Environmental Chamber - SOW .pdf
PDF 30 KB Posted
- Solicitation number
- N0017424R0041
About this file
This solicitation requests quotes for the disassembly, packaging for removal, and installation services described in the statement of work. The Naval Surface Warfare Center seeks a contractor to disassemble an existing Conrad environmental chamber, package it for disposal, and install a new Thermotron chamber at its Picatinny Arsenal facility in New Jersey within 180 days of the Thermotron's delivery on April 12, 2024. The contractor must inspect and adjust electrical connections, disassemble the Conrad unit, prepare the test lab for the new chamber, install the Thermotron unit and associated electrical and air components, and perform startup testing to ensure proper chamber functioning. Quotes are due by February 22, 2024 and will be evaluated based on technical acceptability and price. The award will be made to the responsible vendor submitting the lowest priced technically acceptable quote.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Posting- N0017424R0041.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental Chamber
STATEMENT OF WORK
Disassembly, Packaging for Removal of Conrad Environmental Chamber and
Installation of Thermotron Chamber
1. GENERAL
The Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division, Picatinny
Detachment (Code G1) requires the disassembly and packaging of the Conrad environmental chamber and the installation and set up of the new Thermontron Environmental system. The units are identified in Table 1. Each of these units provides temperature and humidity conditioning of items in preparation for environmental testing. Note that three of these units have attached chambers and the fourth is a conditioning unit without an attached chamber.
This unit is used for conditioning a remotely built, insulated box. The on-site location of all four units is Building
458 at Picatinny Arsenal, New Jersey. The period of performance shall begin with the disassembly of the current unit and will finish with the final installation of the new Thermotron system. The period is not to exceed 180 days following the delivery of the Thermotron system.
2. SCOPE
The Government requires on-site contractor support for the removal of the current Conrad environmental conditioning unit (makes and models listed in Table 1). This support shall consist of the following firm-fixed price services
Disassembly of the Conrad Chamber to include recovery of all refrigerants
Package and prepare the disassembled chamber for DRMO
Provide rigging services to place new unit into the test facility
Install and connect the new system to ensure functionally to include; pipe hook ups, electrical connections, compressed air with drain line
Startup testing and functional check of the new system.
Rigging Services
TABLE 1. Environmental Conditioning Units to be Covered under Contract.
Conditioning
Unit
Manufacturer
Model # Serial # Unit Type Chamber
Dimensions
Conrad WD-1024-20-25 8575 Conditioning unit with attached
Chamber
10ft x 10ft x
23.2ft
Thermotron WS-1024-CHM-30-30 To be assigned at time of manufacture
Conditioning unit with attached
Chamber
10ft x 10ft x
23.5ft
3. REQUIREMENTS
3.1 Labor. The contractor shall provide preventative labor for both conditioning units listed in Table 1:
Inspect all electrical connections and adjust as needed
Disassemble current Conrad Environmental unit.
Package the disassembled unit for shipment and DRMO
Prepare area in the test lab for the installation of new chamber
Install new Thermotron unit in the test lab
Install all electrical components
Install compressed airlines
Drain and dispose of previous refrigerants and fluids.
3.2 Startup Service. The contractor shall provide startup service for all conditioning units, which shall coincide with the execution of the installation of the new chamber. Startup service shall consist of the following:
Functionality testing
Diagnostic testing
Tolerance check to ensure proper chamber functioning
Environmental Chamber
3.3 Material. The contractor shall provide all material for the 2 units, as required, consisting of the following.
This cost will be listed under a separate contract line item and will have a not-to-exceed (NTE) amount.
Connections for electrical
Connections for water piping installation.
Tooling required for assembly
3.4 Rigging. The Contractor shall provide rigging for the unloading of the new Thermotron environment chamber from the shipping truck, and placing the new Thermotron chamber at the installation location.
4. SCHEDULE AND PERFORMANCE REQUIREMENTS
4.1 Disassembly and installation Schedule. Disassembly shall be completed on the existing Conrad
Environmental unit prior to the delivery of the new enviormental chamber. The current delivery of the new chamber is scheduled for 12 APR 2024.