Attachment (J)

Tomahawk Block IV Engine Igniter SOW

Table of Contents

1 INTRODUCTION

2 APPLICABLE DOCUMENTS

3 REQUIREMENTS

4 DELIVERABLES

Summary of Tables

Table 1: CDRL Submittals

Summary of Figures

Figure 1: Tomahawk Engine Igniter Figure 2: Tail Section View Displaying Engine Igniter Location

1 INTRODUCTION

1.1 Scope. This statement of work (SOW) defines the Contractor’s efforts required to conduct non-destructive and destructive/functional testing of twelve (12) Government-Furnished Tomahawk Block IV F415 Engine Igniters (Pacific Scientific P/N 15936-05)).

1.2 Order of Precedence. In the event of inconsistency among requirements, the following descending order of precedence shall apply:

a. The Delivery Order including Statement of Work

b. Item Specifications

1.3 Background. FY23 will be the third Service Life Assessment Program (SLAP) testing of the Tomahawk Block IV F415 Engine Igniter. Testing shall be conducted with the process, procedures, and equipment consistent with those used in the latest revision of TP-15936. The Naval Surface Warfare Center, Indian Head Division (NSWC IHD), Code E14 manages the engine igniter program and will furnish the fleet-returned units.

The main objectives of the Engine Igniter Service Life Assessment Program (SLAP) include but are not limited to:

• Monitor any changes occurring with age in the physical condition and functional performance of the engine igniter after exposure to various deployment environments.

• Evaluate the effects of changes discovered on the engine igniter performance and predict a safe service life.

• Evaluate the feasibility of service life extensions.

1.4 Item Description. The Tomahawk Block IV F415 Engine Igniter, shown in Figure 1, is used to start the turbofan engine after rocket motor burnout at the start of the mission cruise phase. The pyrotechnic igniter consists of a one-shot, expendable design with an integral single bridgewire electric initiator and shielded leads. It contains ignition booster components and a main pyrotechnic charge. The Initiator, when electrically signaled, fires and ignites the ignition components which in turn ignite the main ignition charge. The burning products are discharged through an exhaust nozzle. The energy released ignites the fuel in the engine combustion chamber, aiding in engine start. This sealed device contains a mixture of zirconium, potassium perchlorate, boron, potassium nitrate, calcium chromate, and tellurium dioxide, and a sealed output load of zirconium, potassium perchlorate, magnesium, Teflon and Viton B.

Figure 1: Tomahawk F415 Engine Igniter

Figure 2 shows a tail section of a Tomahawk Missile with an indication of installation placement of the engine igniter.

Figure 2: Tail Section View Displaying Engine Igniter Location

2 APPLICABLE DOCUMENTS

2.1 William International

57817 Igniter, Specification

2.2 Pacific Scientific Energetic Material Company

15936 Engine Igniter Drawing TP-15936 Lot Acceptance Test Procedure for Igniter Assembly PSEMC PN 15936 (latest revision)

3 REQUIREMENTS

3.1 Pre-Test

3.1.1 Receiving. The Contractor shall receive and uncrate twelve (12) Tomahawk Block IV Engine Igniters shipped from NSWC IHD.

3.1.2 Inspection. Visually inspect the igniters after they are uncrated. Units shall be visually inspected for defects in workmanship, service-related damage, and conformance to applicable drawings and TP-15936, Pacific Scientific Lot Acceptance Test Procedure for the Igniter Assembly P/N 15936.

Note any anomalies on the pre-test inspection sheet. Units shall be radiographically (x-ray) inspected per standard Contractor procedures. Note the results and any anomalies in an x-ray inspection sheet.

3.1.3 Photos. Provide photographic coverage (still and video) of any anomalies as requested by NSWC IHD Code E14.

3.2 Destructive/Functional Tests

3.2.1 All twelve (12) units should be static fired using the latest revision of TP-15936. Six (6) units shall be fired at -51 °F and six (6) units fired at 160 °F. Table 1 is a test matrix of serial numbers, lot numbers, and the test temperature.

Table 1: Test Matrix

Serial Number (S/N) Lot Number Test Temperature (°F)

GB0023 HLX99D002-001 -51

GB0166 HLX04B004-001 -51

GB01030 HLX04E005-001 -51

GB05037 HLX04L006-001 -51

GB05412 MSV05E001A002 -51

GB06481 MSV05L002-008 -51

GB0169 HLX04B004-001 160

GB00192 HLX04B004-001 160

GB05038 HLX04L006-001 160

TBD MSV05L002-008 160

TBD MSV05M002-010 160

TBD MSV06A002-012 160

3.3 Test Dates

3.3.1 Functional testing shall be completed no later than 120 days after receipt of Government Furnished Material.

3.4 On-Site Visit and Coordination

3.4.1 Pacific Scientific shall notify the NSWC IHD at least twelve (12) calendar days prior to ballistic testing, so representatives can make travel arrangements to witness functional testing. During on-site visit, NSWC IHD technical representative(s) shall observe test setup for all testing.

3.5 Disposal of Test Sample

3.5.1 Any unit(s) that does not meet performance specification requirements shall be shipped back to NSWC IHD or disposed of at the discretion of the NSWC IHD Technical Representative. All other units can be properly disposed of by the Contractor after all Contract Data Requirements Lists (CDRLs) have been accepted by NSWC IHD.

4 DELIVERABLES

4.1 Management Reviews. The Contractor shall conduct Program Management/Technical Reviews.

The review shall include a Test Readiness Review (TRR), and a qualification Test Report Review.

Meeting frequency and location are specified as listed below:

1 TRR (at Contractor and can be combined with functional testing) to include review of TP-15936 requirements and methods of verification 1 Test Report review (at Contractor or audio or video conference with NSWC IHD concurrence)

4.2 Technical Report-Study/Services (CDRL A001)

Quick look Submission – In accordance with CDRL A001 (Technical Report–Study/Services) and as requested by NSWC IHD, Code E14, a copy of functional test data (including any non-conformance information for any unit(s) that does not meet the requirements set forth in Pacific Scientific TP-15936), results, and test equipment list (including calibration information) shall be provided within five (5) working days after the completion of the functional testing.

Final Submission – In accordance with CDRL A001 (Technical Report–Study/Services), an electronic report including all performance criteria in Pacific Scientific TP-15936, photographs, and video in a file format compatible with Microsoft Word and Excel shall be provided to NSWC IHD Code E14 within fifteen (15) working days of completion of functional testing. Reporting should include as a minimum, all data specified in Pacific Scientific TP-15936 for testing from FY15, FY18, and FY23 along with associated lot acceptance data.

4.2.1 CDRL Summary

Table 2: CDRL Submittals

CDRL

NUMBER

TITLE QUICK LOOK

SUBMISSION

FINAL SUBMISSION

CDRL A001 Technical Report– Study/Services (SOW paragraph 3.1 and 3.2)

Provided as requested within five (5) working days of completion of ballistic testing

Within fifteen (15) working days of completion of ballistic testing

4.3 Deliverable Addresses

The address for data is:

1. NSWC IHD

ATTN: CODE E14

3703 Benson Rd Building 3157, Room 324M Indian Head, MD 20640-5002

1 INTRODUCTION
1.1 Scope. This statement of work (SOW) defines the Contractor’s efforts required to conduct non-destructive and destructive/functional testing of twelve (12) Government-Furnished Tomahawk Block IV F415 Engine Igniters (Pacific Scientific P/N 15936-0...
1.2 Order of Precedence. In the event of inconsistency among requirements, the following descending order of precedence shall apply:
1.3 Background. FY23 will be the third Service Life Assessment Program (SLAP) testing of the Tomahawk Block IV F415 Engine Igniter. Testing shall be conducted with the process, procedures, and equipment consistent with those used in the latest revis...
1.4 Item Description. The Tomahawk Block IV F415 Engine Igniter, shown in Figure 1, is used to start the turbofan engine after rocket motor burnout at the start of the mission cruise phase. The pyrotechnic igniter consists of a one-shot, expendable de...
2 APPLICABLE DOCUMENTS
2.1 William International
57817 Igniter, Specification
2.2 Pacific Scientific Energetic Material Company
15936 Engine Igniter Drawing
3 REQUIREMENTS
3.1 Pre-Test
3.1.1 Receiving. The Contractor shall receive and uncrate twelve (12) Tomahawk Block IV Engine Igniters shipped from NSWC IHD.
3.1.2 Inspection. Visually inspect the igniters after they are uncrated. Units shall be visually inspected for defects in workmanship, service-related damage, and conformance to applicable drawings and TP-15936, Pacific Scientific Lot Acceptance Test...
3.1.3 Photos. Provide photographic coverage (still and video) of any anomalies as requested by NSWC IHD Code E14.
3.2 Destructive/Functional Tests
3.2.1 All twelve (12) units should be static fired using the latest revision of TP-15936. Six (6) units shall be fired at -51 F and six (6) units fired at 160 F. Table 1 is a test matrix of serial numbers, lot numbers, and the test temperature.
3.3 Test Dates
3.3.1 Functional testing shall be completed no later than 120 days after receipt of Government Furnished Material.
3.4 On-Site Visit and Coordination
3.4.1 Pacific Scientific shall notify the NSWC IHD at least twelve (12) calendar days prior to ballistic testing, so representatives can make travel arrangements to witness functional testing. During on-site visit, NSWC IHD technical representative(s...
3.5 Disposal of Test Sample
3.5.1 Any unit(s) that does not meet performance specification requirements shall be shipped back to NSWC IHD or disposed of at the discretion of the NSWC IHD Technical Representative. All other units can be properly disposed of by the Contractor aft...
4 DELIVERABLES
4.1 Management Reviews. The Contractor shall conduct Program Management/Technical Reviews. The review shall include a Test Readiness Review (TRR), and a qualification Test Report Review. Meeting frequency and location are specified as listed below:
4.2 Technical Report-Study/Services (CDRL A001)
4.3 Deliverable Addresses