Enviromental Risk Assement SOQ(C) SOW 4-1-2023.docx
DOCX document 32 KB Posted
- Solicitation number
- 70Z04523-Q-KODI0050
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ SF-18 ENVIRONMENTAL RISK ASSESSMENT.pdf | ||
| 4166-22 SOQ-C clearance report 1-17-2023.pdf | ||
| SOQ C Drawings- Floor plans.pdf | ||
| 15-5687 WAGE DETERMINATION REV19.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
State-Certified Contractor to Conduct Environmental Risk Assessments at CG Housing, Kodiak, AK
1.0 Scope: Provide all services necessary to conduct a thorough risk assessment in accordance with EPA and HUD guidelines for (1) housing unit at CG Base Kodiak, Alaska for asbestos-containing materials (ACM), lead-based paint (LBP), lead dust, and radon. The risk assessments must include an on-site investigation to determine the presence, type, severity, and location of LBP, lead dust, ACM and Radon hazards (including lead hazards in paint, dust, and soil) and provide recommendations to control or eliminate them. The risk assessments shall be performed only by a certified lead and asbestos risk assessor. Certification as an industrial hygienist, professional engineer, or registered architect is not required to perform these assessments. The risk assessment shall include interior, exterior and outdoor areas of housing, adjacent structures and child play/high traffic areas (at each housing unit and common play areas).
All samples will be collected following appropriate methods, documented using a chain of custody, and analyzed by appropriately accredited laboratories in accordance with federal/state requirements and industry standards.
2.0 Government Supplied information: Available historical sample data, and inspection and risk assessment reports for lead, asbestos and radon will be provided to the contractor in advance for awareness. Available housing diagrams and floor plans will be made available to the Contractor.
| 2.1 | Work Required: The contractor shall provide a complete lead risk assessment, asbestos survey, and radon assessment. These findings shall be detailed in a formal report for each housing unit listed below. The report shall follow the format described in the HUD Risk Assessment and Reevaluation publication. |
| 3.0 | Inspection Process: The assessment will follow federal and state requirements for a complete and thorough evaluation and risk determination of ACM, lead and radon hazards. |
| 4.0 | Buildings: Included in this scope are the following addresses in Kodiak, AK 99615: |
| a) | 151 Parks Circle (SOQ-C) |
5.0 Schedule:
House is currently going through a major interior remodel. The ERA can’t be completed until the completion of the major interior remodel; Estimated Completion June 19th 2023. ERA will be completed within 3 days of the major interior remodel being completed. If the major interior remodel project completion day is extended government will insure to keep contractor up to date and adjust ERA completion.
Contractor shall submit a schedule of work to the Contracting Officer for approval. Once the schedule is approved, conformance to the approved schedule is mandatory. CG Housing personnel will make notification to the affected residents of the work schedule.
6.0 Reporting: Formal assessment reports shall provide a comprehensive risk assessment for each housing unit in accordance with EPA and HUD Guidelines for Risk Assessments. The reports will document detailed findings of material conditions, potential for disturbance, sample results; presence, type, severity, and location of hazards to include diagrams and pictures, and provide recommendations for the control each hazard based on local regulatory requirements.
7.0 Final Submittal: Assessment reports shall be completed and submitted no more than 14 days after receipt of laboratory sample results.
8.0 POC & COTR: The POC for this project is Mr. Tim Truitt, (907) 487-5170 ext. 6641. The local COTR at CG Base Kodiak is DCC Justin Gordon, (907) 487-5170 ext. 6680. All work related contact shall be through the COTR. The Contracting Officer will be identified in the contract documents when issued.
Attachments:
· SOQ C Drawings- Floor plans
· 4166-22 SOQ-C clearance report
Version 2.0 (2/10/2023)
File details come from the government source that posted it. Updated .