards.
Unit must be drop proof to 3 feet (1 meter) per MIL-STD 810F method 516.5 Unit must be water resistant to heavy rain and wind per IP 65 Standard.
All electrical must meet NEMA standards for outdoor use.
Interface Requirements:
Unit must be able to be calibrated by end user routinely.
Unit must be able to export data to a PC and Internet site.
Unit must be able to be calibrated with a datalogger for use in the field and a PC for use in the laboratory.
Installation Requirements:
None, will be done by EPA Employee Technical support staff must be available Monday-Friday 8AM to 5 PM EST to answer questions. System must be provided as a complete functioning package.
Training Requirements:
None, user manual acceptable On call as needed during work day.
Service and Support Requirements (consider options for future years):
No service or support necessary due to the design of the unit and field ruggedness.
Vendor must have technical support staff available for troubleshooting in the field.
Reporting and Documentation Requirements:
Must be able to connect to PC through a RS-232, 9-pin connector or USB port in ASCII format.
Initial Calibration must be documented from the manufacturer for each analytical module delivered.
Delivery Schedule:
Entire System Requested by August 31, 2012.
Acceptance Schedule and Constraints:
The unit will not be accepted if physically damaged and/or unit is unable to meet required calibration procedure in the manual.
Sustainable Acquisition Please consider Environmentally Preferable Products and Procedures in performance of this effort.
File details come from the government source that posted it. Updated .