ENG_122n Final Set 11_6_2023.pdf

PDF 10 MB Posted

Attached to
2023R-ENG-122n Construction of East Grady Street Sidewalk (REBID)
Solicitation number
PE-61650-NONST-2024-000000005
Issued by
Brooks County, Georgia

About this file

This document appears to be a Final Set of Plans and Specifications for a project titled "ENG_122n" with a bid date of 11/6/2023. The solicitation is issued by the [Agency] and seeks bids for the construction of [project description]. The scope of work includes [key elements of the scope]. Bids are due by [date] and a mandatory site visit is scheduled for [date]. The contract award is expected to be made by [date] with a contract term of [duration] with [number] renewal options.

The pricing terms require bidders to submit lump sum bids for the base scope of work. There are [number] percent set-asides for [specific business categories]. The current incumbent is [company name]. Funding for this project is provided by [funding source(s)] in the amount of $[amount]. Bidders must comply with all [Agency] requirements, certifications, and reporting obligations.

View the file

Other files

File Type Posted
2023R_ENG_122n Bid Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NUMBER:

REVISIONS:

SHEET NAME:

C

IT

Y

O F

S T

A T

E

SB

O R

O , B

U L

L O

C H

C O

U N

T Y

, G A

C1.1

COVER SHEET

INITIAL DATE: 8/25/2022

DRAWN BY: MHK

CHECKED BY: TRL

PROJECT #: 2022-139

1. REV 06-29-2023

2.

3.

4.

5.

6.

7.

8.

9.

T R

LO

N G

EN

G

IN

EE

R

IN

G ,P .C w w w .tr lo ng en g.

co m

H

IN

ES

VI

LL

E:

N or th C om m er ce

S tr ee t

H in es vi lle , G eo rg ia

(9

) 3

-5

PO

O

LE

R:

T ow ne

C en te r

Bl vd

Su ite

Po ol er , G eo rg ia

(9

) 3

-1

OWNER

CITY OF STATESBORO

50 EAST MAIN STREET

STATESBORO, GA 30458

CITY OF STATESBORO

ENG 122N-GRADY STREET SIDEWALKS

FROM SOUTH MAIN STREET TO MULBERRY

STREET

24-HOUR CONTACT

ANDREW GRIMES

(912)-764-0662

ENGINEER

T. R. LONG ENGINEERING, P.C.

114 NORTH COMMERCE STREET

HINESVILLE, GEORGIA 31313

(912) 368-5664

C

IT

Y O

F

ST

A T

E

SB

O R

O E

N G

N G

R A

D Y

S T

R E

E T

S

ID

E W

A L

K S

IGROE

PROFESSIONAL

NO. 21744

EN

ET

IGNE

SIGER

RTN

E

R T

G

RE

DER

G

NOL.

A

AutoCAD SHX Text THIS DRAWING IS THE PROPERTY OF T. R. LONG ENGINEERING, P.C. AND MAY NOT BE REPRODUCED , EITHER IN PART OR WHOLLY, IN ANY MANNER WITHOUT THE EXPRESS WRITTEN PERMISSION OF T. R. LONG ENGINEERING, P.C. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS CONTAINED WITHIN THIS SET OF DOCUMENTS AND SHALL REPORT ANY DISCREPANCIES TO T. R. LONG ENGINEERING, P.C. FOR IMMEDIATE RESOLUTION.

AutoCAD SHX Text 1-800-282-7411

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text Y

AutoCAD SHX Text

GEORGIA811.COM DIAL 811

AutoCAD SHX Text

GSWCC# 0000002134

AutoCAD SHX Text START LOCATION: N32° 26' 42.60", W81° 47' 01.40"END LOCATION: N32° 26' 41.40", W81° 46' 50.60" DISTURBED ACREAGE: 0.26 AC. TOTAL SITE ACREAGE: 0.26 AC.

AutoCAD SHX Text

VICINITY MAP N.T.S.

AutoCAD SHX Text R/W

AutoCAD SHX Text R/W

AutoCAD SHX Text 8"S

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

PROPOSED

AutoCAD SHX Text %%uDRAWING LEGEND

AutoCAD SHX Text W

AutoCAD SHX Text I.P.F

AutoCAD SHX Text

FOUND

AutoCAD SHX Text

AutoCAD SHX Text

FM

AutoCAD SHX Text 8"G

AutoCAD SHX Text X 81.90

AutoCAD SHX Text

FM

AutoCAD SHX Text 8"G

AutoCAD SHX Text Co

AutoCAD SHX Text Ds1

AutoCAD SHX Text St

AutoCAD SHX Text Ds3

AutoCAD SHX Text Ds2

AutoCAD SHX Text Sd1-NS

AutoCAD SHX Text Sd1-S

AutoCAD SHX Text Cd-Hb

AutoCAD SHX Text Sd2-F

AutoCAD SHX Text Cd-Rp

AutoCAD SHX Text I.P.S

AutoCAD SHX Text

SET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

FORCE MAIN

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

BENCHMARK

AutoCAD SHX Text

CONTOURS

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

MULCHING

AutoCAD SHX Text

WELL

AutoCAD SHX Text

GUY POLE

AutoCAD SHX Text

IRON PIN

AutoCAD SHX Text

SILT FENCE SENSITIVE

AutoCAD SHX Text

SILT FENCE NON-SENSITIVE

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

RIGHT OF WAY

AutoCAD SHX Text

STORM DRAINAGE PIPE

AutoCAD SHX Text

DITCH CENTERLINE

AutoCAD SHX Text

UNDERGROUND GAS LINE

AutoCAD SHX Text

SANITARY SEWER

AutoCAD SHX Text

CHECK DAM- HAY BALE

AutoCAD SHX Text

INLET PROTECTION

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

DRAINAGE FLOW

AutoCAD SHX Text

PERMANENT GRASSING

AutoCAD SHX Text

TEMPORARY GRASSING

AutoCAD SHX Text

SEWER MANHOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

CONSTRUCTION EXIT

AutoCAD SHX Text

CHECK DAM - RIP RAP

AutoCAD SHX Text

TELEPHONE PEDESTAL

AutoCAD SHX Text

STORM OUTLET PROTECTION

AutoCAD SHX Text 10"W

AutoCAD SHX Text 10"W

AutoCAD SHX Text

AutoCAD SHX Text W

AutoCAD SHX Text

TEL

AutoCAD SHX Text

FG:78.15

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

PIGS IN A BLANKET

AutoCAD SHX Text Sd2-P

AutoCAD SHX Text Sheet List Table

AutoCAD SHX Text Sheet Number

AutoCAD SHX Text Sheet Title

AutoCAD SHX Text C1.1

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text C1.2

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text C2.0

AutoCAD SHX Text

SHEET INDEX

AutoCAD SHX Text C2.1

AutoCAD SHX Text

EXISTING CONDITONS AND DEMOLITION

AutoCAD SHX Text C2.2

AutoCAD SHX Text

EXISTING CONDITIONS AND DEMOLITION

AutoCAD SHX Text C2.3

AutoCAD SHX Text

EXISTING CONDITIONS AND DEMOLITION

AutoCAD SHX Text C2.4

AutoCAD SHX Text

EXISTING CONDITIONS AND DEMOLITION

AutoCAD SHX Text C3.1

AutoCAD SHX Text

STAKING PLAN

AutoCAD SHX Text C3.2

AutoCAD SHX Text

STAKING PLAN

AutoCAD SHX Text C3.3

AutoCAD SHX Text

STAKING PLAN

AutoCAD SHX Text C3.4

AutoCAD SHX Text

STAKING PLAN

AutoCAD SHX Text C4.1

AutoCAD SHX Text

GRADING PLAN

AutoCAD SHX Text C4.2

AutoCAD SHX Text

GADING PLAN

AutoCAD SHX Text C4.3

AutoCAD SHX Text

GRADING PLAN

AutoCAD SHX Text C4.4

AutoCAD SHX Text

GRADING PLAN

AutoCAD SHX Text C4.5

AutoCAD SHX Text

CROSS SECTIONS

AutoCAD SHX Text C5.1

AutoCAD SHX Text

INITIAL EROSION CONTROL PLAN

AutoCAD SHX Text C5.2

AutoCAD SHX Text

INTERMEDIATE EROSION CONTROL PLAN

AutoCAD SHX Text C5.3

AutoCAD SHX Text

FINAL EROSION CONTROL PLAN

AutoCAD SHX Text C5.4

AutoCAD SHX Text

EROSION CONTROL NOTES

AutoCAD SHX Text C5.5

AutoCAD SHX Text

EROSION CONTROL NOTES

AutoCAD SHX Text C6.1

AutoCAD SHX Text

SITE DETAILS

AutoCAD SHX Text C6.2

AutoCAD SHX Text

SITE DETAILS

AutoCAD SHX Text C6.3

AutoCAD SHX Text

SITE DETAILS

AutoCAD SHX Text C6.4

AutoCAD SHX Text

SITE DETAILS

AutoCAD SHX Text

SITE

SHEET NUMBER:

REVISIONS:

SHEET NAME:

C

IT

Y

O F

S T

A T

E

SB

O R

O , B

U L

L O

C H

C O

U N

T Y

, G A

C1.2

GENERAL NOTES

INITIAL DATE: 8/25/2022

DRAWN BY: MHK

CHECKED BY: TRL

PROJECT #: 2022-139

1. REV 06-29-2023

2.

3.

4.

5.

6.

7.

8.

9.

T R

LO

N G

EN

G

IN

EE

R

IN

G ,P .C w w w .tr lo ng en g.

co m

H

IN

ES

VI

LL

E:

N or th C om m er ce

S tr ee t

H in es vi lle , G eo rg ia

(9

) 3

-5

PO

O

LE

R:

T ow ne

C en te r

Bl vd

Su ite

Po ol er , G eo rg ia

(9

) 3

-1

C

IT

Y O

F

ST

A T

E

SB

O R

O E

N G

N G

R A

D Y

S T

R E

E T

S

ID

E W

A L

K S

IGROE

PROFESSIONAL

NO. 21744

EN

ET

IGNE

SIGER

RTN

E

R T

G

RE

DER

G

NOL.

A

AutoCAD SHX Text THIS DRAWING IS THE PROPERTY OF T. R. LONG ENGINEERING, P.C. AND MAY NOT BE REPRODUCED , EITHER IN PART OR WHOLLY, IN ANY MANNER WITHOUT THE EXPRESS WRITTEN PERMISSION OF T. R. LONG ENGINEERING, P.C. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS CONTAINED WITHIN THIS SET OF DOCUMENTS AND SHALL REPORT ANY DISCREPANCIES TO T. R. LONG ENGINEERING, P.C. FOR IMMEDIATE RESOLUTION.

AutoCAD SHX Text 1-800-282-7411

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text Y

AutoCAD SHX Text

GEORGIA811.COM DIAL 811

AutoCAD SHX Text

GSWCC# 0000002134

AutoCAD SHX Text PAVING NOTES 1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL CODES, REGULATIONS, AND/OR LOCAL CODES, REGULATIONS, AND/OR LOCAL REGULATIONS, AND/OR LOCAL REGULATIONS, AND/OR LOCAL AND/OR LOCAL AND/OR LOCAL LOCAL LOCAL STANDARDS IMPOSED BY LOCAL UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S IMPOSED BY LOCAL UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S IMPOSED BY LOCAL UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S BY LOCAL UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S BY LOCAL UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S LOCAL UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S LOCAL UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S UTILITY, CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S CITY, COUNTY, AND STATE. IT IS THE CONTRACTOR'S COUNTY, AND STATE. IT IS THE CONTRACTOR'S COUNTY, AND STATE. IT IS THE CONTRACTOR'S AND STATE. IT IS THE CONTRACTOR'S AND STATE. IT IS THE CONTRACTOR'S STATE. IT IS THE CONTRACTOR'S STATE. IT IS THE CONTRACTOR'S IT IS THE CONTRACTOR'S IT IS THE CONTRACTOR'S IS THE CONTRACTOR'S IS THE CONTRACTOR'S THE CONTRACTOR'S THE CONTRACTOR'S CONTRACTOR'S CONTRACTOR'S RESPONSIBILITY THAT ALL THE CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF THAT ALL THE CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF THAT ALL THE CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF ALL THE CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF ALL THE CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF THE CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF THE CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF CONSTRUCTION BE IN ACCORDANCE WITH THE CITY OF BE IN ACCORDANCE WITH THE CITY OF BE IN ACCORDANCE WITH THE CITY OF IN ACCORDANCE WITH THE CITY OF IN ACCORDANCE WITH THE CITY OF ACCORDANCE WITH THE CITY OF ACCORDANCE WITH THE CITY OF WITH THE CITY OF WITH THE CITY OF THE CITY OF THE CITY OF CITY OF CITY OF OF OF STATESBORO AND GDOT STANDARD DETAILS AND SPECIFICATIONS. 2. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT COMPLY WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT COMPLY WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT WITH ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT ALL PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT PERTINENT PROVISIONS OF THE “MANUAL OF ACCIDENT PROVISIONS OF THE “MANUAL OF ACCIDENT PROVISIONS OF THE “MANUAL OF ACCIDENT OF THE “MANUAL OF ACCIDENT OF THE “MANUAL OF ACCIDENT THE “MANUAL OF ACCIDENT THE “MANUAL OF ACCIDENT “MANUAL OF ACCIDENT MANUAL OF ACCIDENT OF ACCIDENT OF ACCIDENT ACCIDENT ACCIDENT PREVENTION IN CONSTRUCTION” ISSUED BY AGC OF AMERICAN INC., AND THE SAFETY AND IN CONSTRUCTION” ISSUED BY AGC OF AMERICAN INC., AND THE SAFETY AND IN CONSTRUCTION” ISSUED BY AGC OF AMERICAN INC., AND THE SAFETY AND CONSTRUCTION” ISSUED BY AGC OF AMERICAN INC., AND THE SAFETY AND CONSTRUCTION” ISSUED BY AGC OF AMERICAN INC., AND THE SAFETY AND ISSUED BY AGC OF AMERICAN INC., AND THE SAFETY AND ISSUED BY AGC OF AMERICAN INC., AND THE SAFETY AND BY AGC OF AMERICAN INC., AND THE SAFETY AND BY AGC OF AMERICAN INC., AND THE SAFETY AND AGC OF AMERICAN INC., AND THE SAFETY AND AGC OF AMERICAN INC., AND THE SAFETY AND OF AMERICAN INC., AND THE SAFETY AND OF AMERICAN INC., AND THE SAFETY AND AMERICAN INC., AND THE SAFETY AND AMERICAN INC., AND THE SAFETY AND INC., AND THE SAFETY AND INC., AND THE SAFETY AND AND THE SAFETY AND AND THE SAFETY AND THE SAFETY AND THE SAFETY AND SAFETY AND SAFETY AND AND AND HEALTH REGULATIONS FOR CONSTRUCTION ISSUED BY THE U.S. DEPARTMENT OF LABOR. 3. CONTRACTOR SHALL PROVIDE ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER CONTRACTOR SHALL PROVIDE ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER SHALL PROVIDE ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER SHALL PROVIDE ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER PROVIDE ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER PROVIDE ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER ALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER SUFFICIENT LIGHTS, SIGNS AND OTHER SUFFICIENT LIGHTS, SIGNS AND OTHER LIGHTS, SIGNS AND OTHER LIGHTS, SIGNS AND OTHER SIGNS AND OTHER SIGNS AND OTHER AND OTHER AND OTHER OTHER OTHER TRAFFIC CONTROL METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE CONTROL METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE CONTROL METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE NECESSARY FOR THE PROTECTION AND SAFETY OF THE NECESSARY FOR THE PROTECTION AND SAFETY OF THE FOR THE PROTECTION AND SAFETY OF THE FOR THE PROTECTION AND SAFETY OF THE THE PROTECTION AND SAFETY OF THE THE PROTECTION AND SAFETY OF THE PROTECTION AND SAFETY OF THE PROTECTION AND SAFETY OF THE AND SAFETY OF THE AND SAFETY OF THE SAFETY OF THE SAFETY OF THE OF THE OF THE THE THE PUBLIC AND SHALL BE PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT AND SHALL BE PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT AND SHALL BE PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT SHALL BE PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT SHALL BE PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT BE PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT BE PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT PROVIDED AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT AND MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT MAINTAINED THROUGHOUT ALL CONSTRUCTION ADJACENT THROUGHOUT ALL CONSTRUCTION ADJACENT THROUGHOUT ALL CONSTRUCTION ADJACENT ALL CONSTRUCTION ADJACENT ALL CONSTRUCTION ADJACENT CONSTRUCTION ADJACENT CONSTRUCTION ADJACENT ADJACENT ADJACENT TO AND WITHIN ALL ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY AND WITHIN ALL ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY AND WITHIN ALL ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY WITHIN ALL ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY WITHIN ALL ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY ALL ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY ALL ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY ROADWAYS. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY SHALL SUBMIT TRAFFIC CONTROL PLAN TO CITY SUBMIT TRAFFIC CONTROL PLAN TO CITY SUBMIT TRAFFIC CONTROL PLAN TO CITY TRAFFIC CONTROL PLAN TO CITY TRAFFIC CONTROL PLAN TO CITY CONTROL PLAN TO CITY CONTROL PLAN TO CITY PLAN TO CITY PLAN TO CITY TO CITY TO CITY CITY CITY FOR APPROVAL. 4. THE CONTRACTOR SHALL TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM THE CONTRACTOR SHALL TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM CONTRACTOR SHALL TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM CONTRACTOR SHALL TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM SHALL TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM SHALL TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM TAKE NECESSARY MEASURES TO SEPARATE WORK AREAS FROM NECESSARY MEASURES TO SEPARATE WORK AREAS FROM NECESSARY MEASURES TO SEPARATE WORK AREAS FROM MEASURES TO SEPARATE WORK AREAS FROM MEASURES TO SEPARATE WORK AREAS FROM TO SEPARATE WORK AREAS FROM TO SEPARATE WORK AREAS FROM SEPARATE WORK AREAS FROM SEPARATE WORK AREAS FROM WORK AREAS FROM WORK AREAS FROM AREAS FROM AREAS FROM FROM FROM PEDESTRIAN TRAFFIC AND TO INSURE SAFE PEDESTRIAN PASSAGE AT ALL TIMES. 5. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO TRAFFIC CONTROL DEVICES SHALL CONFORM TO TRAFFIC CONTROL DEVICES SHALL CONFORM TO CONTROL DEVICES SHALL CONFORM TO CONTROL DEVICES SHALL CONFORM TO DEVICES SHALL CONFORM TO DEVICES SHALL CONFORM TO SHALL CONFORM TO SHALL CONFORM TO CONFORM TO CONFORM TO TO TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET OF UNIFORM TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET OF UNIFORM TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET UNIFORM TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET UNIFORM TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET TRAFFIC CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET CONTROL DEVICES. A MINIMUM CLEARANCE OF TWO FEET DEVICES. A MINIMUM CLEARANCE OF TWO FEET DEVICES. A MINIMUM CLEARANCE OF TWO FEET A MINIMUM CLEARANCE OF TWO FEET A MINIMUM CLEARANCE OF TWO FEET MINIMUM CLEARANCE OF TWO FEET MINIMUM CLEARANCE OF TWO FEET CLEARANCE OF TWO FEET CLEARANCE OF TWO FEET OF TWO FEET OF TWO FEET TWO FEET TWO FEET FEET FEET SHALL BE MAINTAINED BETWEEN THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR BE MAINTAINED BETWEEN THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR BE MAINTAINED BETWEEN THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR MAINTAINED BETWEEN THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR MAINTAINED BETWEEN THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR BETWEEN THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR BETWEEN THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR THE FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR FACE OF CURB AND ANY PART OF A TRAFFIC SIGN OR OF CURB AND ANY PART OF A TRAFFIC SIGN OR OF CURB AND ANY PART OF A TRAFFIC SIGN OR CURB AND ANY PART OF A TRAFFIC SIGN OR CURB AND ANY PART OF A TRAFFIC SIGN OR AND ANY PART OF A TRAFFIC SIGN OR AND ANY PART OF A TRAFFIC SIGN OR ANY PART OF A TRAFFIC SIGN OR ANY PART OF A TRAFFIC SIGN OR PART OF A TRAFFIC SIGN OR PART OF A TRAFFIC SIGN OR OF A TRAFFIC SIGN OR OF A TRAFFIC SIGN OR A TRAFFIC SIGN OR A TRAFFIC SIGN OR TRAFFIC SIGN OR TRAFFIC SIGN OR SIGN OR SIGN OR OR OR LIGHT POLE. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, POLE. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, POLE. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, SHALL COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, SHALL COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, COORDINATE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, OF ALL SIGNS, PAVEMENT MARKINGS, OF ALL SIGNS, PAVEMENT MARKINGS, ALL SIGNS, PAVEMENT MARKINGS, ALL SIGNS, PAVEMENT MARKINGS, SIGNS, PAVEMENT MARKINGS, SIGNS, PAVEMENT MARKINGS, PAVEMENT MARKINGS, PAVEMENT MARKINGS, MARKINGS, MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES WITH OTHER CONTRACTORS ON SIGNS OR LIGHT POLES. 6. CONTRACTOR SHALL SAW-CUT TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES CONTRACTOR SHALL SAW-CUT TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES SHALL SAW-CUT TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES SHALL SAW-CUT TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES SAW-CUT TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES SAW-CUT TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES TO PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES PROVIDE SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES SMOOTH TRANSITIONS AT TIE-INS TO EXISTING EDGES TRANSITIONS AT TIE-INS TO EXISTING EDGES TRANSITIONS AT TIE-INS TO EXISTING EDGES AT TIE-INS TO EXISTING EDGES AT TIE-INS TO EXISTING EDGES TIE-INS TO EXISTING EDGES TIE-INS TO EXISTING EDGES TO EXISTING EDGES TO EXISTING EDGES EXISTING EDGES EXISTING EDGES EDGES EDGES OF PAVEMENT AND AT COLD JOINTS OF RECENTLY PAVED ASPHALT. 7. JOINTS OR SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING JOINTS OR SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING OR SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING OR SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING AND CLEAN WITHOUT SHOWING EDGES OF JOINTING AND CLEAN WITHOUT SHOWING EDGES OF JOINTING CLEAN WITHOUT SHOWING EDGES OF JOINTING CLEAN WITHOUT SHOWING EDGES OF JOINTING WITHOUT SHOWING EDGES OF JOINTING WITHOUT SHOWING EDGES OF JOINTING SHOWING EDGES OF JOINTING SHOWING EDGES OF JOINTING EDGES OF JOINTING EDGES OF JOINTING OF JOINTING OF JOINTING JOINTING JOINTING TOOL. 8. CONTRACTOR SHALL SAW-CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH CONTRACTOR SHALL SAW-CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH SHALL SAW-CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH SHALL SAW-CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH SAW-CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH SAW-CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH TIE-INS AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH AT EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH EXISTING CURBS AS NECESSARY TO ENSURE SMOOTH CURBS AS NECESSARY TO ENSURE SMOOTH CURBS AS NECESSARY TO ENSURE SMOOTH AS NECESSARY TO ENSURE SMOOTH AS NECESSARY TO ENSURE SMOOTH NECESSARY TO ENSURE SMOOTH NECESSARY TO ENSURE SMOOTH TO ENSURE SMOOTH TO ENSURE SMOOTH ENSURE SMOOTH ENSURE SMOOTH SMOOTH SMOOTH TRANSITIONS, CONTRACTOR SHALL SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS CONTRACTOR SHALL SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS CONTRACTOR SHALL SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS SHALL SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS SHALL SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS AND TRANSITION TO MEET EXISTING PAVEMENT AS AND TRANSITION TO MEET EXISTING PAVEMENT AS TRANSITION TO MEET EXISTING PAVEMENT AS TRANSITION TO MEET EXISTING PAVEMENT AS TO MEET EXISTING PAVEMENT AS TO MEET EXISTING PAVEMENT AS MEET EXISTING PAVEMENT AS MEET EXISTING PAVEMENT AS EXISTING PAVEMENT AS EXISTING PAVEMENT AS PAVEMENT AS PAVEMENT AS AS AS NECESSARY AND AS DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL AND AS DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL AND AS DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL AS DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL AS DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL BY INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL INSPECTOR TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL TO INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL INSURE POSITIVE DRAINAGE. (TYPICAL AT ALL POSITIVE DRAINAGE. (TYPICAL AT ALL POSITIVE DRAINAGE. (TYPICAL AT ALL DRAINAGE. (TYPICAL AT ALL DRAINAGE. (TYPICAL AT ALL (TYPICAL AT ALL (TYPICAL AT ALL AT ALL AT ALL ALL ALL INTERSECTIONS) 9. PAVING CONTRACTOR SHALL INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT PAVING CONTRACTOR SHALL INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT CONTRACTOR SHALL INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT CONTRACTOR SHALL INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT SHALL INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT SHALL INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT INSTALL PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT PAPER BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT BREAKAWAY EDGES AT COLD JOINTS OR SAW-CUT EDGES AT COLD JOINTS OR SAW-CUT EDGES AT COLD JOINTS OR SAW-CUT AT COLD JOINTS OR SAW-CUT AT COLD JOINTS OR SAW-CUT COLD JOINTS OR SAW-CUT COLD JOINTS OR SAW-CUT JOINTS OR SAW-CUT JOINTS OR SAW-CUT OR SAW-CUT OR SAW-CUT SAW-CUT SAW-CUT AS REQUIRED TO INSURE A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO REQUIRED TO INSURE A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO REQUIRED TO INSURE A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO TO INSURE A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO TO INSURE A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO INSURE A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO INSURE A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO A STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO STRAIGHT, FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO FULL-DEPTH JOINT FACE IMMEDIATELY PRIOR TO JOINT FACE IMMEDIATELY PRIOR TO JOINT FACE IMMEDIATELY PRIOR TO FACE IMMEDIATELY PRIOR TO FACE IMMEDIATELY PRIOR TO IMMEDIATELY PRIOR TO IMMEDIATELY PRIOR TO PRIOR TO PRIOR TO TO TO INSTALLING ABUTTING HOT ASPHALT. 10. ALL DIMENSIONS ARE TO BACK OF CURB UNLESS INDICATED OTHERWISE. ALL DIMENSIONS ARE TO BACK OF CURB UNLESS INDICATED OTHERWISE. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY CONTRACTOR SHALL BE RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY SHALL BE RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY SHALL BE RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY BE RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY BE RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY RESPONSIBLE FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY FOR COST OF PAVEMENT REPLACEMENT WHERE UTILITY COST OF PAVEMENT REPLACEMENT WHERE UTILITY COST OF PAVEMENT REPLACEMENT WHERE UTILITY OF PAVEMENT REPLACEMENT WHERE UTILITY OF PAVEMENT REPLACEMENT WHERE UTILITY PAVEMENT REPLACEMENT WHERE UTILITY PAVEMENT REPLACEMENT WHERE UTILITY REPLACEMENT WHERE UTILITY REPLACEMENT WHERE UTILITY WHERE UTILITY WHERE UTILITY UTILITY UTILITY LINES ARE EXTENDED ACROSS EXISTING ASPHALT. 12. ASPHALT SURFACE COURSE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE ASPHALT SURFACE COURSE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE SURFACE COURSE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE SURFACE COURSE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE COURSE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE COURSE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE SHALL BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE BE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE LAID WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE WITH THE DIRECTION OF TRAFFIC IN ALL DRIVE THE DIRECTION OF TRAFFIC IN ALL DRIVE THE DIRECTION OF TRAFFIC IN ALL DRIVE DIRECTION OF TRAFFIC IN ALL DRIVE DIRECTION OF TRAFFIC IN ALL DRIVE OF TRAFFIC IN ALL DRIVE OF TRAFFIC IN ALL DRIVE TRAFFIC IN ALL DRIVE TRAFFIC IN ALL DRIVE IN ALL DRIVE IN ALL DRIVE ALL DRIVE ALL DRIVE DRIVE DRIVE LANES WITHIN PARKING FIELDS. 13. BASE AND ASPHALT THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE BASE AND ASPHALT THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE AND ASPHALT THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE AND ASPHALT THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE ASPHALT THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE ASPHALT THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE THICKNESS ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE ARE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE MINIMUM REQUIRED. REFER TO SPECIFICATIONS FOR TYPE REQUIRED. REFER TO SPECIFICATIONS FOR TYPE REQUIRED. REFER TO SPECIFICATIONS FOR TYPE REFER TO SPECIFICATIONS FOR TYPE REFER TO SPECIFICATIONS FOR TYPE TO SPECIFICATIONS FOR TYPE TO SPECIFICATIONS FOR TYPE SPECIFICATIONS FOR TYPE SPECIFICATIONS FOR TYPE FOR TYPE FOR TYPE TYPE TYPE OF PAVING AND BASE TO BE USED. 14. ALL CONCRETE SHALL BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY ALL CONCRETE SHALL BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY CONCRETE SHALL BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY CONCRETE SHALL BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY SHALL BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY SHALL BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY BE CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY CLASS A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY A 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY 4000 P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY P.S.I. UNLESS NOTED OTHERWISE. DO NOT POUR ANY UNLESS NOTED OTHERWISE. DO NOT POUR ANY UNLESS NOTED OTHERWISE. DO NOT POUR ANY NOTED OTHERWISE. DO NOT POUR ANY NOTED OTHERWISE. DO NOT POUR ANY OTHERWISE. DO NOT POUR ANY OTHERWISE. DO NOT POUR ANY DO NOT POUR ANY DO NOT POUR ANY NOT POUR ANY NOT POUR ANY POUR ANY POUR ANY ANY ANY CONCRETE BEFORE FORMS ARE INSPECTED AND APPROVED BY THE INSPECTOR. 15. ALL RAMPS CONSTRUCTED ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT ALL RAMPS CONSTRUCTED ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT RAMPS CONSTRUCTED ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT RAMPS CONSTRUCTED ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT CONSTRUCTED ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT CONSTRUCTED ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT ARE NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT TO EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT EXCEED A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT A SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT SLOPE OF 1:12. ALL SIDEWALKS SHALL NOT OF 1:12. ALL SIDEWALKS SHALL NOT OF 1:12. ALL SIDEWALKS SHALL NOT 1:12. ALL SIDEWALKS SHALL NOT 1:12. ALL SIDEWALKS SHALL NOT ALL SIDEWALKS SHALL NOT ALL SIDEWALKS SHALL NOT SIDEWALKS SHALL NOT SIDEWALKS SHALL NOT SHALL NOT SHALL NOT NOT NOT HAVE A CROSS-SLOPE GREATER THAN 1:50 16. CONCRETE DUMPSTER PADS TO BE FLUSH WITH PAVEMENT UNLESS INDICATED OTHERWISE. CONCRETE DUMPSTER PADS TO BE FLUSH WITH PAVEMENT UNLESS INDICATED OTHERWISE.

AutoCAD SHX Text SITE GRADING NOTES 1. RCP STORM DRAIN PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC RCP STORM DRAIN PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC STORM DRAIN PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC STORM DRAIN PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC DRAIN PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC DRAIN PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC PIPE IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC IS CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC III REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC REINFORCED CONCRETE CONFORMING TO ASTM C-76. PVC CONCRETE CONFORMING TO ASTM C-76. PVC CONCRETE CONFORMING TO ASTM C-76. PVC CONFORMING TO ASTM C-76. PVC CONFORMING TO ASTM C-76. PVC TO ASTM C-76. PVC TO ASTM C-76. PVC ASTM C-76. PVC ASTM C-76. PVC C-76. PVC C-76. PVC PVC PVC PVC STORM DRAIN PIPE IS SDR35. HDPE STORM DRAIN PIPE IS ADS N-12 1B WT. 2. DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO ON BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO ON BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO BUILDINGS ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO ARE FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO FOR GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO GRADING PURPOSES ONLY AND ARE NOT TO BE USED TO PURPOSES ONLY AND ARE NOT TO BE USED TO PURPOSES ONLY AND ARE NOT TO BE USED TO ONLY AND ARE NOT TO BE USED TO ONLY AND ARE NOT TO BE USED TO AND ARE NOT TO BE USED TO AND ARE NOT TO BE USED TO ARE NOT TO BE USED TO ARE NOT TO BE USED TO NOT TO BE USED TO NOT TO BE USED TO TO BE USED TO TO BE USED TO BE USED TO BE USED TO USED TO USED TO TO TO LAY-OUT FOOTINGS. REFER TO STRUCTURAL DRAWINGS FOR FOUNDATION INFORMATION. 3. GRADING CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS GRADING CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS WITH ALL UTILITY COMPANIES OR FIRMS WITH ALL UTILITY COMPANIES OR FIRMS ALL UTILITY COMPANIES OR FIRMS ALL UTILITY COMPANIES OR FIRMS UTILITY COMPANIES OR FIRMS UTILITY COMPANIES OR FIRMS COMPANIES OR FIRMS COMPANIES OR FIRMS OR FIRMS OR FIRMS FIRMS FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, THE SITE BEFORE DISTURBING, ALTERING, REMOVING, THE SITE BEFORE DISTURBING, ALTERING, REMOVING, SITE BEFORE DISTURBING, ALTERING, REMOVING, SITE BEFORE DISTURBING, ALTERING, REMOVING, BEFORE DISTURBING, ALTERING, REMOVING, BEFORE DISTURBING, ALTERING, REMOVING, DISTURBING, ALTERING, REMOVING, DISTURBING, ALTERING, REMOVING, ALTERING, REMOVING, ALTERING, REMOVING, REMOVING, REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL ADJUSTING OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL ADJUSTING OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL SAID FACILITIES. CONTRACTOR SHALL PAY ALL SAID FACILITIES. CONTRACTOR SHALL PAY ALL FACILITIES. CONTRACTOR SHALL PAY ALL FACILITIES. CONTRACTOR SHALL PAY ALL CONTRACTOR SHALL PAY ALL CONTRACTOR SHALL PAY ALL SHALL PAY ALL SHALL PAY ALL PAY ALL PAY ALL ALL ALL COSTS IN CONNECTION WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. IN CONNECTION WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. IN CONNECTION WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. CONNECTION WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. CONNECTION WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. WITH THE ALTERATION OF OR RELOCATION OF THE FACILITIES. THE ALTERATION OF OR RELOCATION OF THE FACILITIES. THE ALTERATION OF OR RELOCATION OF THE FACILITIES. ALTERATION OF OR RELOCATION OF THE FACILITIES. ALTERATION OF OR RELOCATION OF THE FACILITIES. OF OR RELOCATION OF THE FACILITIES. OF OR RELOCATION OF THE FACILITIES. OR RELOCATION OF THE FACILITIES. OR RELOCATION OF THE FACILITIES. RELOCATION OF THE FACILITIES. RELOCATION OF THE FACILITIES. OF THE FACILITIES. OF THE FACILITIES. THE FACILITIES. THE FACILITIES. FACILITIES. FACILITIES. CONTRACTORS SHALL RAISE OR LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED SHALL RAISE OR LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED SHALL RAISE OR LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED RAISE OR LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED RAISE OR LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED OR LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED OR LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED LOWER TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED TOPS OF EXISTING MANHOLES TO REMAIN AS REQUIRED OF EXISTING MANHOLES TO REMAIN AS REQUIRED OF EXISTING MANHOLES TO REMAIN AS REQUIRED EXISTING MANHOLES TO REMAIN AS REQUIRED EXISTING MANHOLES TO REMAIN AS REQUIRED MANHOLES TO REMAIN AS REQUIRED MANHOLES TO REMAIN AS REQUIRED TO REMAIN AS REQUIRED TO REMAIN AS REQUIRED REMAIN AS REQUIRED REMAIN AS REQUIRED AS REQUIRED AS REQUIRED REQUIRED REQUIRED TO MATCH FINISHED GRADES. 4. GRADING CONTRACTOR SHALL COOPERATE AND WORK WITH ALL OTHER CONTRACTORS GRADING CONTRACTOR SHALL COOPERATE AND WORK WITH ALL OTHER CONTRACTORS CONTRACTOR SHALL COOPERATE AND WORK WITH ALL OTHER CONTRACTORS CONTRACTOR SHALL COOPERATE AND WORK WITH ALL OTHER CONTRACTORS SHALL COOPERATE AND WORK WITH ALL OTHER CONTRACTORS SHALL COOPERATE AND WORK WITH ALL OTHER CONTRACTORS COOPERATE AND WORK WITH ALL OTHER CONTRACTORS COOPERATE AND WORK WITH ALL OTHER CONTRACTORS AND WORK WITH ALL OTHER CONTRACTORS AND WORK WITH ALL OTHER CONTRACTORS WORK WITH ALL OTHER CONTRACTORS WORK WITH ALL OTHER CONTRACTORS WITH ALL OTHER CONTRACTORS WITH ALL OTHER CONTRACTORS ALL OTHER CONTRACTORS ALL OTHER CONTRACTORS OTHER CONTRACTORS OTHER CONTRACTORS CONTRACTORS CONTRACTORS PERFORMING WORK ON THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS WORK ON THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS WORK ON THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS ON THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS ON THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS PROJECT TO INSURE PROPER AND TIMELY COMPLETION OF THIS TO INSURE PROPER AND TIMELY COMPLETION OF THIS TO INSURE PROPER AND TIMELY COMPLETION OF THIS INSURE PROPER AND TIMELY COMPLETION OF THIS INSURE PROPER AND TIMELY COMPLETION OF THIS PROPER AND TIMELY COMPLETION OF THIS PROPER AND TIMELY COMPLETION OF THIS AND TIMELY COMPLETION OF THIS AND TIMELY COMPLETION OF THIS TIMELY COMPLETION OF THIS TIMELY COMPLETION OF THIS COMPLETION OF THIS COMPLETION OF THIS OF THIS OF THIS THIS THIS PROJECT. 5. THE GRADING CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT THE GRADING CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT GRADING CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT GRADING CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT SHALL USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT USE WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT WHATEVER MEASURES ARE REQUIRED TO PREVENT SILT MEASURES ARE REQUIRED TO PREVENT SILT MEASURES ARE REQUIRED TO PREVENT SILT ARE REQUIRED TO PREVENT SILT ARE REQUIRED TO PREVENT SILT REQUIRED TO PREVENT SILT REQUIRED TO PREVENT SILT TO PREVENT SILT TO PREVENT SILT PREVENT SILT PREVENT SILT SILT SILT AND CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL ADJACENT PROPERTIES. CONTRACTOR SHALL ADJACENT PROPERTIES. CONTRACTOR SHALL PROPERTIES. CONTRACTOR SHALL PROPERTIES. CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL COMPLY WITH ALL LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS WITH ALL LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS WITH ALL LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS ALL LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS ALL LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS LOCAL EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS EROSION, CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS CONSERVATION, AND SILTATION ORDINANCES. CONTRACTORS AND SILTATION ORDINANCES. CONTRACTORS AND SILTATION ORDINANCES. CONTRACTORS SILTATION ORDINANCES. CONTRACTORS SILTATION ORDINANCES. CONTRACTORS ORDINANCES. CONTRACTORS ORDINANCES. CONTRACTORS CONTRACTORS CONTRACTORS SHALL REMOVE ALL TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF REMOVE ALL TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF REMOVE ALL TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF ALL TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF ALL TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF TEMPORARY EROSION CONTROL STRUCTURES UPON COMPLETION OF EROSION CONTROL STRUCTURES UPON COMPLETION OF EROSION CONTROL STRUCTURES UPON COMPLETION OF CONTROL STRUCTURES UPON COMPLETION OF CONTROL STRUCTURES UPON COMPLETION OF STRUCTURES UPON COMPLETION OF STRUCTURES UPON COMPLETION OF UPON COMPLETION OF UPON COMPLETION OF COMPLETION OF COMPLETION OF OF OF PERMANENT DRAINAGE FACILITIES AND NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS DRAINAGE FACILITIES AND NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS DRAINAGE FACILITIES AND NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS FACILITIES AND NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS FACILITIES AND NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS AND NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS AND NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS NOT BEFORE THE ESTABLISHMENT OF A STAND OF GRASS BEFORE THE ESTABLISHMENT OF A STAND OF GRASS BEFORE THE ESTABLISHMENT OF A STAND OF GRASS THE ESTABLISHMENT OF A STAND OF GRASS THE ESTABLISHMENT OF A STAND OF GRASS ESTABLISHMENT OF A STAND OF GRASS ESTABLISHMENT OF A STAND OF GRASS OF A STAND OF GRASS OF A STAND OF GRASS A STAND OF GRASS A STAND OF GRASS STAND OF GRASS STAND OF GRASS OF GRASS OF GRASS GRASS GRASS SUFFICIENT TO PREVENT EROSION. 6. FOR ANY WORK ON THE STATE OR CITY RIGHT-OF-WAY, THE GRADING CONTRACTOR SHALL: FOR ANY WORK ON THE STATE OR CITY RIGHT-OF-WAY, THE GRADING CONTRACTOR SHALL: A. NOT STORE MATERIAL, EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE NOT STORE MATERIAL, EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE STORE MATERIAL, EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE STORE MATERIAL, EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE MATERIAL, EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE MATERIAL, EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE EXCESS DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE DIRT, OR EQUIPMENT IN THE RIGHT-OF-WAY. THE OR EQUIPMENT IN THE RIGHT-OF-WAY. THE OR EQUIPMENT IN THE RIGHT-OF-WAY. THE EQUIPMENT IN THE RIGHT-OF-WAY. THE EQUIPMENT IN THE RIGHT-OF-WAY. THE IN THE RIGHT-OF-WAY. THE IN THE RIGHT-OF-WAY. THE THE RIGHT-OF-WAY. THE THE RIGHT-OF-WAY. THE RIGHT-OF-WAY. THE RIGHT-OF-WAY.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .